Heiltsuk Phase 3 Water System Upgrades

The proposed project includes decommissioning of two water reservoirs and replace them with one high elevation reservoir. Upgrade high lift pumps to serve the new water storage tank. Build a dedicated water supply main rom the water treatment plant to the new water storage tank. Construct a water main maintenance road and upgrade the access road to the water treatment plant. The project scope also includes upgrading aging chlorination and safety equipment. The sizes of the two reservoirs that will be decommissioned are 450 m3 and 900 m3. The size of the new reservoir is 1460 m3. The proposed supply main is 750 m and distribution main upgrades total 230 m.


Latest update

September 27, 2021 - The assessment decision statement has been issued to the proponent.

Participate

Contacts

Indigenous Services Canada
Rahul Hampaul, Senior Engineer
600-1138 Melville Street
Vancouver, British Columbia V6E 4S3
Telephone: 604-363-5628
Email: rahul.hampaul@canada.ca


  • Location

    • Bella Bella (British Columbia)
  • Nature of Activity

    • Water Management
  • Assessment Status

    Completed
  • Start Date

    2021-08-18
  • Proponent

    Heiltsuk
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    82912