Environmental Impact Statement
Appendices
- Appendix 2-A – MMER Schedule 2 Amendment Application (PDF – 138 KB)
- Appendix 2-B – International Rivers Improvements Act Licence Application (PDF – 13 MB)
- Appendix 2-C – Explosives Permit Application (PDF – 4 MB)
- Appendix 3-A – Initial KSM Project Brochure (2008) (PDF – 993 KB)
- Appendix 3-B – KSM Project Factsheets (2010-2012) (PDF – 3 MB)
- Appendix 3-C – KSM Project Posters (2010-2012) (PDF – 36 MB)
- Appendix 3-D – KSM Project Economics Infographic (2012) (PDF – 1 MB)
- Appendix 3-E – Careers in Mining Infosheets (2011-2012) (PDF – 17 MB)
- Appendix 3-F – Summer 2010 KSM Project Open House PowerPoint Presentation and Notification (PDF – 3 MB)
- Appendix 3-G – 2011 KSM Project Advertorials, Meeting Notices, and Newspaper Articles (PDF – 4 MB)
- Appendix 3-H – 2012 KSM Project Advertorials, Meeting Notices, and Newspaper Articles (PDF – 13 MB)
- Appendix 3-I – Feedback Forms (PDF – 1 MB)
- Appendix 3-J – Summary of Communications with Nisga'a Nation (PDF – 103 KB)
- Appendix 3-K – Nisga'a Nation Issues and Responses (PDF – 201 KB)
- Appendix 3-L – Proposed Issues and Responses Tracking Table for Application/EIS Review (PDF – 67 KB)
- Appendix 3-M – Summary of Communications with First Nations (PDF – 104 KB)
- Appendix 3-N – First Nations Issues and Responses (PDF – 3387 KB)
- Appendix 3-O – Tahltan Community Meetings Outreach Materials (PDF – 32 MB)
- Appendix 3-P – Summary of Communications with Government Agencies and Local Governments (PDF – 145 KB)
- Appendix 3-Q – Government Agencies and Local Government Issues and Responses (PDF – 226 KB)
- Appendix 3-R – Summary of Communications with the Public and Stakeholders (PDF – 100 KB)
- Appendix 3-S – Public and Stakeholder Issues and Responses (PDF – 158 KB)
- Appendix 4-A – Summary of KSM Project Areas, Major Project Components, Phase, and Reclamation (PDF – 125 KB)
- Appendix 4-AA – 5 year Increment PTMA Water Management Plans (PDF – 49 KB)
- Appendix 4-AB – 2012 Tailings Management Facility (PDF – 16 MB)
- Appendix 4-AC - 2012 Engineering Design Update of Tailing Management Facility (PDF - 172 MB)
- Appendix 4-AD - Tailings Management Facility Access Roads Plans/Profiles, Mass Diagrams, Cross Sections (PDF - 63 MB)
- Appendix 4-AE - North Treaty Valley Access Roads Plans/Profiles, Mass Diagrams, Cross Sections, Typical Sections (PDF - 59 MB)
- Appendix 4-AF - Treaty Creek Access Road Plans/Profiles, Mass Diagrams, Cross Sections, Typical Section (PDF - 76 MB)
- Appendix 4-AG - Coulter Creek Access Road Plans/Profiles, Mass Diagrams, Cross Sections, Typical Sections (PDF - 89 MB)
- Appendix 4-AH - General Arrangements - Routes, Bridges, Major Culverts (PDF - 10 MB)
- Appendix 4-AI - Evaluation of Alternate Glacier Access Routes, KSM Project 2012 (PDF - 16 MB)
- Appendix 4-AJ - KSM Project 287 Kilovolt Treaty Creek Transmission Line (PDF - 19 MB)
- Appendix 4-AK - Treaty Creek Transmission Line Geotechnical Assessment (PDF - 77 MB)
- Appendix 4-B – KSM Property Claims Information (PDF – 111 KB)
- Appendix 4-C - Kerr-Sulphurets-Mitchell Prefeasibility Study (PDF - 85 MB)
- Appendix 4-CA - Certificates of Qualified Persons (PDF - 189 KB)
- Appendix 4-CB - Smelting and Refining Terms (PDF - 225 KB)
- Appendix 4-CC1 - Process Flowsheet Diagrams (PDF - 5 MB)
- Appendix 4-CC2 - Layouts (PDF - 26 MB)
- Appendix 4-CC3 - Equipment List (PDF - 400 KB)
- Appendix 4-CD1 - PRocess Design Criteria (PDF - 135 KB)
- Appendix 4-CD2 - Testwork Reports (PDF - 9 MB)
- Appendix 4-CE1 - Open Pit - Design Basis Memorandum (PDF - 2 MB)
- Appendix 4-CE2 - Open Pit - End of Period Maps (PDF - 42 MB)
- Appendix 4-CE3 - Open Pit - Pioneering and Pre-production (7 MB)
- Appendix 4-CE4 - Open Pit - Mine Equipment (PDF - 523 KB)
- Appendix 4-CE5 - Open Pit - Resource Reports (PDF - 330 KB)
- Appendix 4-CE6 - Open Pit - Drilling and Blasting (PDF - 2 MB)
- Appendix 4-CE7 - Open Pit - Mine Maintenance Facility (PDF - 2 MB)
- Appendix 4-CE8 - Open Pit - Loss and Dilution (PDF - 476 KB)
- Appendix 4-CE9 - Open Pit- Till Excavation and Storage (PDF - 1 MB)
- Appendix 4-CE10 - Open Pit - Weather Studies (PDF - 347 KB)
- Appendix 4-CE11 - Open Pit - Rock Storage Facility Reclamation Criteria (PDF - 92 KB)
- Appendix 4-CE12 - Open Pit - Maximum Minimum Temperature System Cost Model (PDF - 1 MB)
- Appendix 4-CE13.1 - Underground - Prefeasibility Block Cave Mine Design - Mitchell Deposit (PDF - 54 KB)
- Appendix 4-CE13.2 - Report on Prefeasibility Block Cave Mine Design - Mitchell Deposit (PDF - 12 MB)
- Appendix 4-CE14.1 - Underground - Prefeasibility Block Cave Mine Design - Iron Cap Deposit (PDF - 54 KB)
- Appendix 4-CE14.2 - Report on Prefeasibility Block Cave Mine Design - Iron Cap Deposit (PDF - 9 MB)
- Appendix 4-CF1 - Mitchell Zoine Open Pit Slope Design (PDF - 217 MB)
- Appendix 4-CF2 - Mitchell Pit Slope Parameter Addendum and Confirmation (PDF - 8 MB)
- Appendix 4-CF3 - Sulphurets Zone Open Pit Slope Design (PDF - 112 MB)
- Appendix 4-CF4 - Kerr Zone Open Pit Slope Design (PDF - 102 MB)
- Appendix 4-CF5 - Open Pit Depressurization Analyses (PDF - 35 MB)
- Appendix 4-CF6 - KSM Transmission Line: Preliminary Geotechnical Review (PDF - 41 MB)
- Appendix 4-CF7 - Mitchell Ore Preparation Complex Geohazards Risk Reduction (PDF - 2 MB)
- Appendix 4-CF8 - Capital Costs for Avalanche Management (PDF - 187 KB)
- Appendix 4-CF9 - KSM Geohazard and Risk Assessment - Mine Site and Coulter Creek Access (PDF - 153 MB)
- Appendix 4-CF10 - Geohazard and Risk Assessment - Tailings Management Facility, Treaty Creek and Teigen Creek Access (PDF - 140 MB)
- Appendix 4-CF11 - KSM Open Pit Design Review (PDF - 8 MB)
- Appendix 4-CF12 - KSM Open Pit Depressurization (PDF - 20 MB)
- Appendix 4-CG1 - Construction Schedule (PDF - 3 MB)
- Appendix 4-CG2 - Logistics (PDF - 2 MB)
- Appendix 4-CH1 - 2008 Site Investigation Report (PDF - 202 MB)
- Appendix 4-CH2 - 2009 Site Investigation Report (PDF - 83 MB)
- Appendix 4-CH3 - 2011 Update of Geotechnical Assessment of KSM Tunnel Routes (PDF- 99 MB)
- Appendix 4-CH4 - KSM Project Area Structural Geology Assessment - Final Report (PDF - 52 MB)
- Appendix 4-CH5 - 2010 Site Investigation Report (PDF - 224 MB)
- Appendix 4-CH6 - 2011 Site Investigation Report for the Mine Area (PDF - 64 MB)
- Appendix 4-CH7 - 2011 Site Investigation Report for the Tailing Management Facility (PDF - 53 MB)
- Appendix 4-CH8 - 2012 Engineering Design Update of Tailing Management Facility (PDF - 327 MB)
- Appendix 4-CH9 - 2012 Design of Rock Storage Facilities and Water Management (PDF - 403 MB)
- Appendix 4-CH10 - Drawings - Geotechnical Assessment of KSM Tunnel Routes (PDF - 47 MB)
- Appendix 4-CH11 - Drawings - KSM Project Area Structural Geology Assessment (PDF - 19 MB)
- Appendix 4-CH12 - Drawings - 2011 Site Investigation Report - Mine Area (PDF - 57 MB)
- Appendix 4-CH13 - Drawings - 2011 Site Investigation Report - Tailing Management Facility (PDF - 65 MB)
- Appendix 4-CH14 - Drawings - Tunnelling (PDF - 4 MB)
- Appendix 4-CI - Electrical Power Supply (PDF - 12 MB)
- Appendix 4-CJ1 - Permanent and Temporary Access Roads (PDF - 16 MB)
- Appendix 4-CJ2 - Roas Access Pre-Feasibility Study 2012 (PDFMB)
- Appendix 4-CK1 - Capital and Operating Costs (PDF - 3 MB)
- Appendix 4-CK2- Operating Cost Estimate (PDF - 248 KB)
- Appendix 4-CL - Financial Analysis (PDF - 470 KB)
- Appendix 4-CM - KSM Property Claims Information (PDF - 60 KB)
- Appendix 4-D – KSM Mine Plan (PDF – 4 MB)
- Appendix 4-E – Mitchell Pit Landslide Generated Wave Modelling (PDF – 5 MB)
- Appendix 4-F – Preliminary Interpretation of the Basal Surface of the Snowfield Landslide (PDF – 281 KB)
- Appendix 4-G – Snowfield Landslisde Site Investigation Summary (PDF – 48 MB)
- Appendix 4-H – Preliminary Snowfield Landslide Management Plan (PDF – 34 MB)
- Appendix 4-I – Mitchell Deposit Geotechnical Characterization (PDF – 11 MB)
- Appendix 4-J – 2012 Geotechnical Design of Rock Storage Facilities and Design of Associated Water Management Facilities (PDF – 256 MB)
- Appendix 4-K – Preliminary Assessment of Open Pit Slope Instability Due to the Mitchell Block Cave (PDF – 13 MB)
- Appendix 4-L – Iron Cap Deposit Geotechnical Characterization (PDF – 8 MB)
- Appendix 4-M – Rock Storage Facilities Design Report (PDF – 45 MB)
- Appendix 4-N – 5 Year Increment Mine Area Water Management Plans (PDF – 90 MB)
- Appendix 4-O – KSM 2011 Memo on Mitchell Glacier Sub-Glacial Drainage Patterns (PDF – 942 KB)
- Appendix 4-P – Temporary Water Treatment Plants for KSM Construction Period (PDF – 87 MB)
- Appendix 4-Q – 2012 Site Investigation Report for the Mine Area (PDF – 115 MB)
- Appendix 4-R – KSM High Density Sludge Water Treatment Plant Feasability Report (PDF – 15 MB)
- Appendix 4-S – KSM Project HDS Pilot Plant (PDF – 6 MB)
- Appendix 4-T – HDS Water Treatment Plant Design and Cost Update for Increased Capacity (PDF – 6 MB)
- Appendix 4-U – KSM Water Treatment Plant Proposed Layout and Costs for Sludge Disposal Facility (PDF – 2 MB)
- Appendix 4-V – Laboratory Investigation of Hexavalent Selenium Removal from Kerr Waste Rock Leachate Watert (PDF – 752 KB)
- Appendix 4-W – Active Avalanche Management Plan for the KSM Project (PDF – 4 MB)
- Appendix 4-X – Water Well Access Plans/Profiles, Mass Diagrams, Cross Sections (PDF – 7 MB)
- Appendix 4-Y – Cyanide Detoxification of Seabridge Gold Plant Wash Water (PDF – 4 MB)
- Appendix 4-Z - KSM Process Flow Diagrams and Mass Balance Figures (PDF - 12 MB)
- Appendix 6-A – Greenhouse Gas Emissions Scoping Table (PDF - 142 KB)
- Appendix 7-A – Air Dispersion Detailed Model Plan 2012 Addendum (PDF – 30 MB)
- Appendix 7-B – 2008 to 2011 Meteorology Baseline Report (PDF – 7 MB)
- Appendix 7-C – 2008 to 2011 Air Quality Baseline Report (PDF – 7 MB)
- Appendix 7-D – Air Quality Scoping Table (PDF – 160 KB)
- Appendix 8-A – 2009 Soils and Terrain Baseline Report (PDF – 538 MB)
- Appendix 8-B – 2011 Terrain Maps within the KSM Project LSA (PDF – 46 MB)
- Appendix 8-C – 2011 Soil Maps within the KSM Project LSA (PDF – 50 MB)
- Appendix 8-D – Terrain, Surficial Geology, and Soils Scoping Table (PDF – 91 KB)
- Appendix 9-A – Geohazard and Risk Assessment, Minesite and Coulter Creek Access (PDF – 149 MB)
- Appendix 9-B – KSM Project Geohazard Risk Reduction Summary: Rev B (PDF – 398 KB)
- Appendix 9-C – KSM Geohazards: OPC Pre-feasibility Geohazards Risk Reduction: Rev C (PDF – 1 MB)
- Appendix 9-D – KSM Project Geohazard Risk Assessment of Updated Facility Locations (PDF – 41 MB)
- Appendix 9-E – KSM Project Geohazard and Risk Assessment, Tailings Management Facility, Treaty Creek and Teigen Creek Access: Rev C (PDF – 137 MB)
- Appendix 9-F – KSM Project Terrain Stability Field Assessment of the Proposed Coulter Creek, Teigen Creek and Tunnel Spur Access Roads (PDF – 28 MB)
- Appendix 9-G – KSM Project Terrain Stability Field Assessment of the Proposed Treaty Creek, North Treaty and Tunnel Adit Access Roads (PDF – 36 MB)
- Appendix 9-H – Preliminary Geotechnical Assessment of the Snowfield Landslide (PDF – 5 MB)
- Appendix 9-I – Geohazards Scoping Table (PDF – 126 KB)
- Appendix 10-A – 2008 to 2012 Cumulative Geochemistry Baseline Report (PDF – 57 MB)
- Appendix 10-B – Access Roads Metal Leaching and Acid Rock Drainage Potential Assessment (PDF – 15 MB)
- Appendix 10-C - 2012 to 2013 Geochemistry Baseline Updates (PDF - 15 MB)
- Appendix 11-A – 2008 Hydrogeology Baseline Report (PDF – 11 MB)
- Appendix 11-B – 2009 to 2010 Hydrogeology Baseline Report (PDF – 59 MB)
- Appendix 11-C – 2012 Hydrogeology Baseline Data Report (PDF – 3 MB)
- Appendix 11-D – Hydrogeology Modelling Report, October 2010 (PDF – 75 MB)
- Appendix 11-E – Updated Hydrogeology Modelling Report, February 2013 (PDF – 16 MB)
- Appendix 11-F – Water Storage Facility Seepage Mitigation Modelling (PDF – 22 MB)
- Appendix 11-G – MMTS Hydrogeological Modelling Assessment (PDF – 29 MB)
- Appendix 11-H – Groundwater Quantity Scoping Table (PDF – 152 KB)
- Appendix 11-I - 2010 Open Pit Depressurization Analyses (PDF - 21 KB)
- Appendix 12-A – Groundwater Quality Scoping Table (PDF – 154 KB)
- Appendix 13-A – Surface Water Hydrology Assessment Report (PDF – 187 MB)
- Appendix 13-B – KSM UBC Watershed Modelling (PDF – 22 MB)
- Appendix 13-C – 2011 Glacier Monitoring Summary Report (PDF – 35 MB)
- Appendix 13-D – Surface Water Quantity Scoping Tables (PDF – 128 KB)
- Appendix 14-A – 2007-2011 Water Quality Baseline (PDF – 25 MB)
- Appendix 14-B – Stream Water Quality Data, KSM Project, 2012 (PDF – 537 KB)
- Appendix 14-C – Lake Water Quality Data, KSM Project, 2012 (PDF – 86 KB)
- Appendix 14-D – Baseline and Pilot Water Treatment Plant Toxicity Testing (PDF – 14 MB)
- Appendix 14-E – Surface Water Quality Scoping Table (PDF – 130 KB)
- Appendix 14-F – Mine Site Water Model Report (PDF – 19 MB)
- Appendix 14-G – Processing and Tailing Management Area Water Model Report (PDF – 47 MB)
- Appendix 14-H - Water Quality Model Results (PDF – 3 MB)
- Appendix 14-I – Mine Site Water Treatment Plant Staged Discharge Schedule (PDF – 93 KB)
- Appendix 15-A – 2008 Baseline Study Report: Chapter 10 – Fisheries (PDF – 211 MB)
- Appendix 15-B – 2008 Baseline Study Report: Chapter 9 – Aquatic Ecology (PDF – 14 MB)
- Appendix 15-C – 2009 Fish and Fish Habitat Baseline Report (PDF – 72 MB)
- Appendix 15-D – 2009 Aquatic Resources Baseline Report (PDF – 5 MB)
- Appendix 15-E – 2010 Fish and Fish Habitat Baseline Report (PDF – 30 MB)
- Appendix 15-F – 2010 Water Quality and Aquatic Resources Baseline Report (PDF – 7 MB)
- Appendix 15-G – 2011 Fish and Fish Habitat Baseline Report (PDF – 14 MB)
- Appendix 15-H – 2011 Fish and Fish Habitat Compensation Baseline Report (PDF – 11 MB)
- Appendix 15-I – 2012 Fish and Fish Habitat Baseline Report (PDF – 27 MB)
- Appendix 15-J – Sediment Quality Data, 2012 and Historical (PDF – 105 KB)
- Appendix 15-K – Fish and Aquatic Habitat Scoping Table (PDF – 134 KB)
- Appendix 15-L – Sediment Quality Modelling (PDF – 386 KB)
- Appendix 15-M – Nitrogen and Phosphorus Load Calculations (PDF – 174 KB)
- Appendix 15-N – South Teigen and North Treaty Creeks Instream Flow Assessment Data (PDF – 662 KB)
- Appendix 15-O – North Treaty and South Teigen Creek Instream Flow Threshold Assessment (PDF – 1 MB)
- Appendix 15-P – Teigen Creek Instream Flow Threshold Assessment (PDF – 774 KB)
- Appendix 15-Q – MMER Fish Habitat Compensation Plan (PDF – 99 MB)
- Appendix 15-R – HADD Fish Habitat Compensation Plan (PDF – 96 MB)
- Appendix 15-S - KSM Project: 2012 Fish Bearing Status Assessment Memorandum (PDF - 2 MB)
- Appendix 15-T - KSM Project: Fish Distribution Maps (PDF - 14 MB)
- Appendix 16-A – 2009 Wetlands Baseline Report (PDF – 31 MB)
- Appendix 16-B – Wetland Habitat Compensation Plan (PDF – 13 MB)
- Appendix 16-C – Wetlands Scoping Table (PDF – 130 KB)
- Appendix 17-A – 2009 Vegetation and Ecosystem Mapping Baseline Report (PDF – 230 KB)
- Appendix 17-B – Terrestrial Ecosystem Mapping (PDF - 46 MB)
- Appendix 17-C – Assessment of Culturally Important Plants (PDF - 204 KB)
- Appendix 17-D - Terrestrial Ecosystems Scoping Table (PDF - 66 KB)
- Appendix 18-A – 2009 Wildlife Characterization Baseline Report (PDF – 23 MB)
- Appendix 18-B – 2009 Wildlife Habitat Suitability Baseline Report (PDF – 14 MB)
- Appendix 18-C – 2008 and 2009 Grizzly Bear DNA Baseline Report (PDF – 4 MB)
- Appendix 18-D – 2010 and 2011 Mountain Goat Aerial Surveys, Brucejack Project (PDF – 1 MB)
- Appendix 18-E – Wildlife and Wildlife Habitat Scoping Table (PDF – 151 KB)
- Appendix 19-A – BKL Environmental Noise Assessment (PDF – 3 MB)
- Appendix 19-B – Noise Scoping Table (PDF – 169 KB)
- Appendix 20-A – 2012 Economic Baseline Report (PDF – 7 MB)
- Appendix 20-B – Economic Model Report (PDF – 3 MB)
- Appendix 20-C – Third Party Assessment of KSM Project 2012 Economic Model Report (PDF – 188 KB)
- Appendix 20-D – Economics Scoping Table (PDF – 128 KB)
- Appendix 21-A – Archaeological Impact Assessment, Final Report – Heritage Inspection Permit 2008-0128 (PDF – 9 MB)
- Appendix 21-B – Archaeological Impact Assessment, Final Report – Heritage Inspection Permit 2012-0192 (PDF – 30 MB)
- Appendix 21-C – Heritage Scoping Table (PDF – 132 KB)
- Appendix 22-A – 2012 Social Baseline Report (PDF – 10 MB)
- Appendix 22-B – Social Scoping Table (PDF – 130 KB)
- Appendix 22-C – Highways 37 and 37A Traffic Effects Assessment (PDF – 57 MB)
- Appendix 23-A – Non-Traditional Land Use Baseline Report (PDF – 11 MB)
- Appendix 23-B – Land Use Scoping Table (PDF – 131 KB)
- Appendix 24-A – 2009 and 2010 Visual Quality Baseline Report (PDF – 10 MB)
- Appendix 24-B – KSM Project 2009 and 2010 Visual Quality Baseline Report Addendum (PDF – 5 MB)
- Appendix 24-C – Visual and Aesthetic Resources Scoping Table (PDF – 157 KB)
- Appendix 25-A – 2009 Country Foods Baseline Report (PDF -2 MB)
- Appendix 25-B – Baseline Country Foods Risk Assessment of Chinook Salmon in Teigen Creek, 2010 (PDF – 154 KB)
- Appendix 25-C – KSM Country Foods Screening Level Risk Assessment for the PTMA (PDF – 750 KB)
- Appendix 25-D – KSM Country Foods Screening Level Risk Assessment for the Mine Site (PDF – 1 MB)
- Appendix 25-E – Human Health Scoping Table (PDF – 127 KB)
- Appendix 27-A – Access Roads - Deactivation Plan (PDF – 365 KB)
- Appendix 27-B – Reclaimed and Disturbed Areas, All Project Phases (PDF – 95 KB)
- Appendix 29-A – Nisga'a Social, Economic, Resource Use, and Cultural Survey Statistical Report (PDF - 2 MB)
- Appendix 29-B – Nisga'a Business Survey Statistical Report (PDF – 810 KB)
- Appendix 29-C – Nisga'a Guidelines Focus Group Report (PDF - 7 MB)
- Appendix 29-D – Impacts of Mining Operations on Aboriginal Communities in the Northwest Territories and Labrador: Case Studies and Literature Review (PDF – 564 KB)
- Appendix 30-A – Tahltan Nation Traditional Use Desk Based Research Report (PDF – 2 MB)
- Appendix 30-B – Skii Km Lax Ha Traditional Use Desk Based Research Report (PDF – 9 MB)
- Appendix 30-C – Gitanyow First Nation Traditional Use Desk Based Research Report (PDF – 3 MB)
- Appendix 30-D – Gitxsan Nation Traditional Use Desk Based Research Report (PDF – 3 MB)
- Appendix 30-E – Metis Interests Desktop Study (PDF – 5 MB)
- Appendix 31-A – Naviguable Waters Scoping and Minor Works, and Waters Order Screening Tables (PDF – 181 KB)
- Appendix 31-B – Potentially Naviguable Streams (PDF – 23 MB)
- Appendix 31-C - Detailed Engineering Design Drawings for Bridges Crossings, Transmission Line, and Pipe Intakes (17 MB)
- Appendix 33-A – Regulatory and Best Practices Guidance Documents Applicable to Alternatives Assessments for KSM Project (PDF – 130 KB)
- Appendix 33-B – Assessment of Alternatives for KSM Project Tailing Management Facility (PDF – 49 MB)
- Appendix 33-C – International Cyanide Management Code Principles and Standards of Practice (PDF - 118 KB)
- Appendix 33-D – Comminution Circuit Energy Comparison between HPGR Circuit and SABC Circuit (PDF – 13 MB)
- Appendix 33-E – KSM Water Storage Dam Value Engineering Study Report (PDF – 1 MB)
- Appendix 33-F1- 2008 Site Investigation Report (PDF - 202 MB)
- Appendix 33-F2 - 2009 Site Investigation Report (PDF - 8 MB)
- Appendix 33-F3 - 2010 Site Investigation Report (PDF - 197 MB)
- Appendix 33-F4 - AMEC Status Update Memo (May 03, 2004) (PDF - 2 MB)
- Appendix 33-F5 - Tailings & Waste Rock Management - Conceptual Scoping Study Presentation (PDF - 20 MB)
- Appendix 33-F6 - Technical Report and Preliminary Economic Assessment of the Brucejack Project (PDF - 17 MB)
- Appendix 33-F7 - 2009 Vegetation and Ecosystem Mapping Baseline Report (PDF - 36 MB)
- Appendix 33-F8 - 2008 Baseline Study Report - Chapter 10: Fisheries (PDF - 60 MB)
- Appendix 33-F9A - 2009 Fish and Fish Habitat Baseline Report (PDF - 37 MB)
- Appendix 33-F9B - 2009 Fish and Fish Habitat Baseline Report - Appendices (PDF - 39 MB)
- Appendix 33-F10 - 2010 Fish and Fish Habitat Baseline Report (PDF - 30 MB)
- Appendix 33-F11 - 2008 and 2009 Grizzly Bear DNA Baseline Report (PDF - 5 MB)
- Appendix 33-F12 - 2009 Wildlife Characterization Baseline Report (PDF - 23 MB)
- Appendix 33-F13 - 2009 Wildlife Habitat Suitability Baseline Report (PDF - 10 MB)
- Appendix 33-F14 - Northwest Transmission Line Project: Skii km Lax Ha Traditional Use and Knowledge Report (PDF - 15 MB)
- Appendix 33-F15 - 2009 Wetlands Baseline Report (PDF - 26 MB)
- Appendix 34-A – Memorandum - KSM Ground Temperatures: Potential Permafrost Occurrence (PDF – 2 MB)
- Appendix 34-B – Mitchell Glacier Stability Study (PDF – 475 KB)
- Appendix 35-A – Failure Mode & Effects Analysis (FMEA) Summary Table for October 2009 Workshop (PDF -109 KB)
- Appendix 35-B – Dam Break and Inundation Study for Water Storage Dam (PDF – 76 MB)
- Appendix 35-C – Dam Break and Inundation Study for Tailing Management Facility (PDF – 25 MB)
Document Reference Number: 14