Project Canadian Nuclear Laboratories Material Pit Expansion Project

  • Location (Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81209
  • Last Modified: 2021-02-16
  • Relevance: 226961.72
  • In support of ongoing operations at the Canadian Nuclear Laboratories (CNL), the Chalk River Laboratories (CRL) site maintains a spoils and material processing pit that houses fill and material extracted from within the site.

Project Canadian Nuclear Laboratories Multi-Purpose Waste Handling Facility

  • Location (Chalk River Laboratories, Chalk River On, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 81443
  • Last Modified: 2021-04-15
  • Relevance: 216254.98
  • In support of ongoing operations at Canadian Nuclear Laboratories (CNL), the construction of two new multi-purpose waste handling facilities are proposed at Atomic Energy of Canada Limited's Chalk River Laboratories site to process and store Low Level Waste (LLW) and Intermediate Level Waste (ILW).

Project Canadian Nuclear Laboratories Access Road Upgrade

  • Location (Canadian Nuclear Laboratories, Chalk River, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81243
  • Last Modified: 2021-02-02
  • Relevance: 200549.68
  • In support of ongoing operations at the Canadian Nuclear Laboratories (CNL), the upgrade of an existing road is proposed at the Atomic Energy of Canada (AECL), Chalk River Laboratories (CRL) site.To help inform a determination under section 82 of the Impact Assessment Act 2019 (IAA 2019) in relation to the Access Road Upgrade at the Chalk River Laboratories, Canadian Nuclear Laboratories (CNL) is inviting comments from the public.  Canadian Nuclear Laboratories (CNL) is responsible for the management and operations of AECL's sites, including the Chalk River Laboratories site, under a Government-owned, Contractor-operated arrangement.

Project Canadian Nuclear Laboratories Waste Management Area Modification Project

  • Location (Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81389
  • Last Modified: 2021-03-24
  • Relevance: 180553.32
  • In support of ongoing operations at Canadian Nuclear Laboratories (CNL), the modification of a Waste Management Area is being proposed at the Atomic Energy of Canada Limited's Chalk River Laboratories site.

Project Canadian Nuclear Laboratories Intermediate Level Waste Storage Area

  • Location (Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81177
  • Last Modified: 2021-02-16
  • Relevance: 175433.9
  • In support of ongoing operations at the Canadian Nuclear Laboratories (CNL), the construction of an Intermediate Level Waste (ILW) Storage Facility is proposed at the Atomic Energy of Canada (AECL), Chalk River Laboratories (CRL) site.

Project Canadian Nuclear Laboratories Nuclear Power Demonstration Waste Facility: Modification to Crawl Space

  • Location (Canadian Nuclear Laboratories, Nuclear Power Demonstration Waste Facility, Rolphton, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81427
  • Last Modified: 2021-04-08
  • Relevance: 169238.81
  • The Nuclear Power Demonstration Waste Facility (NPDWF), owned by Atomic Energy of Canada Limited (AECL) and managed by Canadian Nuclear Laboratories (CNL), is currently being maintained in a safe shut down state, in preparation for eventual decommissioning.

Project Canadian Nuclear Laboratories Covered Structure

  • Location (Canadian Nuclear Laboratories, Chalk River, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80263
  • Last Modified: 2021-01-12
  • Relevance: 161379.26
  • Covered Structure  The proposed project is to construct a covered structure at the Chalk River Laboratories.The Chalk River Laboratories (CRL) site is owned by Atomic Energy of Canada Limited (AECL), a Federal Authority under the Impact Assessment Act 2019 (IAA 2019).  Canadian Nuclear Laboratories Ltd is responsible for the management and operations of AECL's sites, including the CRL site, pursuant to a long-term contractual arrangement.

Project Canadian Nuclear Laboratories Cask Facility Project

  • Location (Canadian Nuclear Laboratories, Chalk River, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 81139
  • Last Modified: 2021-01-05
  • Relevance: 149042.91
  • In support of ongoing operations at Canadian Nuclear Laboratories (CNL), the construction of a Cask Facility is proposed at the Atomic Energy of Canada (AECL), Chalk River Laboratories (CRL) site.  The Chalk River Laboratories (CRL) site is owned by Atomic Energy of Canada Limited (AECL), a Federal Authority under the Impact Assessment Act 2019 (IAA 2019).  Canadian Nuclear Laboratories Ltd is responsible for the management and operations of AECL's sites, including the CRL site, pursuant to a long-term contractual arrangement.

Project Canadian Nuclear Laboratories Upgraded Electrical Services

  • Location (Chalk River Nuclear Laboratories Ltd., Chalk River, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80771
  • Last Modified: 2021-01-12
  • Relevance: 145064.88
  • Upgraded Electrical Services In order to support the ongoing Waste Management Operations at Canadian Nuclear Laboratories (CNL), Chalk River site, an upgrade to the existing electrical system that supports the Waste Management Area is necessary.This work will provide the power necessary to support the ongoing Waste Management Operations at Canadian Nuclear Laboratories (CNL), Chalk River site.

Project Canadian Nuclear Laboratories Contractor Management Trailer Complex

  • Location (Canadian Nuclear Laboratories, Chalk River, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80529
  • Last Modified: 2021-01-12
  • Relevance: 136291.94
  • Contractor Management Trailer Complex The proposed Project involves the site preparation and installation of a modular office trailer complex to support the newly formed Site Integration Office at Canadian Nuclear Laboratories (CNL), Chalk River site.  The Chalk River Laboratories (CRL) site is owned by Atomic Energy of Canada Limited (AECL), a Federal Authority under the Impact Assessment Act 2019 (IAA 2019).  Canadian Nuclear Laboratories Ltd is responsible for the management and operations of AECL's sites, including the CRL site, pursuant to a long-term contractual arrangement.

Project Canadian Nuclear Laboratories, Nuclear Power Demonstration Waste Facility Modification to Building Crawl Space

  • Location (Canadian Nuclear Laboratories, Nuclear Power Demonstration Waste Facility, Rolphton, Ontario, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Terminated
  • Reference Number: 81000
  • Last Modified: 2020-10-27
  • Relevance: 134493.19
  • The Nuclear Power Demonstration Waste Facility (NPDWF), owned by Atomic Energy of Canada Limited (AECL) and managed by the Canadian Nuclear Laboratories (CNL), is currently being maintained in a safe shut down state, in preparation for eventual decommissioning.

Project Near Surface Disposal Facility Project

  • Location (Deep River, Ontario)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80122
  • Last Modified: 2021-04-12
  • Relevance: 107978.28
  • The Near Surface Disposal Facility (NSDF) is a proposed engineered disposal facility for low-level radioactive waste planned for the Chalk River Laboratories site (CRL).The engineered mound would be cellular, made up of multiple disposal cells consisting of: base liner and final cover systems leachate collection and leak detection systems environmental monitoring systems The proposed project would also include: a wastewater treatment plant supporting infrastructure, such as a truck wheel wash, vehicle monitoring and weighing stations, work stations and change facilities, security systems to monitor access and egress, construction trailers, and marine containers or tents for storage of construction materials Under the Nuclear Safety and Control Act, CNL's proposal requires approval by the Canadian Nuclear Safety Commission (CNSC) and involves an amendment to the Chalk River Laboratories (CRL) Nuclear Research and Test Establishment Operating Licence.An environmental assessment (EA) conducted under the Canadian Environmental Assessment Act, 2012 is required, and an EA decision affirming that the proposed activities will not cause significant adverse environmental effects, before the CNSC can make a licensing decision on this proposal.

Project Nuclear Power Demonstration Closure Project

  • Location (Rolphton, Ontario)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80121
  • Last Modified: 2021-01-18
  • Relevance: 91030.87
  • Canadian Nuclear Laboratories (CNL) is proposing to decommission the Nuclear Power Demonstration Waste Facility, a former nuclear generating station that operated until 1987.Under the Nuclear Safety and Control Act, CNL's proposal requires an amendment to its existing Decommissioning Waste Facility Licence issued by the Canadian Nuclear Safety Commission (CNSC).An environmental assessment (EA) conducted under the Canadian Environmental Assessment Act, 2012 is required, and an EA decision affirming that the proposed activities will not cause significant adverse environmental effects, before the CNSC can make a licensing decision on this proposal.

Project Micro Modular Reactor Project at Chalk River

  • Location (Chalk River, Ontario)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80182
  • Last Modified: 2021-03-25
  • Relevance: 90494.05
  • The proposed project is located at the Chalk River Laboratories site, in Renfrew County, Ontario, approximately 200 km northwest of Ottawa.The proposed project includes a nuclear plant, which would contain a MMR High Temperature Gas-cooled Reactor that would provide process heat to an adjacent plant, via molten salt.Under the Nuclear Safety and Control Act, Global First Power's proposal requires approval and licensing by the Canadian Nuclear Safety Commission (CNSC).

Project In Situ Decommissioning of the Whiteshell Reactor #1

  • Location (Pinawa, Manitoba)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80124
  • Last Modified: 2020-07-24
  • Relevance: 73930.16
  • Canadian Nuclear Laboratories (CNL) is proposing to decommission the Whiteshell Reactor #1 (WR-1 Reactor), a former nuclear research reactor that operated until 1985.The WR-1 Reactor is located at the Whiteshell Laboratories (WL) site in Pinawa, Manitoba, which is situated approximately 100 kilometres northeast of the city of Winnipeg and located near the towns of Lac du Bonnet and Seven Sisters.Under the Nuclear Safety and Control Act, CNL's proposal requires an amendment to its existing Decommissioning Waste Facility Licence issued by the Canadian Nuclear Safety Commission (CNSC).

Document Public Comment Period on Intent to Make a Determination for Canadian Nuclear Laboratories Heel Storage Removal Project

  • Project Canadian Nuclear Laboratories Heel Storage Removal Project
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2021-04-15
  • Document: 138654E.html
  • Relevance: 71242.23
  • To help inform a determination under section 82 of the IAA 2019 in relation to the Heel Storage Removal Project at the Chalk River Laboratories, Canadian Nuclear Laboratories (CNL) is inviting comments from the public.
  •   Canadian Nuclear Laboratories Ltd is responsible for the management and operations of AECL's sites, including the CRL site, pursuant to a long-term contractual arrangement.
  •   Written comments must be submitted by March 25, 2021 to: Patrick Quinn, Director Corporate Communications Canadian Nuclear Laboratories Email: communications@CNL.ca The Proposed Project In support of decommissioning activities at Atomic Energy of Canada Limited's, Canadian Nuclear Laboratories (CNL) is planning to remove the remaining heel from a storage tank.
1 alternate format found
French HTML
  • Relevance: 57198.99
  • Les commentaires écrits doivent être soumis avant le 25 mars 2021 à:   Patrick Quinn, Director Corporate Communications Canadian Nuclear Laboratories Email: communications@CNL.ca Le projet proposé À l'appui des activités de déclassement du site de Chalk River d'Énergie atomique du Canada limitée, les Laboratoires Nucléaires Canadiens (LNC) prévoient retirer les résidus restants d'un réservoir de stockage.

Document Canadian Nuclear Laboratories Covered Structure

  • Project Canadian Nuclear Laboratories Covered Structure
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2019-10-25
  • Document: 132984E.html
  • Relevance: 25222.93
  • Covered Structure - Public Comments Invited The Chalk River Laboratories (CRL) site is owned by Atomic Energy of Canada Limited (AECL), a Federal Authority under the Impact Assessment Act 2019 (IAA 2019).
  •   Canadian Nuclear Laboratories Ltd is responsible for the management and operations of AECL's sites, including the CRL site, pursuant to a long-term contractual arrangement.
  • The proposed project is to construct a covered structure at the Chalk River Laboratories.
1 alternate format found
French HTML
  • Relevance: 11708.16
  • Structure couverte - Période de consultation publique Le site des Laboratoires de Chalk River (LCR) appartient à Énergie atomique du Canada limitée (EACL), une autorité fédérale en vertu de la Loi sur l'évaluation d'impact du Canada (LEI 2019). Les laboratoires nucléaires canadiens Ltd. sont responsables de la gestion et de l'exploitation des sites d'EACL, y compris le site des LCR, aux termes d'un accord contractuel à long terme. Pour contribuer à éclairer une décision prise en vertu de ...

Document Canadian Nuclear Laboratories Contractor Management Trailer Complex

  • Project Canadian Nuclear Laboratories Contractor Management Trailer Complex
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2020-04-30
  • Document: 134687E.html
  • Relevance: 21614.53
  • Canadian Nuclear Laboratories, on behalf of Atomic Energy of Canada (AECL) has determined that the proposed Contractor Management Trailer Complex at AECL's Chalk River site is not likely to cause significant adverse environmental effects.
  • Therefore, Canadian Nuclear Laboratories, on behalf of Atomic Energy of Canada may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.    
3 alternate formats found
English DOCX
  • Relevance: 21421.88
  • Canadian Nuclear Laboratories, on behalf of Atomic Energy of Canada (AECL) has determined that the proposed Contractor Management Trailer Complex at AECL’s Chalk River site is not likely to cause significant adverse environmental effects.
  • Therefore, Canadian Nuclear Laboratories, on behalf of Atomic Energy of Canada may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.
French DOCX
  • Relevance: 10629.07
  • Avis de détermination [bookmark: _GoBack]Le 29 avril 2020. Les Laboratoires Nucléaires Canadiens, au nom d'Énergie atomique du Canada limitée (EACL), ont déterminé que la contruction proposée d'un complexe de remorques pour la gestion des activités des entrepreneurs le site de Chalk River d'EACL n'est pas susceptible de causer des effets environnementaux négatifs importants. Les effets environnementaux potentiels seront gérés au moyen de mesures d'atténuation réalisables, sur les plans ...
French HTML
  • Relevance: 10318.69
  • Avis de détermination Le 29 avril 2020. Les Laboratoires Nucléaires Canadiens, au nom d'Énergie atomique du Canada limitée (EACL), ont déterminé que la contruction proposée d'une complexe de remorques pour la gestion des activités des entrepreneurs le site de Chalk River d'EACL n'est pas susceptible de causer des effets environnementaux négatifs importants. Les effets environnementaux potentiels seront gérés au moyen de mesures d'atténuation réalisables, sur les plans technique et ...

Document Appendix A to the Administrative Protocol between Canadian Nuclear Laboratories and the CNSC for the Nuclear Power Demonstration Closure Project (Revision 4, July 2020)

  • Project Nuclear Power Demonstration Closure Project
  • Document Category: Additional Information
  • Reference Number: 114
  • Updated: 2020-09-10
  • Document: 135970E.pdf
  • Relevance: 9261.48
  • File: 2.05 e-Doc: 5292828 Appendix A to the CNL-CNSC Administrative Protocol for the Nuclear Power Demonstration Closure Project Appendix A, Revision 4 – July 2020 e-Doc 6040702 e-Doc 6040702 Appendix A to the CNL-CNSC Administrative Protocol for the Page 2 of 6 Nuclear Power Demonstration Closure Project, Revision 4 Summary of changes Section Changes Date Table 2 Revision of CNL document titles and reference numbers, including some dates of submission November 2017 Table 3 Revision of dates and licensing milestones November 2017 Table 1 Revision of dates for environmental assessment milestones December 2017 Table 2 Simplification of title and footnote revised December 2017 Table 3 Revision to table headings December 2017 All Revision to tables September 2018 All Revision to tables July 2020 e-Doc 6040702 Appendix A to the CNL-CNSC Administrative Protocol for the Page 3 of 6 Nuclear Power
  • check CNSC 14 days 11 Federal and provincial review of CNL response to federal, provincial information requests/comments CNSC 90 days* 12** CNL responses to any additional federal and provincial comments CNL Milestone 13** CNSC review of CNL responses to additional federal and provincial comments CNSC 30 days 14 Submission of CNL responses to public comments CNL Milestone * This step commences upon receipt of a complete package of information, including technical supporting documentation. ** Steps 12 and 13 are iterative and dependent on step 10 until all comments are addressed to the satisfaction of the CNSC. 1 A complete submission is defined as meeting the requirements to the satisfaction of the CNSC, outlined in CNSC’s REGDOC 2.9.1 Environmental Principles, Assessments and Protection Measures and CNSC’s Generic Guidelines for the Preparation of an Environmental Impact Statement pursuant to the Canadian
  • Please refer to the CNSC website for further information on participating in public hearings at http://nuclearsafety.gc.ca/eng/the-commission/hearings/participate/index.cfm e-Doc 6040702 Appendix A to the CNL-CNSC Administrative Protocol for the Page 6 of 6 Nuclear Power Demonstration Closure Project, Revision 4 Step Deliverable / Activity Duration (calendar days) Completion Date 7 Submission of Presentation CMD to the CNSC Secretariat Minimum of 7 days prior to the second hearing day (to be determined by Secretariat) 8 Commission Hearing second hearing day 90 days after first hearing day (to be determined by Secretariat)

Document Appendix A to the Administrative Protocol between Canadian Nuclear Laboratories and the CNSC for the Nuclear Power Demonstration Closure Project (Revision 3, September 2018) - Under revision

  • Project Nuclear Power Demonstration Closure Project
  • Document Category: Additional Information
  • Reference Number: 105
  • Updated: 2018-09-10
  • Document: 125116E.pdf
  • Relevance: 9261.05
  • File: 2.05 e-Doc: 5292828 Appendix A to the Administrative Protocol for the Nuclear Power Demonstration Closure Project Appendix A, Revision 3 – September 2018 e-Doc 5548730 e-Doc 5548730 Appendix A, Revision 3 to the Administrative Protocol Page 2 of 5 for the Nuclear Power Demonstration Closure Project Summary of changes Section Changes Date Table 2 Revision of CNL document titles and reference numbers, including some dates of submission November 2017 Table 3 Revision of dates and licensing milestones November 2017 Table 1 Revision of dates for environmental assessment milestones December 2017 Table 2 Simplification of title and footnote revised December 2017 Table 3 Revision to table headings December 2017 All Revision to tables September 2018 e-Doc 5548730 Appendix A, Revision 3 to the Administrative Protocol Page 3 of 5 for the Nuclear Power Demonstration Closure Project Appendix A Table
  • 2018 8 CNSC review of public comments and transmission of public information requests/comments CNSC 30 days (Feb. 13 – Mar. 15, 2018) March 15, 2018 9 Complete0 F1 submission to respond to all federal, provincial information requests/comments CNL Milestone 10 Federal and provincial review of CNL response to federal, provincial information requests/comments CNSC 90 days* 11** CNL responses to any additional federal and provincial comments CNL Milestone 12** CNSC review of CNL responses to additional federal and provincial comments CNSC 30 days 13 Submission of CNL responses to public comments CNL Milestone 1 A complete submission is defined as meeting the requirements to the satisfaction of the CNSC, outlined in CNSC’s REGDOC 2.9.1 Environmental Principles, Assessments and Protection Measures and CNSC’s Generic Guidelines for the Preparation of an Environmental Impact Statement pursuant to the Canadian
  • e-Doc 5548730 Appendix A, Revision 3 to the Administrative Protocol Page 4 of 5 for the Nuclear Power Demonstration Closure Project Step Deliverable / activity Lead Duration (calendar days) Completion Date 14 CNSC review of CNL responses to public comments CNSC 30 days Final EIS 15 Submission of final EIS, federal and provincial comment table, and public comment table (English) CNL Milestone 16 Federal and provincial review of final EIS (or EIS addendum) to confirm that information requests/comments on draft EIS have been addressed CNSC 35 days1F2 17 Submission of final EIS or EIS addendum (French), federal and provincial comment tables (French and English), and public comment table*** CNL Milestone 18 CNSC acceptance and posting of final EIS and comment tables on CEAR and CNSC web page CNSC Up to 7 days 19 Preparation of EA report CNSC 90 days**** *Note: This step commences upon receipt of a complete package of information, including