Marathon Palladium Project
Environmental Impact Statement – Supporting Information Document 18 – Draft Conceptual Closure Plan (Prepared by True Grit Consulting Limited)
- Section 1.0 – Introduction [PDF - 559 KB]
- Section 2.0 – Project Information [PDF - 80 KB]
- Section 3.0 – Project Description [PDF - 1.4 MB]
- Section 4.0 – Progressive Rehabilitation [PDF - 43 KB]
- Section 5.0 – Temporary Suspension [PDF - 54 KB]
- Section 6.0 – State of Inactivity [PDF - 55 KB]
- Section 7.0 – Closed Out [PDF - 88 KB]
- Section 8.0 – Monitoring Programs [PDF - 52 KB]
- Section 9.0 – Expected Site Conditions [PDF - 48 KB]
- Section 10.0 – Costs [PDF - 42 KB]
- Section 11.0 – Financial Assistance [PDF - 41 KB]
- Section 12.0 – Conceptual Closure Plan Consultation and Engagement [PDF - 148 KB]
- Section 13.0 – References [PDF - 44 KB]
- Tables [PDF - 895 KB]
- Figures [PDF - 34.5 MB]
- Appendix A – Marathon Project – Hydrology & Water Management (Calder Engineering) [PDF - 3.6 MB]
- Appendix B – Marathon Project – Supporting Document – Baseline Aquatic Resources (EcoMetrix Inc.) [PDF - 126 MB]
- Appendix C – Marathon Project – Baseline Report – Hydrogeology (TGCL) [PDF - 26 MB]
- Appendix D – Marathon Project – Impact Assessment – Hydrogeology (TGCL) [PDF - 29.9 MB]
- Appendix E – Marathon Project – Terrestrial Baseline Assessment 2009 (Northern Bioscience) [PDF - 2.6 MB]
- Appendix F – Marathon Project – Combined Storage Area PSMF – Water/Solids Balance (Knight Piesold) [PDF - 2.7 MB]
- Appendix G – Marathon Project Supporting Document – Geochemical Assessment of Mine Components (EcoMetrix Inc.) [PDF - 9.9 MB]
- Appendix H – Marathon Project – Geochemical Characterization Program for Feasibility Study (Golder Associates) [PDF - 8.7 MB]
- Appendix I – Marathon Project – Process Solids Management Facility – Conceptual Closure Plan (Knight Piesold) [PDF - 2.9 MB]
- Appendix J – Mine Tailing Revegetation (Lakehead University) [PDF - 601 KB]
Document reference number: 232