Language selection

Archived Content

Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact us to request a format other than those available.

Whites Point Quarry and Marine Terminal Project

About the Project

Bilcon of Nova Scotia Corporation is proposing to construct and operate a basalt quarry, processing facility and marine terminal located on Digby Neck in Digby County, Nova Scotia.

Quarrying is expected to take place on 120 hectares of land, with production expected to be 2 million tonnes of aggregate per year. Approximately 4 hectares of new quarry would be opened each year. The land-based quarry operations are expected to be year-round, with aggregate stockpiled for ship loading once per week. Drilling and blasting of basalt rock, loading, hauling, crushing, screening, washing and stockpiling would be done on-site.

Land-based permanent structures would include rock crushers, screens, closed circuit wash facilities, conveyers, load out tunnel, support structures and environmental control structures. Associated construction processes would include the erection of on-land aggregate processing equipment, conveyers and wash-water pumping systems.

Marine facilities would include a conveyor, ship loader, berthing dolphins and mooring buoys. Construction processes for the marine terminal infrastructure would include the anchoring of pile support structures to the basalt rock extending offshore, as well as the construction of concrete caps as dolphins. Approximately 40,000 tonnes of aggregate would be produced for loading each week.