Construction of a Fire Fighting Foam Retention System - 3 Wing Canadian Forces Base Bagotville

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Construction of a Fire Fighting Foam Retention System - 3 Wing Canadian Forces Base Bagotville
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2023-04-12
  • Document: 147316E.html
  • Relevance: 365.26
  • Notice of Determination April 12, 2023 The Department of National Defence has determined that the proposed ‘Construction of a Fire Fighting Foam Retention System' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous knowledge; community knowledge; comments received from the public; and technically and economically feasible mitigation ...
1 alternate format found
French HTML
  • Relevance: 314.26
  • Avis de détermination Le 12 avril 2023 Le Ministère de la Défense nationale a déterminé que le projet proposé ‘Construction d'un système de rétention de mousse à incendie' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : répercussions sur les droits des peuples autochtones; connaissances autochtones; connaissances communautaires; commentaires reçus du public; et les mesures d'atténuation ...

Document Public Comment Period on Intent to Make a Determination

  • Project Construction of a Fire Fighting Foam Retention System - 3 Wing Canadian Forces Base Bagotville
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2020-11-06
  • Document: 136657E.html
  • Relevance: 288.98
  • Public Comment Period on Intent to Make a Determination Construction of a Fire Fighting Foam Retention System – 3 Wing Canadian Forces Base Bagotville November 6, 2020 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received ...
1 alternate format found
French HTML
  • Relevance: 237.98
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Construction d'un système de rétention de mousse à incendie (3ième Escadre de la Base des Forces canadiennes de Bagotville) Le 6 novembre 2020 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le ...