Pikangikum First Nation - Short Term Water and Wastewater Upgrades
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Pikangikum First Nation requires upgrades and repairs to existing water and wastewater infrastructure with short-term work being conducted in a two-phased approach. The Water Treatment Plant is over 30 years old, in poor condition, and under capacity to meet community demands. Similarily, the Wastewater Treatment System is older and in poor condition.
Phase 1: Immediate upgrades to the Water Treatment Plant will include replacement of existing mechanical and electrical components to ensure the systems remain operational with no increased capacity or improvement to treatment/automation. The Wastewater system needs replacement of existing components to ensure operations and improve the working conditions (i.e., health and safety) for operators.
Phase 2: Interim upgrades include the design and installation of a new containerized water treatment system with membrane filtration (10 Litres per second) adjacent to the existing Water Treatment Plant which will be connected to the community's water reservoir and distribution system. The Wastewater system will also have design and installation of a new containerized wastewater treatment system (Moving Bed Biofilm Reactor) which will receive wastewater from a new sewage pumping station, re-routed forcemain and a new maintenance hole. This work will result in moderate increased capacity with a significant improvement in treatment, redundancy, and automation of both the Water and Wastewater Systems.
Longer term recommendations including design and construction of new infrastructure and distribution and collection systems are estimated to take approximately five to seven years following the completion of the phase 1 and 2 works described above.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | Notice of Intent to Make a Determination – Start of Public Comment Period | - | July 20, 2026 |
Contacts
Indigenous Services CanadaMaryJane Moses, Environment Officer
100 Anemki Place
Suite 101
Fort William First Nation, Ontario P7J 1A5
Telephone: 873-452-2426
Email: maryjane.moses@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Pikangikum First Nation - Wastewater (Ontario)
- Pikangikum First Nation - Water (Ontario)
-
Nature of Activity
- Building and Property Development
- Water Management
-
Assessment Status
In progress -
Start Date
2026-07-20 -
Proponent
Pikangikum First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
90629
Nearby assessments
...within 200 kilometres-
Pikangikum Remediation
Pikangikum First Nation -
Pikangikum First Nation - 10 Unit Residential Construction Project
Pikangikum First Nation -
Pikangikum Cultural Learning and Community Centre
Pikangikum First Nation -
Pikangikum First Nation - Nursing Station Fuel Storage Tank System Repairs
Pikangikum First Nation -
Pikangikum Rapid Housing Initiative
Pikangikum First Nation -
New Fibre Installation / Upgrade Multiple Towers
Wunnumin Lake PoP -
New Fibre Installation / Upgrade Multiple Towers
Kasabonika Lake PoP -
New Fibre Installation / Upgrade Multiple Towers
Kewaywin PoP -
New Fibre Installation / Upgrade Multiple Towers
Kasabonika Lake Wireless Tower -
Deer Lake First Nation Small Business Center Project
Deer Lake First Nation -
Construction of 10 Houses within Deer Lake First Nation
Deer Lake First Nation -
Construction of 20 Housing Lots on North Spirit Lake First Nation
North Spirit Lake First Nation -
Demolition of Abandoned Houses in Residential Area on North Spirit Lake First Nation
North Spirit Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Deer Lake PoP -
New Fibre Installation / Upgrade Multiple Towers
Weagamow PoP -
New Fibre Installation
North Spirit Lake -
Little Grand Rapids First Nation Transitional Housing (Temporary Housing)
Little Grand Rapids First Nation -
Pauingassi First Nation Child and Family Services Prevention Building and Staff Housing
Pauingassi First Nation -
Little Grand Rapids First Nation School
Little Grand Rapids First Nation School -
Southeast CFS Little Grand Rapids Staff Housing (Personnel and Visiting Professionals) and Prevention Centre
Little Grand Rapids First Nation -
Aboveground Fuel Storage Replacement in Little Grand Rapids, Manitoba
Little Grand Rapids -
Little Grand Rapids RCMP New Living Quarters
Little Grand Rapids -
Little Grand Rapids Dock & Dock Foundation Posts
Little Grand Rapids -
Little Grand Rapids Submarine Cable Installation Project
Little Grand Rapids -
Great Bear Gold Project
23 kilometres southeast of Red Lake -
Great Bear Advanced Exploration Project
25 kilometres southeast of Red Lake -
Springpole Gold Project
110 kilometres northeast of Red Lake -
Sandy Lake Cultural Area
Sandy Lake -
Sandy Lake First Nation Remediation Project
Sandy Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Muskrat Dam PoP -
Sandy Lake First Nation - Child and Family Services Building
Sandy Lake First Nation -
Sandy Lake First Nation - Child and Family Services Building
Sandy Lake First Nation -
Sandy Lake First Nation - Accommodations Building
Sandy Lake First Nation -
Sandy Lake First Nation - Health Services Building
Sandy Lake First Nation -
Cat Lake First Nation - Subdivision Development Project
Cat Lake First Nation -
Cat Lake First Nation - Lot Servicing for future houses
Cat Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Wapekeka (Angling Lake) PoP -
New Fibre Installation / Upgrade Multiple Towers
Big Trout Lake PoP -
Griffith Iron Ore Redevelopment Project
Ear Falls -
Keewaywin First Nation New Landfill Access Road Construction
Kee-Way-Win First Nation -
Wabauskang First Nation - Lot Servicing Project (20)
Wabauskang First Nation -
New Fibre Installation
Project site 18 (Wabauskang No. 21) -
Hollow Water Wharf Construction
Hollow Water -
Hollow Water First Nation Transitional Spaces
Hollow Water First Nation -
New Fibre Installation
Hollow Water First Nation no.10 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 4: Hollow Water No. 10 -
Hollow Water First Nation Prevention Centre
Hollow Water First Nation -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
New Fibre Installation / Upgrade Multiple Towers
North Spirit Lake PoP -
Slate Falls Nation - Lot Servicing for future houses
Slate Falls Nation -
Grassy Narrows First Nation Water and Wastewater System Upgrades
Grassy Narrows First Nation -
Grassy Narrows - Health Centre Renewal
Grassy Narrows -
Peguis First Nation Landfill Expansion
Peguis First Nation -
Grassy Narrows First Nation 20-unit Apartment Complex
Grassy Narrows First Nation -
Grassy Narrows Long-term Care and Treatment Facility Construction
Grassy Narrows Long-term Care and Treatment Facility Construction -
Grassy Narrows Mercury Care Home - additional Federal Authority
Grassy Narrows First Nation -
Berens River 13 Rapid Housing Fourplexes
Berens River 13 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 3: BCN-BLD-TW3 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 2: BCN-BLD-TW2 -
Bloodvein First Nation School
Bloodvein School -
Bloodvein First Nation CFS Prevention Building
Bloodvein First Nation -
Bloodvein First Nation Staff Housing
Bloodvein First Nation -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 1: BCN-BLD-TW1 -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Bloodvein -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
LSFN Burial Site Mapping
Lac Seul First Nation -
Black River Waste Transfer Station
Black River Reserve -
Gull Harbour Lighthouse Rebuild
Gull Harbour -
Black River First Nation - Transitional Housing
Black River First Nation -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
New Fibre Installation
Black River First Nation no. 9 -
Black River First Nation Prevention Centre
Black River First Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Launch Ramp Replacement, Pine Dock, Manitoba
Pine Dock -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
New Fibre Installation
Project site 11 (Wabaseemoong Independent Nations)