Search Registry

Registry Search Mobile

Registry Search

Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. The map depicts assessments that identify at least one location. Users should consult the list to view all results that correspond to the search criteria.

Skip to Filters

126110 results

Project Morin Lake Wellbeing Centre

  • Location (Morin Lake IR #217, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90418
  • Last Modified: 2026-06-01
  • Relevance: 414.98
  • The Lac La Ronge Indian Band (LLRIB) is proposing to build a new wellbeing centre to support the community of Hall Lake, situated on Morin Lake IR #217. The project emphasizes flexible, multi-purpose spaces and culturally responsive design to serve community needs. It is planned to function as a long-term hub for wellbeing services while allowing for future growth and adaptation. The wellbeing centre will span two floors with a total area of 1,668 m², and will be able to accommodate up to ...

Project Port Haney waterfront redevelopment - Maple Ridge

  • Location (Port Haney waterfront redevelopment, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90155
  • Last Modified: 2026-06-01
  • Relevance: 414.98
  • The City of Maple Ridge proposes to build a multi-use pathway (the "Project") to connect Port Haney Wharf and Kanaka Creek Regional Park. The proposed Project is located on the upland and along the north bank shoreline of the Fraser River, and over the 227 Street Tributary (the "Site"). The Site was formerly used as a log-sorting facility and is divided between the Port Authority, Provincial, and municipal jurisdictions. Upon completion, the Project will form part of the ...

Project Wood Buffalo National Park Highway 5 rehabilitation

  • Location (Wood Buffalo National Park of Canada, Northwest Territories)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90338
  • Last Modified: 2026-06-01
  • Relevance: 414.97
  • Maintenance and road surface rehabilitation is required to restore drainage infrastructure, improve rideability and overall road safety from km 190.5 to km 211.1 on Highway 5 in Wood Buffalo National Park. The work will utilize heavy machinery along the existing highway footprint to widen the grade of the road by backfilling the side slope, add base course and sub-base course in select locations and scarify, regrade, compact and apply chipseal to the road surface. The work will also involve ...

Project Marten Falls Community Access Road Project

  • Location (Marten Falls, Ontario) (Northern end of Painter Lake forestry road, Ontario)
  • Assessment Type: Impact Assessment by the Agency
  • Status: In progress
  • Reference Number: 80184
  • Last Modified: 2026-06-01
  • Relevance: 414.97
  • Marten Falls First Nation is proposing the construction and operation, including maintenance, of an all-season multi-use community access road approximately 190 to 230 kilometres in length, connecting the northern end of Painter Lake forestry road to the community of Marten Falls. Marten Falls is located at the junction of the Albany and Ogoki rivers, approximately 170 kilometres northeast of Nakina, Ontario. As proposed, the Marten Falls Community Access Road Project could ...

Project Little Red River Wellbeing Centre

  • Location (Little Red River IR #106c, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90419
  • Last Modified: 2026-06-01
  • Relevance: 414.97
  • The Lac La Ronge Indian Band (LLRIB) is proposing to build a new wellbeing centre to support the community of Little Red River, situated on Little Red River IR #106c. The project emphasizes flexible, multi-purpose spaces and culturally responsive design to serve community needs. It is planned to function as a long-term hub for wellbeing services while allowing for future growth and adaptation. The wellbeing centre will span two floors with a total area of 1,654 m², and will be able to ...

Project Little Brother Lake Dam Replacement

  • Location (Trent-Severn Waterway National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 89579
  • Last Modified: 2026-06-01
  • Relevance: 414.97
  • The project is a complete replacement of the dam in the same location as the existing dam. The main work involves the complete demolition of the existing main dam, construction of a new dam in the same location and orientation. Other works include clearing for laydown and project staging and construction of temporary cofferdams

Project Long Lake Dam Replacement

  • Location (Trent-Severn Waterway National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 89587
  • Last Modified: 2026-06-01
  • Relevance: 414.97
  • The project is a complete replacement of the dam in the same location as the existing dam. The main work involves the complete demolition of the existing main dam, construction of a new dam in the same location and orientation. Other works include clearing for laydown and project staging and construction of temporary cofferdams. Parks Canada owns the asset but not the associated, adjacent properties. Therefore, this is not a "project" as defined under section 81 of the Impact ...

Project Samson Cree Nation Emergency Road Repairs of Flood Damaged Road and Bridge Assets

  • Location (Samson Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90433
  • Last Modified: 2026-05-31
  • Relevance: 414.81
  • Ten road locations on Samson Cree Nation sustained damage during a flood event in the spring of 2020 and these damages were further compounded by the continued, but necessary usage of water and sewer trucks to service area residents during and following the event. The objective of the project is to complete the road repairs to the road and bridge assets. Project activties inclue road and culvert upgrade construction, gravel surface maintenance, snow clearing, culvert and drainage ...

Project Women Pro-Forests: Climate Change Adaptation in the Moyen-Bafing National Park

  • Location (Developed land of the Moyen-Bafing National Park in Guinea, Outside Canada)
  • Assessment Type: Project outside of Canada
  • Status: In progress
  • Reference Number: 90427
  • Last Modified: 2026-05-30
  • Relevance: 414.7
  • This project aims to improve climate change adaptation for women, young women, and their families in the Moyen-Bafing National Park. Achieving this objective relies on the increased adoption of nature-based solutions that support biodiversity, for the benefit of women and young women. The project seeks to sustainably improve the economic opportunities of beneficiaries through nature-based, climate-smart agroforestry solutions that are respectful of forest biodiversity. It also aims to ...

Project Dene Tha' First Nation: CUR86 - Bushe River Solid Waste Transfer Station

  • Location (Bushe River, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90429
  • Last Modified: 2026-05-30
  • Relevance: 414.7
  • Dene Tha' First Nation is proposing to construct and operate a Waste Transfer Station in Bushe River to receive and sort the community's residential waste streams including large items, recyclables, residential renovation waste, tires, household hazardous materials, electronics, whitegoods, propane tanks, and derelict vehicles. The waste will be hauled from the new transfer station by Dene Tha' First Nation to third-party operated landfills. The transfer station will ...

Project Building Adaptation Project – Rideau Hall, Ottawa, ON

  • Location (Rideau Hall, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90424
  • Last Modified: 2026-05-30
  • Relevance: 414.7
  • Rideau Hall's original wing was constructed in 1838 and it was converted into the Official Residence of the Governor General of Canada in 1864. Over time, several additions and alterations have been made to both the residence and its 79 acre site to suit the evolving needs of its occupants and better reflect and Rideau Hall's identity as a national symbol. Rideau Hall is a Classified Federal Heritage building, while the complex and its landscaped grounds are designated as a National ...

Project Duncan's First Nation: CUCJ0 - Solid Waste Transfer Station

  • Location (Duncan's First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90428
  • Last Modified: 2026-05-30
  • Relevance: 414.7
  • Duncan's First Nation is proposing to construct and operate a Waste Transfer Station to receive and sort the community's residential waste streams including large items, recyclables, residential renovation waste, tires, household hazardous materials, electronics, whitegoods, propane tanks, and derelict vehicles. The waste will be hauled from the new transfer station by Duncan's First Nation to third-party operated landfills. The transfer station will have a 30-year ...

Project Sucker River Mithwayawikamik Wellbeing Center

  • Location (Sucker River 156C, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90400
  • Last Modified: 2026-05-29
  • Relevance: 414.68
  • Lac La Ronge Indian Band is proposing to construct the Sucker River Mithwayawikamik Wellbeing Centre which will offer a community-based gathering center to improve the quality of existing programs and create new programs. The Sucker River Well-Being Centre will be a new two-story community facility intended to support health, wellness, cultural programming, and administrative functions for the Sucker River community. The project involves the construction of a multi-use building, the main ...

Project Pheasant Rump Nakota First Nation Road Improvements

  • Location (Pheasant Rump Nakota First Nation, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90505
  • Last Modified: 2026-05-29
  • Relevance: 414.68
  • The Rural Municipality of Hazelwood will be expanding the grid road right-of-way through the Pheasant Rump Nakota First Nation to be able to upgrade and improve the road conditions. These improvements will increase safety for the travelling public and PRNFN members, improve the quality of life for those living, working, and enjoying the lands adjacent to the grid road, as well as contributing to the economic development and existing activities in the region. The project includes upgrading and ...

Project North Shore Hydro Distribution Line Rebuild

  • Location (Riding Mountain National Park of Canada, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 89885
  • Last Modified: 2026-05-29
  • Relevance: 414.67
  • Manitoba Hydro is proposing to install a 6 km single phase 12.47kV underground distribution line to replace the existing overhead distribution line. The project also involves the conversion of 800 metres of three-phased overhead to a single-phase line. Approximately 3 km of underground cable will be installed via horizontal directional drilling and approximately 3 km of underground cable will be installed via trenching. The existing 4.2 km overhead line will be removed and salvaged, and the ...

Project Rideau Canal Wall Repairs

  • Location (Rideau Canal National Historic Site, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90504
  • Last Modified: 2026-05-29
  • Relevance: 414.66
  • This project involves rehabilitation of a section of vertical concrete retaining wall that is part of the Rideau Canal National Historic Site. The site is owned and operated by the Ontario Waterways Unit of the Parks Canada Agency. The project includes the rehabilitation of approximately 100 meters of the east canal wall section located along Colonel By Drive near Clegg Street, in Ottawa, Ontario. The proposed repairs would return the wall section to a "good condition" and includes ...

Project Royal Military College Concrete Pad Construction - Royal Military College of Canada Kingston

  • Location (Royal Military College of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 89841
  • Last Modified: 2026-05-29
  • Relevance: 414.66
  • The Department of National Defence (DND) is proposing a project. The proposed project is to build a concrete pad for the purpose of creating an outdoor workout area to be used by Royal Military College (RMC) students. The size of the concrete pad will be 80 feet x 50 feet. The project construction is projected to last up to 2 weeks with multi-year usage and minimal maintenance of the concrete pad required. Sea cans will be placed on the pad for storage of gym equipment.

Project The Lower Cove Loop Combined Sewer Rehabilitation Project Phase 1

  • Location (Saint John, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90503
  • Last Modified: 2026-05-29
  • Relevance: 414.66
  • The Lower Cove Loop Combined Sewer Rehabilitation Project Phase 1 consists of replacement and installation of combined and storm sewer infrastructure in the Lower Cove area of Saint John, New Brunswick. The project is intended to improve the condition and performance of existing combined sewer infrastructure in the Lower Cove area. The work generally includes installation of new sewer piping, storm sewer connections, precast manhole structures, modifications at CSO Chamber ...

Project Ontario Pumped Storage Hydropower Project

  • Location (5 km north of Meaford, Ontario)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 89803
  • Last Modified: 2026-05-29
  • Relevance: 414.66
  • TC Energy is proposing to construct and operate a pumped storage hydropower facility located at the Department of National Defence's 4th Canadian Division Training Centre near Meaford, Ontario, on Nottawasaga Bay. As proposed, the project would store excess electricity from the grid by moving water from the bay to a reservoir, that would then be released back to the bay to generate electricity during periods of demand. It will have a production capacity of 1000 megawatts and will operate ...

Project Construction of Outdoor Mini Putt Course at the Edmonton Garrison Memorial & Curling Club

  • Location (Edmonton Garrison, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90502
  • Last Modified: 2026-05-29
  • Relevance: 414.64
  • The Department of National Defence (DND) is proposing the construction of an 18-hole prefabricated modular miniature golf system including lighting, fencing, and military monuments on Edmonton Garrison Memorial & Curling Club property located east of the parking lot.

Project Bigstone Cree Nation: P057828 - Maskotehk Flood Mitigation Upgrades at Cattleman Drive & Cee Too Drive

  • Location (Wabasca IR 166D, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90421
  • Last Modified: 2026-05-29
  • Relevance: 414.59
  • Bigstone Cree Nation proposes the replacement of a watercourse crossing over an unnamed creek in Wabasca IR No. 166D to increase capacity and amelierate flooding issues. Construction will include isolation of the crossing location, installation of a temporary bypass crossing, removal of the existing corssing, installation of a new crossing, removal of the temporary bypass route, and commissioning of the new watercourse crossing.

Project Fraser River Navigation Channel Maintenance Dredging

  • Location (Fraser River Navigation Channel Maintenance Dredging, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90258
  • Last Modified: 2026-05-28
  • Relevance: 414.57
  • The proposed project comprises annual maintenance dredging of the deep-sea shipping channel in the lower reaches of the Fraser River, from Sand Heads (kilometre marker -1.5) to Annieville Channel (kilometre marker 35). The dredging will also include access to deep-sea terminals in the Fraser River. An estimated volume of up to 4.8 million cubic meters will be removed annually over a five-year period. Dredging will be conducted using a Trailer Suction Hopper Dredge, Cutter Suction Dredge, ...

Project Sewer Separation at NRC Montreal Road Campus

  • Location (National Research Council of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90501
  • Last Modified: 2026-05-28
  • Relevance: 414.56
  • The National Research Council of Canada (NRC) is proposing to separate the sanitary sewer from the storm sewer between Building M16 and M9 at the NRC Montreal Road Campus, Ottawa, Ontario. The project will include site preparation, excavation, infrastructure installation and site restoration. Access to Marrion Street will be closed during the construction.

Project Annapolis Royal Living Shoreline

  • Location (Fort Anne National Historic Site of Canada, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90500
  • Last Modified: 2026-05-28
  • Relevance: 414.55
  • The Annapolis Royal Living Shoreline Project is a coastal restoration initiative that will restore a salt marsh degraded by long-term development along the Annapolis Royal waterfront, using a living shoreline approach to strengthen shoreline resilience and intertidal ecosystems. The restored salt marsh will reduce erosion and wave energy, helping stabilize the shoreline and support future climate adaptation. It will also enhance habitat for invertebrates, fish, and birds. The existing marsh ...

Project Repair of the Lady-Aberdeen Bridge, Gatineau

  • Location (Lady Aberdeen Bridge, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90499
  • Last Modified: 2026-05-28
  • Relevance: 414.55
  • As part of the rehabilitation of the Lady Aberdeen Bridge in Gatineau, the Ministry of Transport and Sustainable Mobility (MTMD) plans to carry out the following activities, some of which will take place on federal land owned by the NCC: • Resurfacing of the roadway at the bridge approaches; • Replacement of guardrails at the approaches; • Construction and removal of a temporary detour route between the lanes of Fournier Boulevard; • Installation and removal of a ...

Project Berens River Emergency Temporary School

  • Location (Berens River First Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90498
  • Last Modified: 2026-05-28
  • Relevance: 414.54
  • Due to the total loss of the community school by fire, an emergency, temporary school is required for the 400 students of Berens River School. The temporary school will be made up of a combination of RTM buildings combined with site built structures. The temporary school shall meet the needs of these students for the next 3-4 years, while a new, permanent school is being built. The site, selected by BRFN, is close to existing municipal infrastructure, on a site that had ...

Project Big River First Nation Drainage Reestablishment Phase 1B

  • Location (BIG RIVER INDIAN RESERVE NO. 118, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90137
  • Last Modified: 2026-05-28
  • Relevance: 414.54
  • Big River First Nation is proposing to replace existing culvert crossings at eight locations in the community which are frequently subject to washouts and flooding. The work to be completed at each location will include upgrades to road structure, ditching, and drainage. Site preparation activities will include clearing and grubbing of vegetation, and stripping of topsoil within roadway ditches and drainage channels. Construction activities will include installation/replacement of culverts, ...

Project Thunderchild First Nation Firehall

  • Location (Thunderchild First Nation Indian Reserve No. 115B, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90407
  • Last Modified: 2026-05-28
  • Relevance: 414.53
  • The Thunderchild First Nation is proposing construction of a new fire hall building to support emergency response and fire protection services for the Nation. The project will include a multi-bay fire hall, concrete apparatus aprons, a truck turnaround pad to accommodate emergency vehicles, and a small parking lot for staff and visitors. Other required infrastructure includes fuel tanks, connections to sewer and water service, and connections to power, natural gas, and communication lines. The ...

Project Northlands Denesuline FN Soil Remediation and Landfarm Upgrade - Site 1 (Former Petit Casimir Memorial School Tank Farm - FCSI # 5697) and Site 2 (Northlands Former Federal School - FCSI 5310001)

  • Location (Soil Remediation and Landfarm Upgrade - Site 1 (Former Petit Casimir Memorial School Tank Farm - FCSI # 5697), Manitoba) (Soil Remediation and Landfarm Upgrade - Site 2 (Northlands Former Federal School - FCSI 5310001), Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90497
  • Last Modified: 2026-05-28
  • Relevance: 414.53
  • Project proponent: Northlands Denesuline First Nation (NDFN) Project title: Northlands Denesuline FN Soil Remediation and Landfarm Upgrade - Site 1 (Former Petit Casimir Memorial School Tank Farm - FCSI # 5697) and Site 2 (Northlands Former Federal School - FCSI 5310001) Project location: Northlands Denesuline First Nation Description: Project is made up of #2 sites: Site 1 (Former Petit Casimir Memorial School Tank Farm - FCSI # 5697) and Site 2 (Northlands Former Federal ...

Project Pretty Channel Dams Stabilization

  • Location (Trent-Severn Waterway National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90413
  • Last Modified: 2026-05-28
  • Relevance: 414.48
  • The project involves stabilizing the current dam by installing post tensioned anchors on the spillway and placing rockfill on the downstream side of the Main Dam right abutment and the Side Dam. The rockfill will be ferried to the work site where an excavator will place it directly on the abutments. The post-tensioned anchors will be installed from the existing operating deck of the dam. The sectional barge will be outfitted with offboard spuds which anchors the barge to the lakebed. After the ...

Project North Cargo Hardstands

  • Location (Toronto Pearson International Airport, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90411
  • Last Modified: 2026-05-28
  • Relevance: 414.48
  • Proposed Project: North Cargo Hardstands  The North Cargo Hardstands Project forms part of the National Trade Corridors Fund (NTCF) funding agreement between the Greater Toronto Airports Authority (GTAA) and Transport Canada. The primary objective of this initiative is to enhance air cargo capacity at Toronto Pearson International Airport.  The proposed development will be located airside near the east end of Runway 05-23, southwest of the intersection of ...

Project North Hardstands Phase 1

  • Location (Toronto Pearson International Airport, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90410
  • Last Modified: 2026-05-28
  • Relevance: 414.48
  • Proposed Project: North Hardstands Phase 1 As part of the Greater Toronto Airports Authority's (GTAA's) Toronto Pearson Airport Longterm Investment in Facilities & Terminals (LIFT) Program, the North Hardstand and associated infrastructure are proposed to be constructed on the Airfield. The proposed development will be located airside near the east end of Runway 05-23, southwest of the intersection of Airport Road and Derry Road, on previously developed land with the function ...

Project Temporary Laydown and Logistics Area

  • Location (Toronto Pearson International Airport, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90415
  • Last Modified: 2026-05-28
  • Relevance: 414.48
  • The Proposed Project: Laydown and Logistics areas  As part of the Greater Toronto Airports Authority's (GTAA's) Toronto Pearson Airport Longterm Investment in Facilities & Terminals (LIFT) Program, logistics and laydown areas will be constructed on Airport Lands, to facilitate construction needs. These sites will be developed on unmaintained vegetated areas located both airside and ...

Project Uniting Towards Gender Equality for the Total Health and Rights of Women and Girls (TOGETHER)

  • Location (Achumae village, Outside Canada) (Ekaburu village, Outside Canada) (Lorus village, Outside Canada)
  • Assessment Type: Project outside of Canada
  • Status: In progress
  • Reference Number: 90496
  • Last Modified: 2026-05-27
  • Relevance: 414.43
  • This project aims to improve access to health rights for the most vulnerable children, adolescent girls, and women in Kenya. The main objective of this initiative is to contribute to the overall goals of the TOGETHER project, which are to improve the health, nutrition, and hygiene of vulnerable populations, particularly women, adolescent girls, and children under five. ADRA Kenya plans to drill three wells in the following locations in Turkana County: 1) the village of Achumae in West Turkana ...

Project Mînî Thnî Lift Station Project

  • Location (Mînî Thnî, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90360
  • Last Modified: 2026-05-26
  • Relevance: 414.35
  • Stoney Nakoda Nation is proposing to construct a lift station to service the community of Mînî Thnî. The lift station will be located adjacent to the Elders Lodge. The proposed project will include the construction of a control building, a lift station, an equalization chamber, an access road, and fencing around the site. The new lift station will be tied into the North Mînî Thnî Water and Wastewater Linear Infrastructure Project. Proposed project activities ...

Project Stoney North MÎnÎ ThnÎ Reservoir and Pump Station

  • Location (MÎnÎ ThnÎ, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 89147
  • Last Modified: 2026-05-26
  • Relevance: 414.35
  • Stoney Tribal Administration plans to construct a reservoir and pump station in MÎnÎ ThnÎ. The proposed reservoir and pump station will be located just north of highway 1A and adjacent to the North MÎnÎ ThnÎ residences. Project activities include clearing of vegetation, excavation, fill, restoration, and construction of a new pumphouse building.

Project Siksika Police Headquarters Project

  • Location (Siksika Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90000
  • Last Modified: 2026-05-26
  • Relevance: 414.35
  • Siksika Nation is proposing to construct a police headquarters building on Siksika Reserve Lands. The proposed police headquarters will be located next to the existing Siksika Nation Fire and EMS building. The project will be comprised of a 2274m2 building along with a parking lot, an access road, lighting, utility lines, and fencing. The total project area will be 9804m2. Proposed project activities include clearing, excavation, filling, compaction, grading, trenching, building construction, ...

Project McDonald's at Buffalo Run

  • Location (Tsuut'ina Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90294
  • Last Modified: 2026-05-26
  • Relevance: 414.35
  • McDonald's is proposing to construct a restaurant on Tsuut'ina Nation. The proposed project will be located at Buffalo Run, across the road from the Tim Hortons, on a pre-graded site. The project includes the construction of a 376 m² single-story restaurant with a drive-through and a 20-stall parking lot. Project activities include excavating footings and the foundation for the slab-on-grade building, backfilling any excavations, and completing hardscape and softscape finishes. ...

Project Maintenance of the dams at Lac à la Pêche and Lac Wapizagonke, La Clairière area

  • Location (La Mauricie National Park of Canada, Quebec) (La Mauricie National Park of Canada, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90495
  • Last Modified: 2026-05-26
  • Relevance: 414.33
  • The dams at Lac à la Pêche and Lac Wapizagonke (La Clairière sector) require maintenance to ensure their safety and extend their service life. The work includes repairing the caissons and wooden abutments, stabilizing the riprap downstream of the dams and at the shore supports, and controlling vegetation adjacent to and above the abutments and supports. The work is scheduled for mid-July through September, the period with the lowest risk of impact on fish.

Project Installation of a Permeable Adsorptive Barrier (PAB) at 22 Wing North Bay

  • Location (22 Wing North Bay, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90412
  • Last Modified: 2026-05-26
  • Relevance: 414.33
  • The Department of National Defence (DND) is proposing a project. DND is proposing to install a 250 m long in-situ permeable adsorptive barrier (PAB) to remediate groundwater impacted by per- and polyfluoroalkyl substances (PFAS) within the bedrock valley at 22 Wing North Bay. Pilot-scale testing will be conducted to evaluate the performance of colloidal activated carbon (CAC) products followed by full-scale implementation and long-term monitoring. Project activities will ...

Project Aurora at Taza Park Multi-Unit Townhome Development - Parcel 11

  • Location (Tsuut'ina Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90275
  • Last Modified: 2026-05-26
  • Relevance: 414.32
  • Homes by Avi is proposing to construct a second multi-unit townhome development at Taza Park on Tsuut'ina Nation reserve lands adjacent to the existing Homes by Avi townhome development. The project will comprise of 12 buildings containing 46 units to be constructed on previously developed Land. No clearing will be required as the rowhouse lots were already serviced during the Taza Development Project. The project will involve re-grading of the site. Indigenous Services Canada will be ...

Project Lielvarde Air Base – Earth Covered Magazines (ECM) construction

  • Location (Lielvarde Airbase, Latvia, Outside Canada)
  • Assessment Type: Project outside of Canada
  • Status: Completed
  • Reference Number: 90278
  • Last Modified: 2026-05-26
  • Relevance: 414.31
  • The Department of National Defence (DND) has proposed a project. This project is to construct 7 Earth Covered Magazines (ECM) at the Lielvarde Air Base in Latvia. ECM are specialized, heavily reinforced concrete bunkers buried under earth mounds, to safely store ammunition and explosives. There are approximately ~190 m2 each in surface area. The construction of these is set to occur on developed and serviced land managed and operated by the Canadian Armed Forces (CAF).

Project New Davit Wharf Construction – Canadian Coast Guard Academy

  • Location (Canadian Coast Guard Academy, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90494
  • Last Modified: 2026-05-26
  • Relevance: 414.3
  • Canadian Coast Guard Academy (formerly Canadian Coast Guard College) intends to construct a new davit wharf structure. The new wharf will be of pile construction with a concrete deck measuring approximately 18.30 m (north–south length) × 12.20 m (east–west length). The top of deck is +3.60 m, with the underside of pile cap at +2.55 m. The foundation comprises 18 steel pipe piles Ø610 mm × 12.7 mm wall, (footprint of ~5.3 m2) socketed into bedrock to EL ...

Project Caldwell First Nation Phase 2 Subdivision Expansion

  • Location (Caldwell First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90493
  • Last Modified: 2026-05-25
  • Relevance: 414.25
  • The community of Caldwell First Nation is located 350 kilometers Southwest of Toronto just outside of the Town of Leamington. This project will provide roads and services that will be used for 27 future homes by the Caldwell First Nation community including 6 homes scheduled for construction before December 2026 under CMHC's Section 95 program. At total of 25,310m2 (subdivision expansion) and 20,944m2 (SWM pond expansion) will be developed. 

Project New private residential dock – 315 Sasamat Lane

  • Location (New private residential dock - 315 Sasamat Lane, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90492
  • Last Modified: 2026-05-25
  • Relevance: 414.24
  • The upland owners at 315 Sasamat Lane are proposing to install a new private residential dock in North Vancouver BC. The proposed works include the construction of a platform that is supported by a concrete abutment and anchored to the existing rock above on the land side and the installation of an access ramp and mooring float. The ramp and float will be constructed off-site and then placed and secured in the proposed dock location.  The ramp is a prefabricated aluminum frame with ...

Project Hopkins Slipway Extension – Canadian Coast Guard Academy

  • Location (Canadian Coast Guard Academy, Nova Scotia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90491
  • Last Modified: 2026-05-25
  • Relevance: 414.22
  • The Canadian Coast Guard Academy (formerly Canadian Coast Guard College) intends to extend the existing slipway with five (5) pre-cast concrete launching ramp slabs, footprint of 45 m2. Each slab is 200 mm thick with reinforcing steel (15M at 300 mm each way) and 75 mm concrete cover. Adjoining slabs use continuous keyways for alignment and load transfer. The slipway is 6.0 m wide in section and the panels include 100 × 200 mm access holes plus 38 mm × 1000 mm steel lifting bars to ...

Project Small craft dock stormwater line replacement – Pacific Coast Terminal

  • Location (Small craft dock stormwater line replacement - Pacific Coast Terminal, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90490
  • Last Modified: 2026-05-25
  • Relevance: 414.22
  • The proposal is to replace approximately 50 meters of an existing corrugated steel storm water pipe that crosses the terminal, and to expand the catchment area. The line picks up water from a culvert just outside of PCT's site, and discharges the into the ocean, next to the "small craft dock". An investigation conducted over the course of 2024 and 2025 revealed that the pipe is significantly compromised and requires replacement. In addition, there is a need for improved storm ...

Project Methanol tug loading - Univar

  • Location (Methanol tug loading, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90489
  • Last Modified: 2026-05-25
  • Relevance: 414.21
  • The Applicant is proposing to install rail and truck unloading equipment, a new storage tank in the existing containment area, piping, and a new float in the waterlot. This would allow the facility to receive this fuel by train or truck, and load specially equipped vessels with methanol as a marine fuel. The customer for this project is Kotug Canada, which offers escort tug services in the region. Methanol allows the vessels to operate on an alternative fuel which offers lower air emissions ...

Project Waterhen Lake First Nation Solid Waste Transfer Station

  • Location (WATERHEN LAKE INDIAN RESERVE NO. 130, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90488
  • Last Modified: 2026-05-25
  • Relevance: 414.21
  • Waterhen Lake First Nation is proposing to construct a new solid waste transfer station approximately 2 km east of the core community, along 'Old Sawmill Road' which is the same road leading to the existing landfill, which is planned to be closed and decommissioned in the coming years. The proposed location of the transfer station consists mostly of cleared land due to former logging and sawmill operations. The size of the site is estimated to be 140 m x 65m with the ability to expand ...

Project Power System Replacement at Sand Hill River Counting Facility, Labrador

  • Location (Sand Hill River Counting Facility, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90482
  • Last Modified: 2026-05-25
  • Relevance: 414.21
  • The proposed project at the Sand Hill River Counting Facility includes: the removal, relocation, and replacement of the electrical building; upgrades to the existing electrical systems; and the extension of the existing raised wooden walkway to facilitate access to the new electrical building. The new walkway will be installed on concrete blocks and raised above the ground with wood posts. The old electrical building will be demolished and removed. All materials will be disposed of at an ...

Last ModifiedDisplay Filters

Filters

Authorities Display Filters

Date modified: