Interior Fuel Storage
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
This project proposes the installation of a fuel storage site in the interior of Pukaskwa National Park for helicopter refuelling purposes. The proposed site is located at Cabin Lake. The project proposes to store 4 x 55-gallon barrels (total 220 gallons / 832 L) in a 1 m x 3 m aluminum containment box that is designed to store aviation fuel outdoors. This project would allow fire operation personnel to refuel helicopter(s) at a closer location than the current refueling location at the Marathon Airport, resulting in time- and cost-savings by reducing the turn around time for refueling.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | New project being assessed by Parks Canada – Public comments invited from July 2 2026 to August 2 2026 | - | July 2, 2026 |
Contacts
Pukaskwa National ParkNorthern Ontario Field Unit Unité de gestion du Nord de l'Ontario
0, Hwy 627
PO Box 212
Heron Bay, Ontario P0T 1R0
Email: ia-NOFU-ei@pc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Pukaskwa National Park of Canada (Ontario)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
In progress -
Start Date
2026-07-02 -
Proponent
Parks Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
90596
Nearby assessments
...within 200 kilometres-
Pic Mobert - MHC Section 95 2018-2019 4 Units
Pic Mobert First Nation - North -
Family Services Building
Netmizaaggamig Nishnaabeg - Pic Mobert Fist Nation - 195 -
Netmizaaggamig Nishnaabeg - Subdivision Development
Netmizaaggamig Nishnaabeg-Subdivision Development -
Paddling Sites Upgrades Phase II
Pukaskwa National Park -
Wetland Walkway Replacement - Hattie Cove
Pukaskwa National Park -
Wetland Walkway Replacement, additions to scope - Hattie Cove
Pukaskwa National Parc -
North Loop Parking And Privy - Hattie Cove Campground, Pukaskwa National Park
Pukaskwa National Park of Canada -
Backcountry Paddling Site Upgrades
Pukaskwa National Park of Canada -
Biigtigong Nishnaabeg New K4-8 School
Biigtigong Nishnaabeg First Nation -
Radio Tower Replacement at Administration Building
Pukaskwa National Park -
Pic River Roads Rehabilitation
Pic River Roads Rehabilitation -
Biigtigong Nishnaabeg Water Treatment System Project
Biigtigong Nishnaabeg (Ojibways of the Pic River First Nation) -
Marathon Palladium Project
Marathon -
Delineation and Soil Remediation at Hawkins Island Coast Guard Site, Lake Superior, Ontario
Hawkins Island -
Davieaux Island - Davieaux Island Lightstation - Abatement, Repairs, and Debris Removal
Davieaux Island Lightstation, Ontario -
Michipicoten First Nation White Sands Creek Rehabilitation Project
Township of Wawa -
Michipicoten First Nation Water Treatment Plan Upgrades
Michipicoten First Nation -
Michipicoten First Nation Construction of Two Residential Multiplexes
Michipicoten First Nation -
Michipicoten First Nation Roads Rehabilitation Project
Michipicoten First Nation -
Soil Remediation at Slate Island Coast Guard Site, Patterson Island, Ontario
Slate Island, Ontario -
Michipicoten River Boat Launch 2021
Michipicoten River -
Magino Gold Project
Wawa -
Subdivision Development on Missanabie Cree First Nation
Missanabie Cree First Nation -
Lot Development and Construction of 6 Housing Units on Missanabie Cree First Nation
Missanabie Cree First Nation -
Pays Plat First Nation - Lot Servicing Project (20)
Pays Plat First Nation -
Pays Plat New Housing Units
Pays Plat -
New Fibre Installation
Project Site 1 -
New Fibre Installation
Project Site 2 -
Greenstone Mine Project
Geraldton -
AZA Roadway Granular Procurement and Design-Build Construction
Animbiigoo Zaagi'igan Anishinaabek -
Chapleau Cree First Nation Residential Lot Development on Margaret Ann Road
Chapleau Cree First Nation -
BNA District Heating System Project
Sand Point First Nation Reserve -
Lake Superior National Marine Conservation Area Discovery Centre
Lake Superior National Marine Conservation Area -
Construction of Micro-Subdivision Lots - Chapleau Cree First Nation
Chapleau Cree First Nation -
New Fibre Installation
Project Site 3 -
Batchawana Small Craft Harbour Dredging and Shore Protection
Batchawana -
New Fibre Installation
Project site 3: Obadjiwan Indian Reserve 15E (Batchewana First Nation)