Search Registry

Registry Search Mobile

Registry Search

Skip to Filters

8964 results

Project Coal Mountain Phase 2 Project

  • Location (Sparwood, British Columbia)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: Terminated
  • Reference Number: 80086
  • Last Modified: 2022-08-15
  • Relevance: 284852.32
  • Teck Coal Limited is proposing to expand its existing Coal Mountain Operations.The Coal Mountain Phase 2 Project, an open-pit coal mine, would be located in southeastern British Columbia, approximately 15 kilometers south of Sparwood, and 20 kilometers northwest of the proponent's current operations.The proposed project would include an approximate disturbance area of 1 000 hectares, and would produce approximately 2.25 million metric tonnes of clean coal per year over an estimated mine life of 34 years.

Project Bingay Main Coal Project

  • Location (Elkford, British Columbia)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: Terminated
  • Reference Number: 80024
  • Last Modified: 2022-08-29
  • Relevance: 256280.74
  • Centermount Coal Limited is proposing the construction, operation, and decommissioning of an open pit coal mine located approximately 21 kilometres north of Elkford, in southeastern British Columbia.As proposed, the project would produce 1 million tonnes of coal per year over a mine life of approximately 13 years.

Project Sukunka Coal Mine Project

  • Location (Northeast British Columbia, British Columbia)
  • Assessment Type: Environmental assessment by substitution under CEAA 2012
  • Status: Completed
  • Reference Number: 80013
  • Last Modified: 2022-12-21
  • Relevance: 243960.9
  • Glencore is proposing to construct and operate an open-pit metallurgical coal mine located approximately 55 kilometres south of Chetwynd and 40 kilometres west of Tumbler Ridge, British Columbia.As proposed, the Sukunka Coal Mine Project would produce 3 million tonnes of hard coking coal per year for export to overseas markets.Please note that the proponent was formerly known as Xstrata Coal Canada.

Project Michel Coal Project

  • Location (Sparwood, British Columbia)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80110
  • Last Modified: 2022-08-26
  • Relevance: 227536
  • North Coal Limited (formerly CanAus Coal Pty Ltd.), a wholly owned subsidiary of North Coal Pty Ltd., proposes to construct, operate, decommission and abandon a metallurgical coal mine located approximately 15 kilometres southeast of Sparwood, British Columbia, in the Elk Valley.As proposed, the Michel Coal Project would include two open-pits and produce between 2.3 and 4 million tonnes of raw coal per year, over a mine-life of up to 30 years.Please note that the project was formerly known as the Michel Creek Coking Coal Project.

Project Royal Vancouver Yacht Club (RVYC) Coal Harbour Marina Expansion

  • Location (Royal Vancouver Yacht Club (RVYC) Coal Harbour Marina Expansion, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Terminated
  • Reference Number: 80789
  • Last Modified: 2022-12-06
  • Relevance: 223722.2
  • RVYC have proposed the Coal Harbour Marina Expansion Project to expand and upgrade their marina and facilities.The marina is situated within Coal Harbour, immediately to the west of Deadman's Island and east of the Vancouver Rowing Club.

Project Tenas Project

  • Location (Telkwa, British Columbia)
  • Assessment Type: Assessment not applicable
  • Status: Completed
  • Reference Number: 83032
  • Last Modified: 2022-07-14
  • Relevance: 200395.08
  • Telkwa Coal Limited is proposing the construction, operation and reclamation of the Tenas Project, a new open-pit coal mine located about 25 kilometres south of Smithers, British Columbia.As proposed, the project would have an estimated production rate of 750,000 – 825,000 tonnes of metallurgical coal per year over a lifespan of about 25 years.The project also includes a rail loadout facility, power line, dedicated coal haul road and improvements to some existing roads.

Project Coal water treatment plant upgrades - Neptune Terminal

  • Location (Coal water treatment plant upgrades - Neptune Terminal, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 88523
  • Last Modified: 2024-04-26
  • Relevance: 198003.34
  • (the Applicant) is proposing to upgrade the coal water treatment system located at their terminal.The system treats a mixture of stormwater runoff and any process water that contacts coal product from the coal handling parts only on the site.The new facility will be located within the southern coal yard (northeast area of the terminal) and will be approximately 1,775 square metres in size.

Project Carbon Creek Metallurgical Coal Mine Project

  • Location (Chetwynd, British Columbia)
  • Assessment Type: Environmental assessment by substitution under CEAA 2012
  • Status: In progress
  • Reference Number: 80028
  • Last Modified: 2019-08-28
  • Relevance: 193481.19
  • Cardero Coal Ltd proposes to develop and operate an open pit metallurgical coal mine located approximately 60 kilometres northwest of Chetwynd and 40 kilometres west of Hudson's Hope, in northeast British Columbia.The production rate would be 4.1 million metric tonnes of metallurgical coal per year, over a mine life of 20 years.

Project Summit Mine 14 Project

  • Location (Grande Cache, Alberta)
  • Assessment Type: Assessment not applicable
  • Status: Completed
  • Reference Number: 83917
  • Last Modified: 2022-11-24
  • Relevance: 179705.87
  • Summit Coal Inc. is proposing the construction, operation, decommissioning and abandonment of an underground metallurgical coal mine located approximately four kilometres northeast of Grande Cache, Alberta.As proposed, the Summit Mine 14 Project would have a coal production capacity of approximately 3,562 tonnes per day.

Project Raven Underground Coal Mine Project

  • Location (Buckley Bay, British Columbia)
  • Assessment Type: Comprehensive study under CEAA 1992
  • Status: Terminated
  • Reference Number: 55529
  • Last Modified: 2017-11-29
  • Relevance: 164621.07
  • Compliance Coal Corporation doing business as the Comox Joint Venture is proposing the development of an underground coal mine near Buckley Bay on eastern Vancouver Island.The mine would produce approximately 30 million tonnes (Mt) of coal and rock (raw coal) over a 16 year period.The current mine plan calls for the development of the following components: portal and underground mine; coal processing plant; run-of-mine (ROM) coal, processed coal and clean coal stockpiles; topsoil and till stockpiles; engineered combined coarse and fine rejects stack dump; water management sediment pond; offices; maintenance building; power supply and distribution system (including a transmission line); and the transport of coal via truck from the mine site to Port Alberni.

Project Murray River Coal Project

  • Location (Tumbler Ridge, British Columbia)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: Completed
  • Reference Number: 80041
  • Last Modified: 2023-01-11
  • Relevance: 159565.21
  • HD Mining International Ltd. proposes the construction, operation and decommissioning of an underground coal mine and supporting infrastructure, including a 5.8 kilometre rail load-out.The proposed project is located 12.5 kilometres southwest of Tumbler Ridge, British Columbia and would produce six million tonnes of metallurgical coal per year for an estimated mine life of 25 years.

Project Grassy Mountain Coal Project

  • Location (Southwest Alberta, approximately 7 kilometres north of Blairmore, Alberta)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: Completed
  • Reference Number: 80101
  • Last Modified: 2021-08-06
  • Relevance: 159443.24
  • Benga Mining Limited, a wholly owned subsidiary of Riversdale Resources Limited, is proposing to construct and operate an open-pit metallurgical coal mine near the Crowsnest Pass, approximately seven kilometres north of the community of Blairmore, in southwest Alberta.As proposed, the production capacity of the project would be a maximum of 4.5 million tonnes of processed coal per year, over a mine-life of about 25 years.

Project Vista Coal Underground Mine Project and Vista Mine Phase II Expansion Project

  • Location (10 kilometres east of Hinton, Alberta)
  • Assessment Type: Assessment not applicable
  • Status: Completed
  • Reference Number: 80731
  • Last Modified: 2023-12-21
  • Relevance: 145065.67
  • Coalspur Mines (Operations) Ltd. is proposing to expand the existing Vista Coal Mine Phase I (Phase I), a surface coal mine located approximately 10 kilometres east of Hinton, Alberta.The proposal includes two expansions: an underground coal mine (Vista Coal Underground Mine) and a westward expansion of the Phase I mine pits (Vista Mine Phase II Expansion).The expansions would use existing Phase I mine infrastructure, such as coal processing facilities, raw and clean coal conveyors, primary access corridor, and a coal load-out facility.

Project Strategic assessment of thermal coal mining

  • Location (Canada-wide)
  • Assessment Type: Strategic assessment
  • Status: Terminated
  • Reference Number: 81576
  • Last Modified: 2021-07-08
  • Relevance: 143557.92
  • In December 2019, the Minister of the Environment and Climate Change announced that Canada would launch a Strategic Assessment of Thermal Coal Mining, which would guide decision-makers on how new thermal coal mine projects will be considered under the Impact Assessment Act.The Policy Statement indicates that this position will inform federal decision making on thermal coal mining projects.This policy statement addresses the primary objective of the Strategic Assessment of Thermal Coal Mining, which was to "guide decision-makers on how new thermal coal mine projects will be considered under the Impact Assessment Act," as per the draft Terms of Reference (published in July 2020).

Project Echo Hill Coal Mine Project

  • Location (Tumbler Ridge, British Columbia)
  • Assessment Type: Environmental assessment by substitution under CEAA 2012
  • Status: Terminated
  • Reference Number: 80018
  • Last Modified: 2017-12-20
  • Relevance: 143004.76
  • Hillsborough Resources Ltd. proposes the construction, operation and decommissioning of a coal mine located 44 kilometres north of Tumbler Ridge, British Columbia.The proposed project would produce 1 to 1.5 million tonnes of thermal coal per year for a mine life of 10 to 14 years.

Project Tent Mountain Mine Redevelopment Project

  • Location (16km west of Coleman (Alberta), Alberta)
  • Assessment Type: Assessment not applicable
  • Status: Terminated
  • Reference Number: 81436
  • Last Modified: 2023-10-10
  • Relevance: 138824.06
  • Montem Resources Alberta Operations Ltd. is proposing to restart and expand mining operations at the Tent Mountain Mine, an open-pit coal mine located 16 kilometres west of Coleman, Alberta that stopped operating in 1983.As proposed, the Tent Mountain Mine Redevelopment Project would expand the original mine pits to allow for the production of 4925 tonnes per day of raw coal used for steelmaking, over a 14-year mine life.The project would also include a coal handling and processing plant near the mining area and a rail loading facility located next to Provincial Highway #3 (Crowsnest Highway).

Project Donkin Export Coking Coal Project

  • Location (Cape Breton, Nova Scotia)
  • Assessment Type: Comprehensive study under CEAA 1992
  • Status: Completed
  • Reference Number: 63924
  • Last Modified: 2013-07-30
  • Relevance: 131654.24
  • The mine would have a lifespan of 30 plus years and extract approximately 3.6 million tonnes of coal per year.The project also includes a coal handling and processing plant that would be constructed to produce coal ready for transfer to a new barge loading facility.The project includes all activities and physical works associated with the construction, operation and decommissioning of the proposed Donkin Export Coking Coal Project, including, but not limited to, the following activities and components: underground coal mining; a coal handling preparation plant with a dry disposal reject handling system; ancillary services to support the underground mine and coal handling preparation plant, including a 138 kilovolt power line from Victoria Junction to the Project site; coal and mineral rock waste disposal and water treatment infrastructure; a barge load-out facility adjacent to the Donkin Peninsula to transport product coal to a transhipment mooring located southwest of Cape Morien; and marine transportation from the barge load-out facility to the transhipment mooring.

Project Dust Suppression Upgrade - Neptune Bulk Terminals (Canada) Ltd. - Project Permit 16-072 - Extension to the Expiry Date

  • Location (Dust Suppression Upgrade - Neptune Bulk Terminals (Canada) Ltd. - Project Permit 16-072 - Extension to the Expiry Date, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80622
  • Last Modified: 2020-06-08
  • Relevance: 94001.18
  • Neptune Bulk Terminals (Canada) Ltd. exports metallurgical coal to overseas markets.Coal is unloaded from unit trains at the terminal, and stockpiled on site.

