Tilbury Phase 2 LNG Expansion Project

Comment Search Mobile

Comment Search

Skip to filters

38 results

Attachment Madhur (TFN) to McGovern (IAAC) -- Substituted BC EA -- September 4, 2020

  • Tilbury Phase 2 LNG Expansion Project
  • Author: Administrator on behalf of Tsawwassen First Nation
  • Reference number: 49
  • Submitted: 2020-09-04
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comment Period & Virtual Open Houses
  • Please see the attached submission.
  • Attachment included
  • Administration Office: 1926 Tsawwassen Drive, Tsawwassen, British Columbia V4M 4G2 Tel: (604) 943-2112 • Fax: (604) 943-9226 Website: tsawwassenfirstnation.com September 4, 2020 By email (david.mcgovern@canada.ca) Impact Assessment Agency of Canada 22nd Floor, Place Bell 160 Elgin Street Ottawa, ON K1A 0H3 Attention: David McGovern, President Dear Mr. McGovern: Re: Substituted Environmental Assessment for the Tilbury Phase 2 LNG Expansion Project My name is Tejas Madhur, Manager of Policy and Intergovernmental Affairs and Government Services for Tsawwassen First Nation (“TFN” or “Tsawwassen”). I am writing regarding Associate Deputy Minister Kevin Jardine’s request for a substituted BC Environmental Assessment (“EA”) process for the Tilbury Phase 2 LNG Expansion Project (the “Project”) proposed by Fortis BC (the “Proponent”). Part 1: Overview of TFN’s position TFN’s position is that it is acceptable for a substituted EA process to be used for the Project on the understanding that Canada will ensure the following: 1. The new provincial assessment process will apply to the Project and the standards of consultation and assessment of Project impacts will in no way be lower than current federal standards; 2. Canada will ensure that the methodology for assessing Project impacts to Treaty rights and culture in the assessment aligns with federal guidance and Tsawwassen- specific perspectives and values; 3. Canada will ensure that impacts to Treaty rights and TFN culture are not given a less rigorous assessment and that impacts to rights and culture are not viewed as subordinate to biophysical impacts; Administration Office: 1926 ...

Report

Attachment Tilbury LNG proposal Reference Number 80496

  • Tilbury Phase 2 LNG Expansion Project
  • Author: Misty MacDuffee
  • Reference number: 36
  • Submitted: 2020-07-16 - 9:57 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comment Period & Virtual Open Houses
  • July 16, 2020 Canadian Impact Assessment Registry Re: Tilbury LNG proposal Reference Number 80496 (http://iaac-aeic.gc.ca/050/evaluations/proj/80496?culture=en-CA) Dear Sir/Madam, I am writing on behalf of the Raincoast Conservation Foundation to highlight the significant concerns that surround the proposed expansion of the Tilbury LNG facility. Two of these concerns include further habitat alterations in the Lower Fraser River and estuary, and the implications from increased shipping on Southern Resident killer whales.  As Raincoast has said for some time, these large industrial expansions must stop being assessed as ...
  • Attachment included
  • July 16, 2020 Canadian Impact Assessment Registry Re: Tilbury LNG proposal Reference Number 80496 Dear Sir/Madam, I am writing on behalf of the Raincoast Conservation Foundation to highlight the significant concerns that surround the proposed expansion of the Tilbury LNG facility. Two of these concerns include further habitat alterations in the Lower Fraser River and estuary, and the implications from increased shipping on Southern Resident killer whales. As Raincoast has said for some time, these large industrial expansions must stop being assessed as “one-offs” and become subject to federal and provincial cumulative effects assessments that consider their consistency with broader sustainability goals and the ecological limits these proposals ignore. It is contradictory for the federal government to invest millions of dollars to recover Fraser River habitat for threatened and endangered salmonids while on the other hand continue to approve projects that erode and destroy the very same habitat. At this stage, both the NEB panel assessing Trans Mountain and the CEAA panel assessing Roberts Bank Terminal Two, have identified that increased shipping through the critical habitat of Southern Resident killer whales will have significant and cumulative adverse effects on the recovery of these whales. Population viability analysis examines the likelihood of extinction for endangered wildlife. Five years ago, the chance that the 80 Southern Resident killer whales alive in 2015 would be functionally extinct in 100 years was 9%. Since 2015, the risk of extinction has increased. In 2020, the chance the 72 whales alive now will be functionally extinct within a century is 59%. The abundance ...

Report

Attachment Delta Chamber of Commerce - Letter of Support for FortisBC's Tilbury LNG Phase 2 Project Application

  • Tilbury Phase 2 LNG Expansion Project
  • Author: Delta Chamber of Commerce
  • Reference number: 35
  • Submitted: 2020-07-16 - 5:47 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comment Period & Virtual Open Houses
  • Please find attached a letter of support for the FortisBC Tilbury LNG Phase 2 project application from the Delta Chamber of Commerce. 
  • Attachment included
  • deltachamber.ca The Delta Chamber of Commerce, 6201 60 Avenue, Delta, BC July 16th, 2020 Shannon Potter Impact Assessment Agency of Canada 778-657-8547 | Email: Shannon.Potter@canada.ca Re: Letter of Support for the FortisBC Tilbury LNG Phase 2 Expansion Project Dear Shannon, Thank you for the opportunity to provide input in the Early Engagement phase of the Environmental Assessment process. The Delta Chamber of Commerce, which represents member businesses across the service, retail, industrial, fishing and farming sectors, acknowledges the vital roles that our community has in nurturing Canada’s trade capability and competitiveness. As home to Canada’s largest container terminal, we understand the importance of meeting current customer needs for cost-effective, low carbon alternative fuels for transportation. We also appreciate the importance of Canada’s role in the global economy, in leading the transition away from high carbon-emission fuels to meet new global shipping emissions regulations. FortisBC’s Tilbury Liquid Natural Gas (LNG) plant has been safely operating in the Tilbury Industrial Park of Delta since it was first constructed in 1971 and has been producing LNG for marine customers such as BC Ferries and Seaspan Ferries and storing LNG to meet the energy needs of FortisBC customers here in BC for over a decade. We know from FortisBC’s history of engaging with our community, and from their work in Phase 1, that this project provided direct economic and employment benefits for the people of Delta and neighbouring communities. Since the beginning of construction and through Phase 1, FortisBC has demonstrated a notable commitment to the engagement of local ...

Report

Attachment KAIROS Canada and its network do not support the Tilbury LNG expansion project

  • Tilbury Phase 2 LNG Expansion Project
  • Author: Beth Lorimer
  • Reference number: 30
  • Submitted: 2020-07-15 - 4:21 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comment Period & Virtual Open Houses
  • Please see attached.
  • Attachment included
  • Impact Assessment Agency of Canada Suite 210A- 757 West Hastings Street Vancouver, BC, V6C 3M2 July 15, 2020 Re: Tilbury Phase 2 LNG Expansion Project invitation for public comment, Ref # 80496 Dear Sir or Madam, We are writing to express our serious concern with the Tilbury Phase 2 LNG Expansion Project, proposed by FortisBC. We represent a network of Indigenous, settlers and newcomers in Canada working with people of faith or conscience all over the world for ecological justice and human rights. This project increases risks from fracking, undermines Canada’s progress on reducing greenhouse gas emissions, threatens the health and safety of communities, and undermines the rights of local First Nations. First, KAIROS is deeply concerned about the upstream impacts of this project associated with fracking. It is estimated that 2,800 new fracking wells are needed for this project. Fracking raises significant social and ecological justice concerns related to the rights of Indigenous peoples, public health, air and water contamination, groundwater depletion, and the triggering of seismic activity. These new wells will use an intense amount of freshwater. The water that is contaminated in the process will end up underground or in tailings ponds and removed from the local water cycle, threatening local drinking water, habitats, and fishing grounds. Fracking also increases the risk of methane leakage. A recent study of BC’s active and abandoned gas wells revealed that “almost 11 percent of all oil and gas wells had a reported leak, together releasing 14,000 cubic metres of methane per day.i Methane is a greenhouse gas that is roughly 30 times more potent than carbon dioxide ...

Report

Attachment Notice of time limit resumption and notification of the opportunity to comment on the proposed Tilbury Phase 2 LNG Expansion Project (Agency Project Number 005724, Registry Reference Number 80496)

  • Tilbury Phase 2 LNG Expansion Project
  • Author: Administrator on behalf of Katzie First Nation
  • Reference number: 25
  • Submitted: 2020-07-02
  • Participation notice: Public Notice - Public Comment Period & Virtual Open Houses
  • Please see attached.
  • Attachment included
  • P: (604)465-8961 | F: (604)465-5949 19700 Salish Road, Pitt Meadows, BC, V3Y2G1 KATZIE First Nation …Land of the Moss June 24, 2020 Shannon Potter Impact Assessment Agency of Canada 604-657-8547| Email: Shannon.potter@canada.ca Re: Opportunity to comment on the potential impact assessment of the proposed Tilbury Phase 2 LNG Expansion Project Dear Shannon, Thank you for the opportunity to participate in the initial steps of the planning phase under the Impact Assessment Act for the proposed Tilbury Phase 2 LNG Expansion Project (the Project) proposed by FortisBC Holdings Inc. (the proponent). The proposed Project lies in Katzie First Nation’s traditional territory. Katzie First Nation (Katzie) has never surrendered, ceded or sold any of our Aboriginal title or rights to the Crown. As such, Katzie is concerned with any activity that may affect our rights, title and interests in our territory. We understand that the intent of the this initial engagement is to provide Katzie with an opportunity to identify key interests and concerns or issues we may have regarding the proposed Project at this stage of the planning process, and that our inputs will inform the Summary of Issues and the development of the Detailed Project Description. We have reviewed the Initial Project Description to: get a better understanding of the proposed Project and associated activities; inform our own preliminary research to support our response; and develop a preliminary list of interests and potential concerns and issues regarding the proposed Project. The review was completed through the lens of Katzie values and interests and focused on the potential for ...
  • Attachment included
  • P: (604)465-8961 | F: (604)465-5949 19700 Salish Road, Pitt Meadows, BC, V3Y2G1 KATZIE First Nation …Land of the Moss June 24, 2020 Tanner May-Poole Project Assessment Officer Environmental Assessment Office Government of British Columbia 778-698-9185| Email: Tanner.MayPoole@gov.bc.ca Re: Early engagement on the proposed Tilbury Phase 2 LNG Expansion Project Dear Tanner, Thank you for the opportunity to participate in the Early Engagement Phase under the Environmental Assessment Act for the proposed Tilbury Phase 2 LNG Expansion Project (the Project) proposed by FortisBC Holdings Inc. (the proponent). The proposed Project lies in Katzie First Nation’s traditional territory. Katzie First Nation (Katzie) has never surrendered, ceded or sold any of our Aboriginal title or rights to the Crown. As such, Katzie is concerned with any activity that may affect our rights, title and interests in our territory. We understand that the intent of the Early Engagement Phase of the environmental assessment (EA) process is to provide Katzie with an opportunity to better understand the proposed Project, to identify key interests and concerns or issues we may have regarding the proposed Project at this stage of the planning process, and to determine if we would like to be a Participating Indigenous Nation. Using initial capacity funding provided by the Impact Assessment Agency of Canada, we have reviewed the Initial Project Description to: get a better understanding of the proposed Project and associated activities; inform our own preliminary research to support our response; and develop a preliminary list of interests and potential concerns and ...

Report

Attachment Indigenous Services Canada Federal Authority Advice Record - Tilbury Phase 2 LNG Expansion Project

  • Tilbury Phase 2 LNG Expansion Project
  • Author: Administrator on behalf of Indigenous Services Canada
  • Reference number: 23
  • Submitted: 2020-06-29
  • Participation notice: Public Notice - Public Comment Period & Virtual Open Houses
  • Please see attached.
  • Attachment included
  • ATTACHMENT: [June 01, 2020] Federal Authority Advice Record Response due by [June 20, 2020]. Please submit the form to: IAAC.TilburyLNG-GNLTilbury.AEIC@canada.ca Tilbury Phase 2 LNG Expansion Project – FortisBC Holdings Inc. Agency File: 005724 Department/Agency Indigenous Services Canada Lead IA Contact Aaron O’Keefe Full Address 600 – 1138 Melville Street, Vancouver, BC V6E 4S3 Email Aaron.okeefe@canada.ca Telephone 604-404-2045 Alternate Departmental Contact Lee-Ann Hamilton, Senior Environmental Specialist, BC Region, 604-348-7589 1. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function. It is not probable that Indigenous Services Canada will exercise a power or perform a duty or function under any Act of Parliament in relation to the Project. 2. Is your department or agency in possession of specialist or expert information or knowledge that may be relevant to the conduct of an impact assessment of the Project? Specify as appropriate. As no First Nation reserves are located in the project area, Indigenous Services Canada is not likely in possession of specialist or expert information or knowledge that may be relevant to any potential adverse effects within federal jurisdiction caused by the Project. 3. Has your department or agency considered the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action that would allow the Project to proceed in whole or in part? Specify ...

Report

Attachment The Tilbury LNG Expansion is good for the community and good for BC

  • Tilbury Phase 2 LNG Expansion Project
  • Author: Frederick Scott
  • Reference number: 15
  • Submitted: 2020-06-25 - 8:47 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Public Comment Period & Virtual Open Houses
  • Dear Sir/Madames: I am writing to support the Tilbury LNG expansion project for the following reasons: 1. the project will produce clean-burning LNG that will replace Bunker C and MGO as ship fuels, thereby greatly reducing NOx, SOx and particulate emissions in my community and across BC 2. the project will be fully electrified (E-LNG), so it will be the cleanest LNG facility on the planet 3. The project supports the BC natural gas industry, which from a GHG emission perspective is 5 to 8 times cleaner than the US industry on a life-cycle carbon analysis 4. The project will create hundreds of jobs during construction.  During operation, it will create ~100 direct jobs and 300 indirect opportunities for people in the lower mainland. 5. LNG jobs tend to be high-paying, full time family wage positions, which we so desperately need as we rebuild our economy post Covid-19 6. the project will create spin off opportunities for businesses across BC 7. the project will support fuel switching from coal to LNG, which represents a 50% decrease in GHG emissions. I see absolutely no negative effects from advancing this project, please do it expediently and efficiently. Thank you for reviewing my comments. Yours truly, Fred Scott P.Eng. 

Report

Attachment Public Safety Canada Federal Authority Advice Record - Tilbury Phase 2 LNG Expansion Project

  • Tilbury Phase 2 LNG Expansion Project
  • Author: Administrator on behalf of Public Safety Canada
  • Reference number: 20
  • Submitted: 2020-06-03
  • Participation notice: Public Notice - Public Comment Period & Virtual Open Houses
  • Hello, The  interpretation of the Public Safety Canada, Pacific Regional Office is that we do not have a direct role in the subject areas and assessment for the Tilbury Phase 2 Expansion. The assessment is expected to to be focused at the regulatory and legislative levels, and presumably any emergency preparedness or mitigative activities during project development would be prescribed by regulations to be commented on by the specific regulatory provincial and federal departments. A role that Public Safety could have, should there be a major emergency related to the site or project in the future, would be to facilitate federal and federal/provincial coordination during emergency response. Note that this would be for a major incident exceeding the routine response mechanisms for involved departments. I have attached the link to the Federal Emergency Response Plan (FERP) which describes this role. https://www.publicsafety.gc.ca/cnt/rsrcs/pblctns/mrgnc-rspns-pln/index-en.aspx While we do have an interest in disaster risk reduction, which can include any measures to reduce the likelihood of an emergency and environmental or community impacts, again I suspect this is out of scope as it comes from a broader policy lens, and likely specific requirements to prevent or mitigate incidents related to this project will be prescribed by sector-specific regulations. Please advise if you require anything further at this time. Thank you, Andrew J. Hannan Regional Director Public Safety Canada, Pacific Region
  • Attachment included
  • ATTACHMENT: [June 01, 2020] Federal Authority Advice Record Response due by [June 20, 2020]. Please submit the form to: IAAC.TilburyLNG-GNLTilbury.AEIC@canada.ca Tilbury Phase 2 LNG Expansion Project – FortisBC Holdings Inc. Agency File: 005724 Department/Agency Public Safety Canada, Pacific Regional Office Lead IA Contact Andrew Hannan Full Address Suite 607 – 3292 Production Way, Burnaby, BC, V5A 4R4 Email Telephone 604-353-4733 Alternate Departmental Contact Sue Olsen, 604-418-6236 1. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function. No. 2. Is your department or agency in possession of specialist or expert information or knowledge that may be relevant to the conduct of an impact assessment of the Project? Specify as appropriate. Our department has specialist knowledge in emergency management, but we do not expect that it would be applicable to this project. 3. Has your department or agency considered the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action that would allow the Project to proceed in whole or in part? Specify as appropriate. No. 4. Has your department or agency had previous contact or involvement with the proponent or other party in relation to the Project? (for example, enquiry about methodology, guidance, or data; introduction to the project) Provide an overview of the information or advice exchanged. <email address removed> <email ...

Report

Attachment Fisheries and Oceans Canada Federal Authority Advice Record - Tilbury Phase 2 LNG Expansion Project

  • Tilbury Phase 2 LNG Expansion Project
  • Author: Administrator on behalf of Fisheries and Oceans Canada
  • Reference number: 24
  • Submitted: 2020-06-01
  • Participation notice: Public Notice - Public Comment Period & Virtual Open Houses
  • Please see attached.
  • Attachment included
  • ATTACHMENT: [June 01, 2020] Federal Authority Advice Record Response due by [June 20, 2020]. Please submit the form to: IAAC.TilburyLNG-GNLTilbury.AEIC@canada.ca Tilbury Phase 2 LNG Expansion Project – FortisBC Holdings Inc. Agency File: 005724 Department/Agency Department of Fisheries and Oceans Canada (DFO) Lead IA Contact Suzanne Earle Full Address 200 – 401 Burrard Street, Vancouver, BC V6C 3S4 Email Suzanne.Earle@dfo-mpo.gc.ca Telephone Alternate Departmental Contact Michael Engelsjord Michael.Engelsjord@dfo-mpo.gc.ca James Dwyer James.Dwyer@dfo-mpo.gc.ca 1. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function. Unknown. If any project works near water cannot avoid death of fish or harmful alteration, disruption or destruction of fish habitat then these would require authorization under subsect ions 34.2(2)(b) or 35(2)(b) the Fisheries Act. It is possible that upgrades (e.g. infilling, pile installation, dredging or riparian vegetation removal) to an existing construction jetty may result in adverse impacts to fish and/or fish habitat and require authorization, however the project description does not contain adequate information to determine if authorization would be required. Also, it is not clear whether these upgrades would be completed as part of the Tilbury Phase 2 LNG Expansion Project or the WesPac Marine Jetty Project. 2. Is your department or agency in possession of specialist or expert information or knowledge that may be relevant to the conduct of an ...

Report

Attachment Environment and Climate Change Canada Federal Authority Advice Record - Tilbury Phase 2 LNG Expansion Project

  • Tilbury Phase 2 LNG Expansion Project
  • Author: Administrator on behalf of Environment and Climate Change Canada (ECCC)
  • Reference number: 16
  • Submitted: 2020-05-22
  • Participation notice: Public Notice - Public Comment Period & Virtual Open Houses
  • Please see attached.
  • Attachment included
  • ATTACHMENT: May 22, 2020 Federal Authority Advice Record Response due by May 22, 2020 Please submit the form to: IAAC.TilburyLNG-GNLTilbury.AEIC@canada.ca Tilbury Phase 2 LNG Expansion Project – FortisBC Holdings Inc Agency File: 80496 Department/Agency Environment and Climate Change Canada (ECCC) Lead IA Contact Jason Cagampan, Senior Environmental Assessment Project Manager Full Address 201-401 Burrard Street Vancouver, BC V6C 3S4 Email jason.cagampan@canada.ca Telephone 604.666.8329 Alternate Departmental Contact Kathryn Marshall, Environmental Assessment Project Manager kathryn.marshall@canada.ca 604.666.7715 1. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function . Based on the Initial Project Description, ECCC does not expect that it will be required to exercise a power, or perform a duty or function related to the Project , to enable it to proceed. Once the scope of the Project and of the assessment are established by the Agency, this may change as additional activities or project components could come into scope. 2. Is your department or agency in possession of specialist or expert information or knowledge that may be relevant to the conduct of an impact assessment of the Project? ECCC has specialist or expert information that may be relevant to the impact assessment in the areas listed below, notably with regard to establishing an adequate baseline, assessing potential effects to biophysical valued components, effectiveness of mitigation measures, methods for ...

Report

Attachment Natural Resources Canada Federal Authority Advice Record - Tilbury Phase 2 LNG Expansion Project

  • Tilbury Phase 2 LNG Expansion Project
  • Author: Administrator on behalf of Natural Resources Canada
  • Reference number: 17
  • Submitted: 2020-05-22
  • Participation notice: Public Notice - Public Comment Period & Virtual Open Houses
  • Please see attached
  • Attachment included
  • May 22, 2020 CIAR File No.: 80496 Natasha Anderson Project Manager, Pacific and Yukon Region Impact Assessment Agency of Canada natasha.anderson@canada.ca Subject: Natural Resources Canada’s Submission of the FAAR Request for the Tilbury Phase 2 LNG Expansion Project On April 28th, the Impact Assessment Agency of Canada (the Agency) requested that Natural Resources Canada (NRCan) review FortisBC Holdings Inc.’s (the Proponent) Initial Project Description for the proposed Tilbury Phase 2 LNG Expansion Project (the Project) in Delta, British Columbia. NRCan has reviewed the Proponent’s Initial Project Description based on the Department’s requirements pursuant to Subsection 13(1) of the Impact Assessment Act. Please find attached below NRCan’s submission for this stage of the review process. If you have any questions, please contact me via e-mail at anica.madzarevic@canada.ca. Thank you, <original signed by> Anica Madzarevic Impact Assessment Officer Office of the Chief Scientist ATTACHMENT: April 28, 2020 Federal Authority Advice Record Response due by May 15, 2020 Please submit the form to: IAAC.TilburyLNG-GNLTilbury.AEIC@canada.ca Tilbury Phase 2 LNG Expansion Project – FortisBC Holdings Inc. Agency File: 005724 Department/Agency Natural Resources Canada Lead IA Contact Anica Madzarevic Full Address 588 Booth Street, Ottawa, ON, K1A 0E4 Email anica.madzarevic@canada.ca Telephone (343) 292-7655 Alternate Departmental Contact Walker Smith (walker.smith@canada.ca) 1. Is it probable that ...

Report

Attachment Women and Gender Equality Canada Federal Authority Advice Record - Tilbury Phase 2 LNG Expansion Project

  • Tilbury Phase 2 LNG Expansion Project
  • Author: Administrator on behalf of Women and Gender Equality Canada
  • Reference number: 22
  • Submitted: 2020-05-22
  • Participation notice: Public Notice - Public Comment Period & Virtual Open Houses
  • Please see attahced.
  • Attachment included
  • Federal Authority Advice Record Response due by May 22, 2020 Please submit the form to: IAAC.TilburyLNG-GNLTilbury.AEIC@canada.ca Tilbury Phase 2 LNG Expansion Project – FortisBC Holdings Inc. Agency File: 005724 Department/Agency Women and Gender Equality Canada (WAGE) Lead IA Contact Denise Gareau, Director, Policy and External Relations Full Address 22 Eddy St., Gatineau, QC. Email CFC.EvaluationImpacts-ImpactsAssessment.SWC@cfc-swc.gc.ca Telephone 819-938-1132 Alternate Departmental Contact Debbie Gray, Senior Policy Advisor 1. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function. WAGE does not hold any regulatory power, function or duties 2. Is your department or agency in possession of specialist or expert information or knowledge that may be relevant to the conduct of an impact assessment of the Project? Specify as appropriate. WAGE holds expertise in the application of GBA+ and intersectional analysis as well and information related to gender-based violence. 3. Has your department or agency considered the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action that would allow the Project to proceed in whole or in part? Specify as appropriate. No 4. Has your department or agency had previous contact or involvement with the proponent or other party in relation to the Project? (for example, enquiry about methodology, guidance, or data; introduction to the project) Provide an overview of the ...

Report

Attachment Transport Canada Federal Authority Advice Record - Tilbury Phase 2 LNG Expansion Project

  • Tilbury Phase 2 LNG Expansion Project
  • Author: Administrator on behalf of Transport Canada
  • Reference number: 12
  • Submitted: 2020-05-21
  • Participation notice: Public Notice - Public Comment Period & Virtual Open Houses
  • Please see attached.
  • Attachment included
  • Federal Authority Advice Record Response due by May 22, 2020 Please submit the form to: IAAC.TilburyLNG-GNLTilbury.AEIC@canada.ca Tilbury Phase 2 LNG Expansion Project – FortisBC Holdings Inc. Agency File: 005724 Department/Agency Transport Canada Lead IA Contact Kim Keskinen Full Address Pacific Region Environmental Services 1102-1166 West Pender Street Vancouver, BC V6E 2R9 Email Telephone 604-368-6178 Alternate Departmental Contact 1. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function. Transport Canada may have the following interests with respect to the project, including the exercise of powers, duties, or functions that would enable the project to proceed: Canadian Navigable Waters Act Transport Canada understands that to facilitate construction of the Tilbury Phase 2 LNG Expansion Project, Fortis BC may upgrade a temporary construction jetty in the Fraser River.  Depending on the scope, temporary works may require an approval under section 5(1) of the Canadian Navigable Waters Act for the construction, placement, alteration, rebuilding, removal or decommissioning of a work in a navigable water that may interfere with navigation. 2. Is your department or agency in possession of specialist or expert information or knowledge that may be relevant to the conduct of an impact assessment of the Project? Specify as appropriate. Transport Canada would provide advice as necessary related to navigation and waterway use. <email address removed> <email ...

Report

Attachment Health Canada Federal Authority Advice Record - Tilbury Phase 2 LNG Expansion Project

  • Tilbury Phase 2 LNG Expansion Project
  • Author: Administrator on behalf of Health Canada
  • Reference number: 18
  • Submitted: 2020-04-07
  • Participation notice: Public Notice - Public Comment Period & Virtual Open Houses
  • Please see attached.
  • Attachment included
  • ATTACHMENT: April 7, 2020 Federal Authority Advice Record Response due by April 14, 2020. Please submit the form to: IAAC.TilburyLNG-GNLTilbury.AEIC@canada.ca Tilbury Phase 2 LNG Expansion Project – FortisBC Holdings Inc. Agency File: 005724 Department/Agency Health Canada Lead IA Contact Herbert Antill Full Address Sinclair Centre – Federal Tower #218 – 757 W. Hastings Street Vancouver, BC, V6C 1A1 Email herbert.antill@canada.ca Telephone 604-666-2808 Alternate Departmental Contact Yota Hatziantoniou; Paula Smith 1. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function. Not applicable 2. Is your department or agency in possession of specialist or expert information or knowledge that may be relevant to the conduct of an impact assessment of the Project? Specify as appropriate. As a federal authority, Health Canada will provide specialist or expert information and knowledge in the Department’s possession (expertise) to support the assessment of impacts on human health from projects considered individually and cumulatively under the Impact Assessment Act, 2019 (IAA, 2019). The Department provides expertise in the areas described below; it does not play a regulatory role. How the expertise provided by Health Canada will be used in the impact assessment process will ultimately be determined by the reviewing body(ies). It should also be noted that expertise related to assessing human health that are relevant to impact assessments (IAs) may be held by other federal, ...