Channel Wall Reconstruction at Fox Island River SCH, NL
The proposed project at Fox Island River SCH includes the demolition, removal, and replacement of the northeastern marginal wharf. In addition to the marginal wharf replacement, the proposed project will include: the replacement of the asphalt parking area; the removal and re-installation of shoreline protection; the installation of a jib crane and light pole; and the installation of a new electrical shed. The existing wharf is composed of steel sheet piling (SSP) walls, tie rods, concrete blocks, and rock fill. The demolition process will require excavation of the existing marginal wharf's footprint, and the existing parking lot area, and the removal of shoreline protection on the southeastern side of the property for later re-installation. The replacement SSP wharf will be constructed in a similar manner to the existing marginal wharf, and be topped off with reinforced concrete slabs. The jib crane will be installed on the northwestern side of the marginal wharf, and the light pole will be installed in the northeastern corner of the marginal wharf. The new electrical shed will be installed on the southeastern side of the property, protected by the re-installed shoreline protection.
Latest update
September 9, 2026 – The federal authorities have determined that the proposed Channel Wall Reconstruction at Fox Island River SCH, NL is not likely to cause significant adverse environmental effects.
This determination was based on a consideration of the following factors:
- impacts on rights of Indigenous peoples;
- Indigenous knowledge;
- community knowledge;
- comments received from the public; and
- technically and economically feasible mitigation measures.
Mitigation measures taken into account for this determination are:
- All work to be conducted in accordance with the Species at Risk Act, which outlines that no protected species, their residence and critical habitat be moved or obstructed during the construction or operation phase of the project.
- Species listed under the Species at Risk Act shall not be approached throughout the construction or operation phase of the project.
- All work to be conducted in accordance with the Migratory Birds Convention Act, which outlines that no migratory bird nests or eggs will be moved or obstructed during the construction or operation phase of the project.
- Concentrations of seabirds, waterfowl, or shorebirds shall not be approached when anchoring equipment, accessing wharves, or ferrying supplies.
- To minimize the possibility of fish habitat contamination and the spread of aquatic invasive (alien) species, all construction equipment which will be immersed into the water or has the possibility of coming into contact with such water during the course of the work, must be cleaned and washed to ensure that they are free of marine growth and alien species.
- Weather conditions are to be assessed on a daily basis to determine the risk of extreme weather in the project areas. Avoid work during periods which Environment and Climate Change Canada has issued rainfall, wind or wave warning for the work area.
- An Erosion and Sediment Control Plan will be developed for the site that minimizes risk of sedimentation to the marine environment.
- Ensure that all in-water activities, or associated in-water structures, do not interfere with fish passage.
- Wash, refuel and service machinery and store fuel and other materials for the machinery in such a way as to prevent any deleterious substances from entering the water.
- Construction material and debris are not to become waterborne. Do not dispose of any materials or waste into marine environment.
- All equipment to be used in or over the marine environment is to be free from leaks or coating of hydrocarbon-based fluids and/or lubricants harmful to the environment. Hoses and tanks are to be inspected on a regular basis to prevent fractures and breaks.
- On site, crews must have emergency spill clean-up equipment adequate for the activity involved, and it must be on site. Spill equipment will include, as a minimum, at least one 250 L (i.e., 55 gallon) overpack spill kit containing items to prevent a spill from spreading; absorbent booms, pillows, and mats; rubber gloves; and plastic disposal bags. All spills or leaks must be contained, cleaned up, and reported to the 24-Hour Environmental Emergencies Report System (1-800-565-1633).
- Ensure that waste is not left at the work site. All construction waste material will be disposed of in a provincially approved manner.
- Workers in contact with hazardous materials must be provided with and use appropriate personal protective equipment.
- Proper safety procedures must be followed throughout the duration of the project as per applicable municipal, provincial, and federal regulations.
- Dispose of and stabilize all excavated material above the ordinary high water mark or top of bank of nearby waterbodies and ensure sediment re-entry is prevented.
- Replace/restore any temporarily disturbed habitat features and remediate any areas impacted by the works, undertakings or activity.
- Sediment controls will be visually monitored throughout the life of the project, and repaired immediately if necessary.
- Any debris or waste material will be disposed of in a provincially approved manner.
- Dust control should be provided for construction activities and open soil areas, primarily by using fresh water.
- Work is to be carried out during hours agreed upon with the Departmental Representative to mitigate any disturbance to harbour users and residents.
The federal authorities are satisfied that that the carrying out of the project is not likely to cause significant adverse environmental effects.
Therefore, the federal authorities may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 3 | Notice of Determination | - | September 9, 2026 |
| 2 | End of Public Comment Period | - | June 22, 2026 |
| 1 | Notice of Intent to Make a Determination – Start of Public Comment Period | - | May 22, 2026 |
Contacts
Fisheries and Oceans CanadaPeter Fudge, Acting Regional Engineer
80 East White Hills Road
St. John's, Newfoundland and Labrador A1C 5X1
Telephone: 709-693-9385
Email: Peter.Fudge@dfo-mpo.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Fox Island River SCH is located in Fox Island River, Newfoundland (NL). Located in the St. George’s census division. (Newfoundland and Labrador)
-
Nature of activity
- Ports and Harbours
-
Assessment status
Completed -
Start date
2026-05-22 -
Proponent
Fisheries and Oceans Canada - Small Craft Harbours (DFO-SCH) -
Authorities
- Fisheries and Oceans Canada
- Transport Canada
-
Assessment type
Project on federal lands -
Reference number
90484
Nearby assessments
...within 200 kilometres-
Harbour Entrance Improvements, Fox Island River, NL
The DFO-SCH project site is located in Fox Island River, Newfoundland. -
Dredging, Fox Island River, NL
Fox Island River, Newfoundland -
Floating Dock Installation, Fox Island River, NL
Fox Island River, Newfoundland -
Fiona Storm Damage - Wharf and Breakwater Reconstruction - Blue Beach, NL
Blue Beach, Newfoundland -
Port au Port-Stephenville Wind Power and Hydrogen Generation Project
Ammonia and hydrogen production facility -
Slipway Construction, Lourdes, Newfoundland
Lourdes -
Port au Port-Stephenville Wind Power and Hydrogen Generation Project
Port au Port wind farm -
Wharf Reconstruction, Cape St. George, Newfoundland
Cape St. George -
Lark Harbour Search and Rescue Wharf Extension
Main Road, Lark Harbour -
Harbour Development, Lark Harbour, NL
Lark Harbour, Newfoundland -
Wharf Replacement, Frenchmans Cove, Newfoundland
Frenchmans Cove -
Harbour Cleanup, St. David's (Crabbes River), NL
St. David's (Crabbes River), NL -
Bay of Islands SAR Project, Corner Brook, Newfoundland
Corner Brook, Newfoundland -
Port au Port-Stephenville Wind Power and Hydrogen Generation Project
Codroy area wind farm -
Wharf Reconstruction, Trout River, Newfoundland
Trout River -
Emergency Dredging, Trout River, NL
Trout River, Newfoundland. -
Cape Ray Gold Project
Channel-Port aux Basques -
Trout River Gulch Public and Commercial Snowmobile Corridor
Gros Morne National Park -
Highway 431 and Tablelands Trail Access Road and Parking Lot Renovations
Gros Morne National Park of Canada -
Lomond River Fishway Replacement
Lomond River -
Highway 431 Barters Hill Renovations
Gros Morne National Park of Canada -
Storm Damage Repairs, Codroy, NL
Codroy, Newfoundland -
Floating Dock Construction and Installation at Codroy SCH, NL
The Codroy SCH is located in the community of Codroy, on the southwestern portion of Newfoundland. -
Harbour Development, Norris Point, Newfoundland
Norris Point (Neddys Harbour) -
Visitor Centre Recapitalization in Gros Morne National Park
Gros Morne National Park -
7Corners Installation Rocky Barachois
Gros Morne National Park of Canada -
Conservation and Protection Detachment Construction in Rocky Harbour, NL
On a portion of land on West Link rd., adjacent to the RCMP detachment, in Rocky Harbour, Newfoundland and Labrador (NL) -
Transmission Main from Chlorine Building to West Link Road
Rocky Harbour -
Shoreline Protection, Rocky Harbour, NL
The DFO-SCH project site is located in Rocky Harbour, Newfoundland. -
Martin Point Landfill Remediation
Gros Morne National Park of Canada -
Newfoundland and Labrador Hydro Line Modifications in Gros Morne National Park
Gros Morne National Park of Canada -
Environment and Climate Change Canada climate station relocation, Gros Morne National Park
Gros Morne National Park -
Storm Damage Repairs, Harbour Le Cou, NL
Harbour le Cou, Newfoundland -
Storm Damage Repairs, Rose Blanche, NL
Rose Blanche, Newfoundland -
Floating Dock Relocation at Rose Blanche SCH, NL
The Rose Blanche SCH is located in the community of Rose Blanche-Harbour le Cou , Newfoundland. -
Green Point Access Road Widening
Gros Morne National Park of Canada -
Valentine Gold Project
Valentine Lake -
Storm Damage Repairs, Burnt Islands, NL
Burnt Islands, Newfoundland -
Deer Lake Very High Frequency Omni-directional Range (VOR) Replacement
Deer Lake -
Wharf Reconstruction and Launchway, Isle aux Morts, NL
Isle aux Morts, Newfoundland -
Wharf / Breakwater Reconstruction, Fox Roost, NL
Fox Roost, Newfoundland -
Maritime Link Transmission Project
Cape Ray Cove -
Storage Tank Installation - Canadian Food Inspection Agency's Inspection station - Port-aux-Basques, Newfoundland
Channel-Port aux Basques -
Storm Damage Repairs, Channel-Port aux Basques, NL
Channel-Port aux Basques, Newfoundland -
Storm Damage Repairs, Margaree, NL
The DFO-SCH project site is located in Margaree, Newfoundland. -
Summer guided activities by business license holders for Gros Morne National Park
Gros Morne National Park -
Long Range Campsite Redevelopment
Gros Morne National Park of Canada -
VHF tower construction, Burgeo, Newfoundland Labrador
Burgeo -
Western Brook Bridge Replacement
Gros Morne National Park -
Burgeo Search and Rescue Floating Dock Construction
Burgeo, Newfoundland and Labrador -
Burgeo Search and Rescue Floating Dock Construction
Burgeo, Newfoundland and Labrador -
Burgeo Wharf Reconstruction
The Canadian Coast Guard Lifeboat Station is located in the community of Burgeo, NL.The project site is accessible via Reach Road located off of Route 480. -
Corridor Resources Inc. Drilling of an Exploration Well on the Old Harry Prospect - EL 1153 (previously EL 1105)
Gulf of St-Lawrence -
Maritime Link Transmission Project
Cabot Strait -
Helicopter Pad Replacement, Northwest Head (Ramea), NL
The DFO-RPSS project site is located in Northwest Head (Ramea), Newfoundland. -
Storm Damage Repairs, Ramea, NL
Ramea, Newfoundland -
Reconstruction of the navigation aid and the heliport at Rochers-au-Cormoran island
Côte-Nord-du-Golfe-du-Saint-Laurent -
Wharf Reconstruction, Westport, NL
Westport, Newfoundland