Registry Search Mobile

Registry Search

Wasamac Gold Mine Project

Monarch Gold Corporation is proposing the construction, operation, decommissioning and abandonment of an underground gold mine located in the Abitibi-Témiscamingue region, approximately 15 kilometres from downtown Rouyn-Noranda, Quebec. As proposed, the Wasamac Gold Mine Project would have a mine life of 11 years and an ore production capacity of 6053 tonnes per day. The project would include the operation of an underground mine, the construction of an ore processing plant and related infrastructure, and the development of underground infrastructures for ore and waste rock transportation as well as waste rock, tailings and overburden accumulation areas. The proponent is considering the possibility for transporting the ore by rail to process it at a plant in Ontario, as an alternative to the construction of a processing plant in Quebec.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

January 8, 2021 — The Impact Assessment Agency of Canada is inviting public comments until February 7, 2021, on the draft Tailored Impact Statement Guidelines and the draft Public Participation Plan for the preparation of the Final Impact Statement Guidelines. These documents specify what should be examined during the impact assessment.

Participate

Key documents

Key documents
Document Number Document Title File Date
42 Draft Indigenous Engagement and Participation Plan PDF (753 KB) January 8, 2021
41 Draft Permitting Plan PDF (605 KB) January 8, 2021
40 Draft Public Participation Plan PDF (551 KB) January 8, 2021
39 Draft Tailored Impact Statement Guidelines PDF (2.1 MB) January 7, 2021
38 Notice of Impact Assessment Decision with Reasons - November 26, 2020
37 Description détaillée d'un projet désigné (French Only) PDF (18.3 MB) November 16, 2020
36 Summary of the Detailed Project Description of a Designated Project PDF (7.4 MB) November 16, 2020
24 Notice of Time Limit Suspension with Reasons - September 15, 2020
20 Summary of Issues PDF (605 KB) September 4, 2020
3 Summary of an Initial Project Description of a Designated Project PDF (6.3 MB) July 27, 2020

List all records

Contacts

Wasamac Gold Mine Project
Impact Assessment Agency of Canada
901-1550, Estimauville Avenue
Québec, Quebec G1J 0C1
Telephone: 418-254-2435
Email: iaac.wasamac.aeic@canada.ca


Date modified: