Tio Mine Expansion Project

Rio Tinto Fer et Titane is proposing to expand the Lac Tio Ilmenite mine site, located approximately 40 kilometres north of Havre-Saint-Pierre, which it has mined for 60 years. The project involves no increase in the annual production of 3.1 million tonnes, but the new waste-rock management plan includes the creation of a new waste-rock pile for the storage of 119 million cubic meters of waste-rock that will be generated by the end of the life of the mine and the relocation of the Petit-pas waste-rock pile. The waste-rock pile and associated infrastructure will occupy an area of 1.9 square kilometers, which represents an expansion of more than 75% of the existing area of operations. The project also includes the centralization of water treatment and the construction of a new water treatment plant with a capacity of 745 cubic metres per hour.


Latest update

March 14, 2018 - The Canadian Environmental Assessment Agency terminated the environmental assessment process of the designated project at the request of the proponent.

Participate

Contacts

Impact Assessment Agency of Canada
160 Elgin Street, 22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 613-957-0700 or 1-866-582-1884
Fax: 613-957-0862
Email: information@iaac-aeic.gc.ca


  • Location

    • Havre-Saint-Pierre (Quebec)
  • Nature of Activity

    • Mines and Minerals
  • Assessment Status

    Terminated
  • Proponent

    Rio Tinto Fer et Titane
  • Authorities

    • Canadian Environmental Assessment Agency
  • Assessment Type

    Environmental assessment under CEAA 2012
  • Reference Number

    80078
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

Nearby assessments

...within 200 kilometres
Date modified: