Wasagamack First Nation Leachate Management Upgrades (Engineered Wetlands) - 2021
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The leachate collection system at the existing community landfill site is inoperable and has been overflowing into the environment. The intent of the project is to construct an engineered wetland incorporating phytoremediation with the use of native plants on previously disturbed lands (former borrow pit). Although the project in itself is a mitigation measure, reducing potential adverse effects from the leachate, specific mitigation measures and residual effects have been addressed. Aski will develop a detailed design of the engineered wetlands area in association with Native Plant Solutions (plant specialist consultant). Construction of the wetlands, approximately 1.5 hectares in area, will include earthwork (cut/fill procedures) along the base of the former borrow pit and drainage area, berm construction along the south limit, realignment of existing drainage with flow controls, enhancement of native species vegetation (cattails or Typha latifolia) for wetland establishment, followed by monitoring.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Wasagamack First Nation Leachate Management Upgrades (Engineered Wetlands) - 2021 | - | March 23, 2021 |
1 | Public Comment Period on Intent to Make a Determination | - | February 1, 2021 |
Contacts
Indigenous Services CanadaShelly Johnson, Environmental Specialist
365 Hargrave Street
Winnipeg, Manitoba R3B 3A3
Telephone: 204-984-0709
Email: shelly.johnson@canada.ca
-
Location
- Wasagamack First Nation (Manitoba)
-
Nature of Activity
- Water Management
- Waste Management
-
Assessment Status
Completed -
Start Date
2021-02-02 -
Proponent
Wasagamack First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
81340
Nearby assessments
...within 200 kilometres-
Theresa Point First Nation road re-construction
St Theresa Pt First Nation -
St Theresa Point Northern Store Contamination Remediation
St Theresa Point Former Bulk Fuel Plant -
STPFN Wastewater Treatment Plant Upgrade and Expansion Project
St. Theresa Point First Nation -
St. Theresa Point First Nation - Old Bulk Fuels Decommissioning
St. Theresa Point First Nation -
STPFN Wastewater Treatment Plant Upgrade and Expansion Project
St. Theresa Point First Nation -
Aboveground Fuel Storage Replacement in Island Lake, Manitoba
Island Lake -
God's Lake First Nation Lumber Compound Site Fencing
God's Lake First Nation -
Project 6 - All-Season Road Linking Manto Sipi Cree Nation, Bunibonibee Cree Nation and God's Lake First Nation
-
God's Lake First Nation Water Treatment Plant (WTP) Upgrades
God's Lake First Nation -
God's Lake Soil Remediation Project
God's Lake First Nation -
God's Lake Soil Remediation Project
God's Lake First Nation -
God's Lake First Nation Water Treatment Plant (WTP) Upgrades
God's Lake First Nation -
Aboveground Fuel Storage Replacement in God's Lake Narrows, Manitoba
God's Lake Narrows -
Project 6 — All-Season Road Linking Manto Sipi Cree Nation, Bunibonibee Cree Nation and God's Lake First Nation
-
Red Sucker Lake First Nation New Aerated Lagoon
Red Sucker Lake First Nation -
Red Sucker Lake First Nation New Landfill
Red Sucker Lake -
Red Sucker Lake New School and Servicing
Red Sucker Lake First Nation New School and Services -
Project 6 - All-Season Road Linking Manto Sipi Cree Nation, Bunibonibee Cree Nation and God's Lake First Nation
-
Bunibonibee Cree Nation - 48 Unit Subdivision
Bunibonibee Cree Nation -
Remediation of Former Band Tank Farm Site
Manto Sipi Cree Nation -
Project 6 — All-Season Road Linking Manto Sipi Cree Nation, Bunibonibee Cree Nation and God's Lake First Nation
East of Lake Winnipeg -
New Fibre Installation / Upgrade Multiple Towers
Muskrat Dam PoP -
Sandy Lake First Nation - Child and Family Services Building
Sandy Lake First Nation -
Sandy Lake Cultural Area
Sandy Lake -
Deer Lake First Nation Small Business Center Project
Deer Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Wapekeka (Angling Lake) PoP -
New Fibre Installation / Upgrade Multiple Towers
Big Trout Lake PoP -
Teacherages Project (Site Servicing)
Poplar River First Nation -
Poplar River First Nation School
Poplar River Manitoba School -
Project 4 — All-Season Road Connecting Berens River to Poplar River First Nation
-
Poplar River Bridge Replacement
Poplar River First Nation -
Keewaywin First Nation New Landfill Construction and Old Landfill Decommissioning Project
Kee-Way-Win First Nation -
Poplar River First Nation Lagoon Expansion
Poplar River First Nation -
Norway House Cree Nation Business Center
Norway House Cree Nation -
Poplar River First Nation - Community Wharf - 2022/2023
Poplar River First Nation -
Norway House Cree Nation Water Intake Replacement and Lagoon Cell Decommissioning
Norway House Cree Nation -
Poplar River - Harbour Improvements
Poplar River -
Poplar River Harbour Manitoba - Routine Maintenance Dredging of the Poplar River at Lake Winnipeg - Winter 2019
Poplar River Harbour -
Sachigo Lake First Nation - Lot Servicing for future houses
Sachigo Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Kingfisher Lake PoP -
Sachigo Lake First Nation Wastewater Treatment Project
Sachigo Lake First Nation -
Poplar River First Nation
Poplar River First Nation -
Cross Lake Youth Centre
Cross Lake Band of Indians -
Cross Lake Band of Indians - 14 Portable Classrooms
Cross Lake Band of Indians -
Cross Lake Band of Indians Wastewater Lagoon Upgrade
Cross Lake -
CLCOI Road B Sewer and Water
Cross Lake Band of Indians