Project Transfer Ponds Upgrades - Neptune

  • Location (North Vancouver, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 83443
  • Last Modified: 2022-07-19
  • Relevance: 87079.02
  • As the Allison Project (PER No. 2012-066 – Neptune Coal Capacity - Allison) moves towards completion, the terminal is experiencing an increased demand for water capacity.To help alleviate this demand, Neptune Bulk Terminals (Neptune) is proposing to install a 500 metre long coalwater forcemain from transfer pond 2 to transfer pond 5 (along the centre of their coal operations).

Project Arctos Anthracite Project

  • Location (Iskut, Stewart, Hazelton, British Columbia)
  • Assessment Type: Environmental assessment by substitution under CEAA 2012
  • Status: In progress
  • Reference Number: 80040
  • Last Modified: 2019-08-28
  • Relevance: 81436.44
  • Arctos Anthracite Joint Venture proposes the construction, operation and decommissioning of an anthracite coal mine in northwestern British Columbia.The proposed project would produce about 3 million tonnes per year of anthracite coal over a mine life of approximately 25 years.The proposed project would also include constructing a 147 kilometre extension to an existing railway from its current terminus to the mine site.

Project Neptune Coal Capacity Project and West Quadrant Shiploader - Project Permit No. 12-066-1 - Amendment (Condition 18 - Extended Hours)

  • Location (North Vancouver, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80503
  • Last Modified: 2020-04-17
  • Relevance: 74442.38
  • Neptune Bulk Terminals proposes to carry out physical works associated with the approved Coal Capacity Project and West Quadrant Shiploader 24 hours a day, 7 days a week, excluding statutory holidays to August 31, 2020.

Project New Potash Export - Westshore

  • Location (New Potash Export - Westshore, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 83164
  • Last Modified: 2022-04-22
  • Relevance: 68198.18
  • nbsp;  In order to incorporate potash operations, upgrades at Westshore Terminals will be required, which will broadly include:   A new potash storage building, including tripper conveyor and portal reclaimer located on the northwest corner of the site   A new enclosed potash railcar dumper on the south side of the site, adjacent to the existing dumpers  Modifications to the existing inbound rail system to include a new section of rail to connect the new railcar dumper to the existing inner rail loop   A new enclosed gallery style conveyors and transfer towers to transport potash to Berth #2  Dust collectors at conveyor transfer points   Modifications to or replacement of the existing Berth #2 shiploader feed conveyors   Removal of 2 existing quadrant-style shiploaders at Berth #2  Installation of 2 new dual-purpose shiploaders at Berth #2 to allow both potash and coal

Project La Plonge Solar and Battery Energy Storage System

  • Location (English River First Nation Reserve, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 87438
  • Last Modified: 2024-04-25
  • Relevance: 50609.17
  • In addition to generating renewable energy, reducing Saskatchewan's greenhouse gas emissions, and reducing dependence on coal for electricity generation, the La Plonge solar and Battery Energy Storage System project provides grid re-enforcement for the remote radial feeder.

Document Notice of Termination

  • Project Coal Mountain Phase 2 Project
  • Document Category: Additional Information
  • Reference Number: 11
  • Updated: 2022-08-15
  • Document: 144806E.html
  • Relevance: 48300.01
  • Notice of Termination Ottawa — August 15, 2022 — The Impact Assessment Agency of Canada (the Agency) has terminated the environmental assessment of the Coal Mountain Phase 2 Project (the Project) pursuant to the Canadian Environmental Assessment Act, 2012.
  • Teck Coal Limited notified the Agency that it wishes to terminate the federal environmental assessment for the Project.
1 alternate format found
French HTML
  • Relevance: 45026.97
  • Avis de cessation Ottawa — 15 août 2022 — L'Agence d'évaluation d'impact du Canada (l'Agence) a mis fin à l'évaluation environnementale du projet Coal Mountain, phase 2 en vertu de la Loi canadienne sur l'évaluation environnementale (2012).
  • Teck Coal Limited a informé l'Agence qu'elle souhaite mettre fin à l'évaluation environnementale fédérale du projet.

Last UpdatedDisplay Filters

Filters

Comment Tags Display Filters

Date modified: