Black Bear Power Plant Project

Registry Search Mobile

Registry Search

Skip to Filters

63 results

Document Notice of Impact Assessment Decision with Reasons

  • Project Black Bear Power Plant Project
  • Document Category: Additional Information
  • Reference Number: 30
  • Document Date: 2024-12-23
  • Document: 160364E.html
  • Relevance: 350.73
  • Notice of Impact Assessment Decision with Reasons Ottawa — December 23, 2024 — The Impact Assessment Agency of Canada (IAAC) decided that an impact assessment is not required for the Black Bear Power Plant Project (the project) proposed by Kiwetinohk Energy Corp. (the proponent), located in Alberta. In accordance with subsection 16(2) of the Impact Assessment Act (the IAA), IAAC has considered each of the following factors: the Initial Project Description and Response to the Summary of ...
1 alternate format found
French HTML
  • Relevance: 299.73
  • Avis de décision relative à une évaluation d'impact avec motifs Ottawa – 23 décembre 2024 – L'Agence d'évaluation d'impact du Canada (l'AEIC) a décidé qu'une évaluation d'impact n'est pas nécessaire pour le projet de centrale électrique Black Bear (le projet) proposé par Kiwetinohk Energy Corp. (le promoteur), situé en Alberta.   Conformément au paragraphe 16(2) de la Loi sur l'évaluation d'impact (la LEI), l'AEIC a pris en considération chacun des éléments suivants : la description ...

Document Notice of Time Limit Resumption

  • Project Black Bear Power Plant Project
  • Document Category: Additional Information
  • Reference Number: 28
  • Document Date: 2024-12-18
  • Document: 160297E.html
  • Relevance: 350.25
  • Notice of Time Limit Resumption Ottawa — December 18, 2024 — On December 11, 2024, Kiwetinohk Energy Corp. (the proponent) provided its response to the Summary of Issues for the Black Bear Power Plant Project (the project) to the Impact Assessment Agency of Canada (IAAC). On December 16, 2024, IAAC determined that this document contains sufficient information to inform its section 16 decision regarding whether an impact assessment is required. Therefore, IAAC is of the view that a Detailed ...
1 alternate format found
French HTML
  • Relevance: 299.25
  • Avis de reprise du délai Ottawa — 18 décembre 2024 — Le 11 décembre 2024, Kiwetinohk Energy Corporation (le promoteur) a fourni sa réponse au sommaire des questions (en anglais seulement) pour le projet de centrale électrique Black Bear (le projet) à l'Agence d'évaluation d'impact du Canada (l'AEIC). Le 16 décembre 2024, l'AEIC a déterminé que ce document contenait suffisamment de renseignements pour éclairer sa décision en vertu de l'article 16 quant à savoir si une évaluation d'impact est ...

Document Summary of the Response to the Summary of Issues

  • Project Black Bear Power Plant Project
  • Document Category: Additional Information
  • Reference Number: 27
  • Document Date: 2024-12-11
  • Document: 160201E.pdf
  • Relevance: 349.59
  • 1 Summary of Issues – Crosswalk Document Black Bear Power Plant Project KIWETINOHK RESPONSE (ENGLISH PLAIN-LANGUAGE SUMMARY) December 11, 2024 Table I – Issues to Inform the Impact Assessment Agency of Canada’s Decision on Whether an Impact Assessment is Required The following table provides a high-level summary of key issues that were submitted to the Impact Assessment Agency of Canada (IAAC) about the Black Bear Power Plant Project (the Project or BBPP) during the ...
1 alternate format found
French PDF
  • Relevance: 298.59
  • 1 Sommaire des questions Projet de centrale électrique Black Bear RÉPONSE DE KIWETINOHK (RÉSUMÉ EN FRANÇAIS EN LANGAGE CLAIR) 11 décembre 2024 Tableau I – Questions pour éclairer la décision de l’Agence d’évaluation d’impact du Canada sur la nécessité d’une évaluation d’impact Le tableau suivant présente un résumé de haut niveau des principales questions dans les domaines de compétence fédérale, qui ont été soumises à l’Agence d’évaluation d’impact du Canada (AEIC) au sujet du ...

Document Supporting Geospatial Data - Initial Project Description

  • Project Black Bear Power Plant Project
  • Document Category: Geospatial data files
  • Reference Number: 29
  • Document Date: 2024-11-06
  • Document: 160298E.html
  • Relevance: 346.3
  • Supporting Geospatial Data — Initial Project Description Kiwetinohk Energy Corp. (KEC) has provided electronic geospatial data files on November 6, 2024, related to the Black Bear Power Plant Project. The dataset contains the following eight layers for maps provided in the Initial Project Description. These data files are available to the public under the terms of the Open Government Licence – Canada. Layer Name Projection (name) Page number BBPP_Project Area EPSG: 2955 - NAD83(CSRS) / ...
1 alternate format found
French HTML
  • Relevance: 295.3
  • Données géospatiales connexes — Description initiale du projet (anglais seulement) Kiwetinohk Energy Corp. a fourni des fichiers électroniques de données géospatiales le 6 novembre 2024 liées au projet de centrale électrique Black Bear. L'ensemble de données contient huit de couches pour les cartes fournies dans la description initiale du projet. Ces fichiers de données sont mis à la disposition du public selon les termes de la Licence du gouvernement ouvert – Canada. Nom de la ...

Document Notice of Time Limit Suspension with Reasons

  • Project Black Bear Power Plant Project
  • Document Category: Additional Information
  • Reference Number: 25
  • Document Date: 2024-09-13
  • Document: 159016E.html
  • Relevance: 341.3
  • Notice of Time Limit Suspension with Reasons   Ottawa — September 13, 2024 — On September 6, 2024, the Impact Assessment Agency of Canada (IAAC) suspended the 180-day time limit for the planning phase under the Impact Assessment Act for the Black Bear Power Plant Project proposed by Kiwetinohk Energy Corp. (the proponent). IAAC has taken this action in consideration of a written request from the proponent that the time limit be suspended in order that it may have sufficient time to ...
1 alternate format found
French HTML
  • Relevance: 290.3
  • Avis de suspension de délai avec motifs   Ottawa — 13 septembre 2024 — Le 6 septembre 2024, l'Agence d'évaluation d'impact du Canada (l'AEIC) a suspendu le délai de 180 jours pour l'étape préparatoire en vertu de la Loi sur l'évaluation d'impact pour le projet de centrale électrique Black Bear, proposé par Kiwetinohk Energy Corp. (le promoteur). L'AEIC a pris cette mesure à la suite d'une demande écrite du promoteur (disponible seulement en anglais) de suspendre le délai afin d'avoir ...

Document Summary of Issues

  • Project Black Bear Power Plant Project
  • Document Category: Additional Information
  • Reference Number: 22
  • Document Date: 2024-08-23
  • Document: 158811E.pdf
  • Relevance: 339.38
  • PAGE 1 OF 6 Summary of Issues Black Bear Power Plant Project Table I – Issues to Inform the Impact Assessment Agency of Canada’s Decision on Whether an Impact Assessment is Required The following table provides a high-level summary of key issues within areas of federal jurisdiction that were submitted to the Impact Assessment Agency of Canada (IAAC) about the Black Bear Power Plant Project (the Project) during the public comment period on the Summary of the Initial Project ...
1 alternate format found
French PDF
  • Relevance: 288.38
  • PAGE 1 OF 7 Sommaire des questions Projet de centrale électrique Black Bear Tableau I – Questions pour éclairer la décision de l’Agence d’évaluation d’impact du Canada sur la nécessité d’une évaluation d’impact Le tableau suivant présente un résumé de haut niveau des principales questions dans les domaines de compétence fédérale, qui ont été soumises à l’Agence d’évaluation d’impact du Canada (AEIC) au sujet du projet de centrale électrique Black Bear (le projet), pendant ...

Document Public Notice - Participant Funding Available

  • Project Black Bear Power Plant Project
  • Document Category: For Public Participation
  • Reference Number: 4
  • Document Date: 2024-07-29
  • Document: 158298E.html
  • Relevance: 337.11
  • Public Notice Participant Funding Available   July 29, 2024 — Funding provided by the Impact Assessment Agency of Canada (IAAC) is now available to help Indigenous Peoples and the public participate in the impact assessment process for the proposed Black Bear Power Plant Project, a new natural gas-fueled electricity generating facility located near Swan Hills, Alberta. Funding is available for eligible individuals and groups to support their participation throughout the planning phase ...
1 alternate format found
French HTML
  • Relevance: 286.11
  • Avis public Disponibilité d'une aide financière aux participants   29 juillet 2024 — L'Agence d'évaluation d'impact du Canada (l'AEIC) met à la disposition des peuples autochtones et du public une aide financière pour favoriser leur participation au processus d'évaluation d'impact du project de centrale électrique Black Bear, une nouvelle centrale électrique alimentée au gaz naturel située près de Swan Hills, en Alberta. Cette aide financière est mise à la disposition des particuliers ...

Document Public Notice - Comments Invited on the Summary of the Initial Project Description

  • Project Black Bear Power Plant Project
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2024-07-25
  • Document: 158260E.html
  • Relevance: 336.75
  • Public Notice Comments Invited on the Summary of the Initial Project Description What is happening? July 25, 2024 — Kiwetinohk Energy Corp. is proposing the Black Bear Power Plant Project, a new power plant located near Swan Hills, Alberta. The Impact Assessment Agency of Canada (IAAC) invites the public and Indigenous Peoples to review the summary of the Initial Project Description and provide comments on the proposed project. This feedback will help IAAC prepare a summary of issues that ...
1 alternate format found
French HTML
  • Relevance: 285.75
  • Avis public Période de consultation publique sur le résumé de la description initiale du projet Que se passe-t-il? Le 25 juillet 2024 — Kiwetinohk Energy Corp. propose le projet de centrale électrique Black Bear, une nouvelle centrale électrique située près de Swan Hills, en Alberta. L'Agence d'évaluation d'impact du Canada (l'AEIC) invite les peuples autochtones et le public à examiner le résumé de la description initiale du projet et à formuler des commentaires sur le projet proposé. ...

Document Summary of the Initial Project Description of a designated project

  • Project Black Bear Power Plant Project
  • Document Category: For Public Participation
  • Reference Number: 2
  • Document Date: 2024-07-18
  • Document: 158276E.pdf
  • Relevance: 336.12
  • INITIAL PROJECT DESCRIPTION SUMMARY For the BLACK BEAR POWER PLANT Project Location 19 km south of Swan Hills, Alberta LSDs 1, 2, 6, 7, 8, Section 15, Township 64, Range 11, W5M Proponent Kiwetinohk Energy Corp. Submitted to IMPACT ASSESSMENT AGENCY OF CANADA DOCUMENT COMPLETED BY July 2024 Black Bear Power Plant Initial Project Description Summary i THIS PAGE INTENTIONALLY BLANK Black Bear Power Plant ...
1 alternate format found
French PDF
  • Relevance: 285.12
  • DESCRIPTION INITIALE DE PROJET - RÉSUMÉ Pour la CENTRALE ÉLECTRIQUE BLACK BEAR (BLACK BEAR POWER PLANT- BBPP) Emplacement du Projet 19 km au sud de Swan Hills, Alberta SDL 1, 2, 6, 7, 8, section 15, Canton 64, Rang 11, O5M Promoteur Kiwetinohk Energy Corporation Soumis à AGENCE CANADIENNE D'ÉVALUATION D'IMPACT RÉDIGÉ PAR TRADUIT DE LA VERION ANGLAISE juillet 2024 Centrale électrique Black Bear Description initiale du projet - ...

Comment Comment on the summary of the Initial Project Description for the Black Bear Power Plant Project

  • Comment Black Bear Power Plant Project
  • Author: Administrator on behalf of Swan River First Nation
  • Reference Number: 11
  • Submitted: 2024-08-16 - 3:04 PM
  • Project Phase: N/A
  • Participation Notice: N/A
  • Relevance: 237.8
  • Hello Ashifa,   Following up on our continued conversation regarding the Black Bear Power Plant proposal and notification that information provided to date would be available for public ...
  • Attachment Included
  • Relevance: 237.8
  • Traditional Territory of Swan River First Nation As Agreed To At the Signing of Treaty 8-1899
  • Attachment Included
  • Relevance: 237.8
  • SWAN RIVER FIRST NATION “CONSULTATION UNIT” P.O. Box 270 Kinuso, Alberta T0G 1K0 Phone: (780) 775-3536 Fax: (780) 775-3796 2022-09-13 Jamie Lacey LandSolutions Inc. P.O. Box 60 Bentley, Alberta T0C 0J0 Dear Jamie, Re: Power Station Site ...
  • Attachment Included
  • Relevance: 237.8
  • Swan River First Nation Consultation Policy Purpose This Consultation Policy (Policy) sets out the objectives, principles, and process for consultation between Swan River First Nation (Swan River), the Government of Alberta and the ...
  • Attachment Included
  • Relevance: 237.8
  • SWAN RIVER FIRST NATION “CONSULTATION UNIT” P.O. Box 270 Kinuso, Alberta T0G 1K0 Phone: (780) 775-3536 Fax: (780) 775-3796 2022-09-13 Jamie Lacey LandSolutions Inc. P.O. Box 60 Bentley, Alberta T0C 0J0 Dear Jamie, Re: Power Station Site ...
  • Attachment Included
  • Relevance: 237.8
  • Swan River First Nation Consultation Box 270 Kinuso, Alberta T0G 1K0 Office: 780-775-2349 Swan River consultation site assessment Analysis 1 Table of Content 1. Table of contents 2. Rights of SRFN and Scope of Operations 3.General Site ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Date modified: