Dock Rehabilitation – Keefer Terminal, Port of Thunder Bay
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Thunder Bay Port Authority proposes to rehabilitate existing dock infrastructure at Keefer Terminal. The project is funded by Transport Canada under the the National Trade Corridors Fund (NTCF). The proposed project is split into 2 phases with different timing, as follows:
• Phase 1 – Cargo Ramps No. 9 - 12: permanent infill and decommissioning. All work is at deck level only. There are no in-water works, no pile driving, and no disturbance to the lakebed associated with this component. Construction, pending required approvals, is planned for fall 2026.
• Phase 2 – Cargo Ramps 1, 2, 3 & 4: replacement of Cargo Ramps No. 1 and 2; structural strengthening of Cargo Ramps No. 3 and 4; underwater pile repairs, deck soffit repairs, and pavement replacement across Docks 1, 2 and 3, and replacement of bollards, fenders, and curbs. Construction, pending required approvals, is planned for 2027.
Latest update
Participate
Contacts
Transport CanadaLinda Beaulieu, Environmental Officer
Toronto, Ontario
Email: Linda.Beaulieu@tc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Keefer Terminal, 100 Main Street, Thunder Bay, Ontario, P7B 6R9 (Ontario)
-
Nature of Activity
- Building and Property Development
- Ports and Harbours
-
Assessment Status
In progress -
Start Date
2026-06-22 -
Proponent
Thunder Bay Port Authority -
Authorities
- Thunder Bay Port Authority
- Transport Canada
-
Assessment Type
Project on federal lands -
Reference Number
90566
Nearby assessments
...within 200 kilometres-
Marine Terminal Upgrade Project - Thunder Bay Port Authority - Thunder Bay, ON
Thunder Bay Port - Wharves and Keefer Terminal -
Thunder Bay (Current River) Harbour Rehabilitation
Thunder Bay -
Environmental Remedial Work at the former Fire Training Area at the Thunder Bay Airport
Thunder Bay -
Thunder Bay Airport Remedial Trial, Thunder Bay, Ontario
Thunder Bay Airport -
Thunder Bay FFTA Remediation Project - Permeable Reactive Barrier Installation, Thunder Bay, Ontario
Thunder Bay -
Replacement of the Superior West Weather Radar
Shuniah, ON -
Pigeon River Drilled Well Groundwater Supply
CBSA Pigeon River -
Wharf Demolition, Hurkett, Ontario
Hurkett, Ontario -
Lake Superior National Marine Conservation Area Discovery Centre
Lake Superior National Marine Conservation Area -
Lac Des Mille Lac First Nation Residential Sub Division
Lac Des Mille Lac First Nation -
Range and Training Area - Thunder Bay Region
Upsala -
BNA District Heating System Project
Sand Point First Nation Reserve -
Pays Plat First Nation - Lot Servicing Project (20)
Pays Plat First Nation -
Pays Plat New Housing Units
Pays Plat -
The BNA Road Access Project
Bingwi Neyaashi Anishinaabek -
Bingwi Neyaashi Anishinaabek (196) Lot Servicing and Pre-Construction
Bingwi Neyaashi Anishinaabek -
The BNA Three Phase Transmission Project
The BNA Three Phase Transmission Project -
Bingwi Neyaashi Anishinaabek Waste Transfer Station Project
Bingwi Neyaashi Anishinaabek (BNA) -
Ginoogaming KM 132 Bridge Replacement
Ginoogaming KM 132 Bridge -
New Fibre Installation
Project Site 1 -
Gull Bay Roads Rehabilitation
Neebing -
Gull Bay First Nation Diesel Generating Station Upgrade
Kiashke Zaaging Anishinabe -
New Fibre Installation
Project Site 2 -
Gull Bay Lagoon Expansion
Gull Bay Lagoon Expansion-Gull Bay First Nation -
Kiashke Zaaging Anishinaabek - Small Scale Waste Transfer Design and Construction
Kiashke Zaaging Anishinaabek (Gull Bay) First Nation -
Soil Remediation at Slate Island Coast Guard Site, Patterson Island, Ontario
Slate Island, Ontario -
Hammond Reef Gold Project
Mitta Lake -
AZA Roadway Granular Procurement and Design-Build Construction
Animbiigoo Zaagi'igan Anishinaabek