Project 15-Mile Processing Hub Project

  • Location (15 Mile Mine Site, Nova Scotia) (Old Austen Mine Site, Nova Scotia) (Old Mitchell Mine Site, Nova Scotia)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 90533
  • Last Modified: 2026-07-22
  • Relevance: 379939.84
  • As proposed, the 15-Mile Processing Hub Project would consist of the 15-Mile Mine site (formerly the Fifteen Mile Stream Gold Project), Old Austen Mine site (formerly the Beaver Dam Mine Project) and Old Mitchell Mine site (formerly the Cochrane Hill Gold Project).

Document Notice of Termination

  • Project Beaver Dam Mine Project
  • Document Category: Additional Information
  • Reference Number: 342
  • Document Date: 2023-09-26
  • Document: 153071E.html
  • Relevance: 128871.22
  • Notice of Termination Ottawa — September 26, 2023 — The Impact Assessment Agency of Canada (the Agency) has terminated the environmental assessment of the Beaver Dam Mine Project (the project) pursuant to section 62 of the Canadian Environmental Assessment Act, 2012.
1 alternate format found
French HTML
  • Relevance: 108481.88
  • Avis de cessation Ottawa — 26 septembre 2023 — L'Agence d'évaluation d'impact du Canada (l'Agence) a mis fin à l'évaluation environnementale du projet de la mine Beaver Dam (le projet) en vertu de l'article 62 de la Loi canadienne sur l'évaluation environnementale (2012).

Document Notice of Time Limit Extension

  • Project Beaver Dam Mine Project
  • Document Category: Additional Information
  • Reference Number: 332
  • Document Date: 2022-08-17
  • Document: 144818E.html
  • Relevance: 114255.63
  • (the proponent) to provide the required information or studies described in the Final Environmental Impact Statement Guidelines for the environmental assessment of the Beaver Dam Mine Project.
  • For further information on this time limit extension or the environmental assessment, please contact: Beaver Dam Mine Project Impact Assessment Agency of Canada 200-1801 Hollis Street Halifax, Nova Scotia B3J 3N4 Email: bdmine-minebd@iaac-aeic.gc.ca
1 alternate format found
French HTML
  • Relevance: 96169.7
  • (le promoteur) pour fournir les études ou renseignements demandés, décrits dans la version définitive des lignes directrices relatives à l'étude d'impact environnemental du Projet de la mine Beaver Dam.
  • Pour obtenir des renseignements supplémentaires sur la prolongation du délai ou l'évaluation environnementale, veuillez communiquer avec : Projet de la mine Beaver Dam Agence d'évaluation d'impact du Canada 200-1801, rue Hollis Halifax (Nouvelle-Écosse) B3J 3N4 Courriel : bdmine-minebd@iaac-aeic.gc.ca

Document From the Impact Assessment Agency of Canada to Atlantic Gold Corporation re: Information Requests (Round 3, Part 2)

  • Project Beaver Dam Mine Project
  • Document Category: Additional Information
  • Reference Number: 326
  • Document Date: 2022-02-03
  • Document: 142753E.pdf
  • Relevance: 111078.56
  • Suite 200 Bureau 200 1801 Hollis Street 1801, rue Hollis Halifax NS B3J 3N4 Halifax, NÉ B3J 3N4 February 3, 2022 Craig Hudson Atlantic Mining NS Inc. 409 Billybell Way, Mooseland Middle Musquodoboit, NS B0N 1X0 SUBJECT: Beaver Dam Mine Project – Information Requirements (Round 3 – Part 2) Dear Craig Hudson: The Impact Assessment Agency of Canada (the Agency) has completed its technical review of the Round 2 Information Requirement (IR) response for CEAA-2-31 for the proposed Beaver Dam Mine Project (the Project).
  • Project Manager, Impact Assessment Agency Atlantic Region https://iaac-aeic.gc.ca/050/evaluations/proj/80111 Suite 200 Bureau 200 1801 Hollis Street 1801, rue Hollis Halifax NS B3J 3N4 Halifax, NÉ B3J 3N4 Cc: Suzanne Wade, Stephen Zwicker & Michael Hingston – Environment and Climate Change Canada Christopher Burbidge & Matthew Baker – Fisheries and Oceans Canada Shelley Ball – Natural Resources Canada Jason Flanagan – Transport Canada Joel Kaushansky & Beverly Ramos-Casey – Health Canada Bridget Tutty – NS Environment and Climate Change Attachment 1 - Beaver Dam Mine Project Information Requirements (Round 3 – Part 2) from the Environmental Impact Statement Review Attachment 1: Beaver Dam Mine Project Information Requirements (Round 3 - Part 2) from the Environmental Impact Statement Review: February 3, 2022 INTRODUCTION
  • The Impact Assessment Agency of Canada (the Agency) completed its technical review of the Environmental Impact Statement (EIS) and associated EIS Summary for the proposed Beaver Dam Mine Project.

Document Public Notice - Public Comments Invited on a Revised Summary of the Environmental Impact Statement

  • Project Beaver Dam Mine Project
  • Document Category: For Public Participation
  • Reference Number: 49
  • Document Date: 2021-11-16
  • Document: 142249E.html
  • Relevance: 105784.03
  • Public Notice Beaver Dam Mine Project — Public Comments Invited   November 30, 2021 — The deadline to submit comments has been extended from December 16, 2021, to December 17, 2021.
  • November 16, 2021 - The Impact Assessment Agency of Canada and the Nova Scotia Department of Environment and Climate Change (ECC) invite the public and Indigenous groups to comment on the potential environmental effects of the proposed Beaver Dam Mine Project, located in Marinette, Nova Scotia.
  • The Beaver Dam Mine Project would have an ore production rate of 2.1 million tonnes/year, over a five-year period.
1 alternate format found
French HTML
  • Relevance: 86185.58
  • Avis public Projet de la mine Beaver Dam — Période de consultation publique   Le 30 novembre 2021 — La date limite pour présenter des commentaires a été reportée du 16 décembre 2021 au 17 décembre 2021.
  • Le 16 novembre 2021 — L'Agence d'évaluation d'impact du Canada (l'Agence) et le ministère de l'Environnement et Changement climatique Nouvelle-Écosse (ECC) invitent le public et les groups autochtones à formuler leur commentaires sur les effets environnementaux potentiels du projet de la mine Beaver Dam, situé à Marinette, en Nouvelle-Écosse.
  • Le projet de la mine Beaver Dam aurait un taux de production de minerai de 2,1 millions de tonnes par an, sur une période de cinq ans.

Document From the Canadian Environmental Assessment Agency to Atlantic Gold Corporation re: non-conformity of the Environmental Impact Statement

  • Project Beaver Dam Mine Project
  • Document Category: Additional Information
  • Reference Number: 17
  • Document Date: 2017-04-27
  • Document: 118882E.html
  • Relevance: 87043.51
  • Rod, SUBJECT: Outcome of conformity review of the Beaver Dam Mine Project Environmental Impact Statement On March 27, 2017, the Canadian Environmental Assessment Agency (the Agency) received the Environmental Impact Statement (EIS) and EIS Summary for the Beaver Dam Mine Project (the Project) from Atlantic Gold Corporation (the proponent).
  • The Agency reviewed the EIS in consideration of the requirements of the Guidelines for the Preparation of an Environmental Impact Statement pursuant to the Canadian Environmental Assessment Act, 2012 for the Beaver Dam Mine Project (EIS Guidelines), dated January 29, 2016.
  • Beaver dam IR 17).
1 alternate format found
English PDF
  • Relevance: 84647.1
  • Rod, SUBJECT: Outcome of conformity review of the Beaver Dam Mine Project Environmental Impact Statement On March 27, 2017, the Canadian Environmental Assessment Agency (the Agency) received the Environmental Impact Statement (EIS) and EIS Summary for the Beaver Dam Mine Project (the Project) from Atlantic Gold Corporation (the proponent).
  • Beaver dam IR 17).
  • RR # 2, Middle Musquodoboit, NS B0N 1X0 JRod@atlanticgoldcorporation.com SUBJECT: Outcome of conformity review of the Beaver Dam Mine Project Environmental Impact Statement

Document From the Canadian Environmental Assessment Agency to Atlantic Gold Corporation re: Information Requests Round 1 (Part 1)

  • Project Beaver Dam Mine Project
  • Document Category: Additional Information
  • Reference Number: 22
  • Document Date: 2017-08-09
  • Document: 121203E.html
  • Relevance: 85380.65
  • Confirm that the 35 km radius extends from the complete Beaver Dam Mine Project area (including the Beaver Dam mine site, the haul road and the Touquoy mine site) and not just the Beaver Dam mine site.
  • No hydrogeological model is provided to support the activities at the Beaver Dam open pit or the Touquoy Mine site.
  • Provide justification for using the Touquoy Mine Focus Report to describe fugitive air emissions for the Beaver Dam Mine Project and potential associated health effects from activities at the Beaver Dam Mine, haul roads and Touquoy Mine; or conduct air modelling which includes all project activity sources.
1 alternate format found
English PDF
  • Relevance: 85067.13
  • Confirm that the 35 km radius extends from the complete Beaver Dam Mine Project area (including the Beaver Dam mine site, the haul road and the Touquoy mine site) and not just the Beaver Dam mine site.
  • No hydrogeological model is provided to support the activities at the Beaver Dam open pit or the Touquoy Mine site.
  • Provide justification for using the Touquoy Mine Focus Report to describe fugitive air emissions for the Beaver Dam Mine Project and potential associated health effects from activities at the Beaver Dam Mine, haul roads and Touquoy Mine; or conduct air modelling which includes all project activity sources.