Cold Lake First Nation: CUZ46 Wastewater System Expansion
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The existing capacity of the Cold Lake First Nation wastewater collection and treatment system has been deemed insufficient to meet current and projected future demand. As such, Cold Lake First Nation proposes the expansion of its wastewater collection infrastructure to include an expansion of the collection system, and construction of a new lift station, 4.4 km of wastewater forcemain and gravity wastewater main, connection to the City of Cold Lake wastewater collection and treatment infrastructure, and decommissioning of the existing Cold Lake First Nation wastewater treatment lagoon. The on-reserve portions of the routing will generally follow established roadways to the crossing of the Beaver River.
Extensive geohazard analysis and geotechnical investigations have been completed and identified the presence of a deep-seated landslide along the south embankment of the Beaver River. Trees within the landslide area suggest that the slope has not been subject to significant displacement for at least 50 years indicating stability of the area in comparison to other alignments reviewed as part of the project. The north side of the river valley does not demonstrate significant geohazards.
Vegetation will be cleared and mulched to a width of 4.0m along the entire route to facilitate equipment access and maintenance of the infrastructure.
The off-reserve alignments generally follow un-developed public right-of-ways under the jurisdiction of the MD of Bonnyville and are outside of the scope of this impact assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Notice of Intent to Make a Determination | - | November 2, 2023 |
Contacts
Indigenous Services CanadaJoël Gervais, Environment Officer
630 Canada Place
9700 Jasper Ave
Edmonton, Alberta T5J 4G2
Telephone: 780-370-5008
Email: joel.gervais@sac-isc.gc.ca
-
Location
- Cold Lake First Nation (Alberta)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
In progress -
Start Date
2023-11-02 -
Proponent
Cold Lake First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
86061
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Cold Lake Budget 2018 Year Three Housing Project 2020 (6 Units)
Cold Lake First Nation -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 1: Cold Lake -
Cold Lake First Nation - Frog Lake Regional Water Tie-In
Cold Lake First Nation -
Cold Lake First Nations: Casino Dene Expansion, Event Centre, Parking Project
Cold Lake First Nations -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 1: Cold Lake -
Cold Lake First Nation Housing Project 2019 (10 Unit Renovation)
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 4: Cold Lake -
Department of National Defence Future Fighter Capability Project - Demolition of Hangars 6 and 7, and Construction of New Supporting Infrastructure
4 Wing Cold Lake, approximately 300 kilometers northeast of Edmonton -
21M Range Revitalization (CL220020) - 4 Wing Cold Lake
4 Wing Cold Lake -
Renovation of Building 325 - Pumphouse & Water Purification Plant (CL210010) - 4 Wing Cold Lake
4 Wing Cold Lake -
Demolition of Barrack Block 48 - 4 Wing Cold Lake
4 Wing Cold Lake -
Replacement of Collapsed Storm Sewer Lines - 4 Wing Cold Lake
4 Wing Cold Lake -
Maintenance, Repair, and Installation Work for Storage Tank Systems - Cold Lake Air Weapons Range and 4 Wing Cold Lake
Cold Lake Air Weapons Range and 4 Wing Cold Lake -
Building Demolition and Underground Fuel Line Removal - 4 Wing Cold Lake
4 Wing Cold Lake -
Building Demolition - 4 Wing Cold Lake
Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 5: Cold Lake -
Campus Energy - Pipeline Replacement/Removal
4 Wing Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 2: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 2: Cold Lake -
Cold Lake First Nation: CUZD3 Phase II and III Water Distribution System
Cold Lake First Nation -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 3: Cold Lake -
Cold Lake First Nation Water System Upgrades
Cold Lake First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WATERHEN I.R. 130 -
Frog Lake First Nation Landfill Cap Construction
Frog Lake First Nation -
Powwow Arbour Construction
Pierceland -
Frog Lake Waste Management Transfer Station
Frog Lake First Nation -
RW-4850 Authorization to Construct and Operate a Right of Way for a gas pipeline
RW-4850 -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Ministikwan Lake Cree Nation - Solid Waste Transfer Station
Ministikwan IR161 -
Marguerite Lake Compressed Air Energy Storage Project
La Corey -
Kehewin Treatment Centre - 2020-3825
Kehewin Cree Nation -
Kehewin Lift Station Project
Kehewin Cree Nation -
Ministikwan Subdivision Development
Ministikwan IR 161 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 3) -
Kehewin Transmission System Extension Project
Kehewin Cree Nation -
Kehewin Cree Nation Waste Diversion Station
Kehewin Cree Nation -
OS-7251 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
Cold Lake Air Weapons Range (CLAWR) Culvert Replacement
4 Wing Cold Lake -
OS-7250 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161A -
Frog Lake Waskonaman Hill Gravel Project (Amendment)
Frog Lake First Nation -
OS-6825 Authorization to Construct an access road and a Surface Lease Extension and Operate a Multi-well oil pad
OS-6825 -
Canadian Natural Resources Limited - New radiocommunications tower on NW 34-68-4 W4M, Cold Lake Air Weapons Range, AB
NW 34-68-4 W4M. , Cold Lake Air Weapons Range, AB -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P71C - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
11-04-069-04W4 -
SaskPower HR-01033 - RPD-511 PQ Rural Rebuild (Makwa Rebuild)
Makwa First Nation -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P162 - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 1) -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
06-09-069-04W4 -
Onion Lake Cree Nation Aquatic Centre Project
Onion Lake Cree Nation Aquatic Centre Project -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 3) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 2) -
Saddle Lake Cree Nation: CU123 Whitefish Lake IR no. 128 Water System - Cistern Repairs & Replacements
Saddle Lake Cree Nation -
Saddle Lake Cree Nation: P047935 Child Welfare Reunification Infrastructure Project
Saddle Lake First Nation -
RW-4851 Authorization to Construct and Operate a Right of Way for a gas pipeline
Frog Lake First Nation -
New Fibre Installation
Saddle Lake 125 -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
Saddle Lake Gas Distribution System (Child Welfare Reunification Subdivision)
Saddle Lake Cree Nation -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Replacement of Water Crossing and Road Alignment
Primrose Lake Evaluation Range -
Saddle Lake Cree Nation Women's Shelter Project
Saddle Lake Cree Nation -
Saddle Lake 40 Acre Housing Project
Saddle Lake Cree Nation -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Whitefish Lake First Nation #128 Waste Transfer Station
Whitefish Lake First Nation #128 -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
New Fibre Installation
Project Site 2 - Heart Lake: -
Heart Lake First Nation: CU370 Wastewater System Emergency Repairs
Heart Lake First Nation -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
New Fibre Installation
Project Site 1 - Heart Lake: -
Heart Lake First Nation: Inter-jurisdictional Access Road
Heart Lake First Nation #167 -
Beaver Lake New School
Beaver Lake Cree Nation -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Construction of a Royal Canadian Mounted Police Detachment in Vermilion, Alberta
Vermilion -
Potential Regional Assessment of a Western Energy Corridor
near Vermilion -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
Fixed Point-to-Point Link from Dorintosh, SK to Waterhen Lake, SK
Waterhen 130 Reserve -
Trench Removal and Site Restoration in C1 area at CFB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
EAGLES LAKE I.R. 165C -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 1) -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon Operations
Thunderchild First Nation -
New Fibre Installation, Upgrade (Single) Tower
Moonlight bay -
Flying Dust Commercial Project
Meadow Lake -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 2) -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 1) -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 2) -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 3) -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
Install Cattle Watering Line in the Range and Training Area - Garrison Wainwright
Garrison Wainwright -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Upgrades to Roads within Administrative Area- Garrison Wainwright
Garrison Wainwright -
Skate Park Design-Build Project - Garrison Wainwright
Garrison Wainwright -
Demolition of Tent City, Building 313 and Water Point - Garrison Wainwright
Garrison Wainwright -
Battle River Pumphouse Replacement - Garrison Wainwright
Garrison Wainwright -
Upgrade Railhead at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrade Range 1 at Garrison Wainwright
Garrison Wainwright in Denwood -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 633) -
New Power Line Installation
CFB Suffield, Medicine Hat -
Reconfigure Power Distribution at the Exercise Control Site
CFB Suffield, Medicine Hat -
Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
Garrison Wainwright (Denwood) -
Demolish Pre-Wash Facility - Garrison Wainwright
Garrison Wainwright -
Front Gate Water Loop - Garrison Wainwright
Garrison Wainwright in Denwood -
Upgrade Main Petroleum Oils and Lubricants (POL) Facility at Garrison Wainwright
Garrison Wainwright in Denwood -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Bulk parking lot) -
Provide Power to Troop Shelters at Garrison Wainwright
Garrison Wainwright (Denwood) -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 750) -
Upgrade Water and Sewer Utilities to Building AW22 at Garrison Wainwright
Garrison Wainwright (Denwood) -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Upgrades to Range 8 - Garrison Wainwright
Garrison Wainwright -
Construct Sniper Range at Garrison Wainwright
Garrison Wainwright (Denwood) -
Chipewyan Prairie First Nation 2021 Subdivision Project (Phase 1)
Chipewyan Prairie First Nation -
Stabilize Temporary Bridge Abutments - Garrison Wainwright
Garrison Wainwright -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
New Fibre Installation
Project site 4: Regional Municipality of Wood Buffalo -
ATCO Gas and Pipelines: 1091764 North Janvier Natural Gas Delivery Pipeline Upgrade Project
Chipewyan Prairie First Nation -
Chipewyan Prairie First Nation Housing Project 2020-21 (5 Units)
Chipewyan Prairie First Nation -
Janvier Secondary Egress Road
Chipewyan Prairie First Nation -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Lamont Railcar Storage Project
Northwest of Lamont -
Ryley Facility Expansion Project
Ryley -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Reconstruct Asphalt Fitness Trails Phase 1 - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Ryley Biomedical Waste Incinerator Project
Ryley -
Astotin Lake Dock Replacement
Elk Island National Park -
Building Foundation Removal and Site Restoration in Lost Farm Area at 3CDSB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Dore Lake Wharf Removal
Dore Lake -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Demolish and Upgrade Vertical Village - Garrison Wainwright
Garrison Wainwright -
Bear and Moss Trails Restoration, Elk Island National Park
Elk Island National Park -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
LA PLONGE I.R. 192 -
Culvert Replacement with Larger Diameter
Elk Island National Park -
Highway 165 Grade Raise near Beauval, SK
Beauval, SK -
Buffalo River Dene Nation Solid Waste Transfer Station
BUFFALO RIVER DENE NATION RESERVE #193 -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
Enbridge Northern Gateway Project
Bruderheim -
ATCO Salt Cavern Storage Expansion Project
14 kilometres northeast of Fort Saskatchewan -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
BUFFALO RIVER DENE NATION I.R. 193 (Tower 2) -
La Plonge Solar Project
English River First Nation Reserve -
La Plonge Solar and Battery Energy Storage System
English River First Nation Reserve -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
Buffalo River Dene Nation Subdivision Stage 4
Buffalo River Dene Nation IR 193 -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
Fixed Point-to-Point Link from Buffalo Narrows, SK to Dillon, SK
Buffalo River Dene Nation I.R. 193 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
BUFFALO RIVER DENE NATION I.R. 193 (Tower 1) -
Energy East Project
Hardisty -
Hardisty Rail Terminal Project
10 km southeast of Hardisty -
Redwater Facility Rail Yard Project
Near Redwater -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Sweetgrass First Nation Wastewater System Upgrades
Sweetgrass First Nation -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan