Attachment Opposition to Centre Village project

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Treena MacTavish
  • Reference number: 246
  • Submitted: 2025-08-20 - 11:23 PM
  • Project phase: Planning
  • I am strongly opposed to New Brunswick Power's proposal to build a natural gas power plant on the Chignecto Isthmus.  This region is environmentally sensitive, is of historical and agricultural significance and is home to species at risk.  The Chignecto isthmus is also a critical wildlife corridor formoose and an important stopover for migratory birds.  With rising sea levels due to climate change, the Chignecto Isthmus has been projected to be under water in less than 30 years. For all of the above reasons, the Centre Village proposal should not be approved.  A natural gas power plant and diesel storage here would be an environmental disaster. I understand that New Brunswick Power needs to increase their energy capacity and that the federal government would like to have oil and gas pipelines stretching across Canada, however Canada should be ended our reliance on fossil fuels and focussing on green power and small nuclear reactors. If the New Brunswick and federal governments are going to insist on building a new gas power plant in New Brunswick, then it absolutely should not be situated at the proposed location.  The Chignecto Isthmus is a critical corridor between New Brunswick and Nova Scotia.   There are transmission lines elsewhere in the province that a new power plant could be built near without endangering the wetland, farmland, and critical wildlife habitat of the isthmus. Separate from my comments above, I feel that area residents' concerns are valid over the short notice from New Brunswick Power about the proposed facility,  the contract with a US company that has lawsuits over deficient work (such as Beumer Corp. v. ...

Report

Attachment Centre Village RIGS Project - Kopit Lodge

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Administrator on behalf of Kopit Lodge & Elsipogtog First Nation
  • Reference number: 247
  • Submitted: 2025-08-19 - 2:38 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • See the attached submission / Veuillez consulter la pièce jointe  
  • Attachment included
  • Summary of the Project Description for the Centre Village Renewables Integration and Grid Security Project Submitted by: Kopit Lodge & Elsipogtog First Nation TABLE OF CONTENTS | i Contents 1.0 Introduction ......................................................................................................... 2 2.0 Elsipogtog First Nation ........................................................................................ 2 2.1 Kopit Lodge ..................................................................................................... 3 3.0 The Centre Village Renewables integration and Grid Security Project ........ 3 4.0 EFN Initial Comments on the Initial Project Description .................................. 6 Elsipogtog First Nation – Comments on the CV RIGS Project Description | 2 1.0 Introduction Elsipogtog First Nation (EFN, Elsipogtog) and Kopit Lodge have undertaken an initial review, as a part of the Impact Assessment Agency of Canada (IAAC) application process, for the Wattbridge/PROENERGY Holding Company Inc. (Wattbridge; the Proponent) proposed Centre Village Renewables Integration and Grid Security Project (the Project, CV RIGS). This infrastructure project is intended to develop an additional 500 megawatt (MW) of in-province power generating capacity. The Project lies within our Sacred Traditional Territory, where our people have lived, hunted, fished, and gathered since time immemorial. Our connection to these lands and waters is inseparable from our identity, and any disturbance to this landscape carries implications for our rights, responsibilities, and cultural continuity. Despite generations of colonial ...

Report

Attachment Centre Village Project - Letter Writing Campaign

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Administrator on behalf of Sierra Club Canada Foundation
  • Reference number: 244
  • Submitted: 2025-08-15 - 5:14 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • Please see the attached submission. A total of 496 submissions of this form letter were submitted by Sierra Club Canada on behalf of individuals that responded to a form posted on the Sierra Club Canada website.  
  • Attachment included
  • A total of 496 submissions of the attached form letter were received by Impact Assessment Agency of Canada between July 24, 2025 and August 13, 2025. They were submitted by Sierra Club Canada on behalf of individuals that responded to a form posted on the Sierra Club Canada website Letter to IAAC CC: The Honourable Dominic LeBlanc, MP for Beausejour To whom is may concern: I am writing to express my concern that a new gas and diesel fired electricity plant is being rushed through the impact assessment process in New Brunswick. This plant will be expensive and increase NB Power’s reliance on volatile fracked gas from the United States at a time when renewable energy and storage is becoming cheaper than fossil fuels. As wildfires burn across this country, we need to turn down the heat of climate change, not turn it up by burning more fracked gas and diesel. I am also concerned that the location of this plant in Tantramar New Brunswick will harm birds, wildlife and sensitive wetland complexes that make this key ecosystem between New Brunswick and Nova Scotia so unique and precious. The public has been given very little time - until August 13 - in the dog days of summer to comment on this first phase of the impact assessment of this project. Trying to push this through when most people are trying to enjoy their summer (and stay out of the heat) demonstrates a lack of respect for public consultation. Please put the brakes on this project and work with local communities to start up projects that respect the concern of the community and will advance energy democracy in New Brunswick.

Report

Attachment Not aligned with Canada's interests

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Tantramar Resident
  • Reference number: 232
  • Submitted: 2025-08-13 - 11:30 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • I have read the Initial Project Description (IPD) and I attended two public sessions in Tantramar to learn about the proposed facility. I will mention a few concerns briefly, then I will focus on the the crux of the problem that calls for a federal government intervention in the form of a full environmental assessment or, better still, an integrated Canadian solution. The public meetings hindered rather than helped garner trust in the power utiity, the provincial government regulators, and the U.S.-based company that would operate the facility. From the outset, the "Renewables Integration and Grid Security" (RIGS) project name itself is off-putting as it attempts to soften the reality that this is a natural gas fuelled facility. At the community sessions there was a company claim of equity partnership implying this is already in place with Indigenous communities (shown in publicly shared documents), then it became clear this is false based on company responses to community questions. This accidental or overt mis-information is particularly egregious in the context of Reconciliation efforts as it appears to once again take advantage of Indigenous and suggest the project has their support. The company described a twenty+ year period of operations insinuating there may not be a need for the facility after that period, whereas company responses to questions at the public sessions indicated the twenty year period simply refers to the lease term and, not only do they expect the lease to be renewed, but they are hoping to expand facilities in Canada. New Brunswick Power is undergoing a review by the provincial government following a series of major errors, mis-management of infrastructure ...

Report

Attachment comments on Centre Village Project

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Administrator on behalf of Dr. Mary Lou Harley
  • Reference number: 242
  • Submitted: 2025-08-13 - 11:19 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • See the attached submission / Veuillez consulter la pièce jointe
  • Attachment included
  • To The Impact Assessment Agency Canada August 13, 2025 Comments on Centre Village Renewables Integration and Grid Security Synchronous Condensing/Generation Facility Project - Initial Project Description By Ecological Justice Working Group, United Church of Canada, Regions East Contact: Dr. Mary Lou Harley Thank you for the opportunity to comment on this Initial Project Description prepared by PROENERGY Holding Company, Inc. The United Church of Canada has a long history of policies, documents, and submissions on social, environmental and ethical issues relating to energy issues and climate change. These Comments are grounded in that extensive base. Overall The proponent’s document is thin in required detail and documentation, dismissive of several aspects that need to be comprehensively addressed, and inadequate in information in areas of potential impacts particularly related to this site selection. The proponent provides comments but no data to justify this fossil fuel project as necessary to support a resilient grid that is able to ramp power up or down, shift loads, and balance variable power inputs like solar, wind, hydroelectric and geothermal as is the intention of modernized grids. Alternatives to this project for the grid-supportive purposes such as modern storage systems are not seriously presented with data. The site is completely unacceptable from an ecological assessment as well documented and nationally and internationally recognized, though not acknowledged by the proponent. The project site selection was made based on its proximity to an existing NB Power 138 kilovolt transmission line and the Maritimes and Northeast Pipeline (M&NP) 30” natural gas ...

Report

Attachment Comments on the Initial Project Description and Environmental Impact Assessment Registration for the Centre Village Renewables Integration and Grid Security Project - 89719.

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Administrator on behalf of Sierra Club Canada Foundation
  • Reference number: 237
  • Submitted: 2025-08-13 - 10:44 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • See the attached submission / Veuillez consulter la pièce jointe
  • Attachment included
  • Re: Comments on the Initial Project Description and Environmental Impact Assessment Registration for the Centre Village Renewables Integration and Grid Security Project - 89719 Submitted via email: CentreVillage@iaac-aeic.gc.ca August 13, 2025 To whom it may concern: Please find below and attached Sierra Club Canada Foundation’s comments and supporting documents on the Project Description and Project Registration for the proposed 500 MW Centre Village Renewables Integration and Grid Security Project (a dual-fuel gas plant with diesel backup in Centre Village, Tantramar). The Sierra Club Canada Foundation (SCCF) is a national grassroots charity that empowers people to be leaders in protecting, restoring and enjoying healthy and safe ecosystems. The Sierra Club Canada Foundation (SCCF) includes four regional chapters: Atlantic, Québec, Ontario, and Prairie, plus the Sierra Youth Coalition, a group whose mandate is to empower young people to become community leaders. It is clear that the proposed project will cause significant, foreseeable, and inadequately mitigated harm to the environment and the need for and alternatives to the project have not been adequately considered. As an organization committed to the rapid adoption of 100% clean energy solutions, protecting and restoring nature, and promoting energy democracy, we recommend the rejection of this project. If the project is not rejected at this stage, we recommend a full joint provincial-federal assessment of the project and / or a regional or strategic assessment as more appropriate methods to determine how best to meet increased and variable energy needs in New Brunswick for the next 25 years (which is the intended ...

Report

Attachment Against the centre Village Renewables Integration and grid security project

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Peter Stephenson
  • Reference number: 228
  • Submitted: 2025-08-13 - 10:05 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • August 13, 2025 This is a letter against the Centre Village Renewables Integration and Grid Security Project, a proposed gas turbine facility in Centre Village, NB, 20kms from Sackville, NB, from a concerned citizen of Tantramar, NB, and of the Chignecto Isthmus. I am deeply concerned about several aspects of the large gas and diesel 10-turbine facility (up to 500 megawatts, supplying up to 320,000 homes) being proposed for Centre Village, 20 kms from Sackville, NB, and located within the Chignecto Isthmus. First, and foremost, I have no confidence in the process being used to put this project in place. It feels like it is a fait accompli and that it will go through no matter how many citizens are against it. The public comment period was short, from mid July to mid August, when many are on vacation (and when the Legislative Assembly is on vacation) and our MLA did not find out about the project until right before its announcement. The mayor of Tantramar has also said that he felt blindsided by this announcement. This limited public access to information and consultation. The online sessions on July 21 and 22 were frustrating, to say the least, and it felt like they were just for show. A sit-down, question and answer session, duly recorded and administered by an impact assessment agency, and not by the Proenergy company, needs to happen. Instead, we are treated to an open house event, over two days and eight hours, August 12 and 13, 2025, right before the due date for questions to the Impact Assessment Agency of Canada, and hosted by the company leading the project, a clear conflict of interest in my books, and highly unprofessional. And Proenergy is going to redact a summary of the public’s ...

Report

Attachment Opposition to Proposed Plant

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Alicia Steeves
  • Reference number: 227
  • Submitted: 2025-08-13 - 10:05 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • I want to register my opposition to the proposed power plant in Centre Village, NB. This project is short sighted and does not have the best interest of the local community and environment in mind. We are experiencing the effects of climate change this summer with the extreme drought conditions, and multiple areas of NB currently on fire, with higher than usual levels of fire activity. The province should be exploring truly renewable energy sources that do not rely on fossil fuels that will contribute to climate warming emissions. Furthermore, the Chignecto Isthmus is an important wildlife corridor and home to many species of wildlife. Their habitats have been degraded and are already in need of restoration, and this project would do the opposite, introducing dangerous gases and the very real threat of release of environmental contaminants into the surrounding waterways. The area is also the only land mass connecting Nova Scotia to the rest of Canada, and has high risk of flooding due to climate change.  Finally, this plant would be owned by an American company - in a time of precarity and political turmoil it is ill advised to give power to American stakeholders. Do better NB Power, your ratepayers deserve a solution that preserves the area for generations to come, listens to environmental experts, and truly serves local community.

Report

Attachment After careful consideration

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Elaine MacDonald
  • Reference number: 225
  • Submitted: 2025-08-13 - 10:04 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • After attending the presentation and question/answer meeting tonight at the Tantramar Veterans Civic Center and carefully weighing what was said, the conclusion I have is that there are more cons to the project in its current state than there are pros, least of which is a confusion by PROENERGY and NB Power about who is involved, who is not involved and anything about the region itself in terms of it’s environment and habitat.  Overall, here is the summation I got from tonight’s meeting: - it's not a full power plant, but a back up that will run at most up to 7% and only if needed...? - It's in the preliminary stages; early enough that environment impact analysis' are not yet fully complete, the actual project isn't fully agreed to yet and they don't have numbers on power rates, costs of the project, etc. They have the backing of 7 Indigenous tribes who have formed into an LP to work with the company. - It's scheduled to begin Q1 in 2026, the Indigenous tribes aren't committed yet to the project, there is enough preliminary impact assessments of the environment to claim that the plant won't affect fish, the water nor any local wildlife, especially birds. (side note: sea trout can be found in the area's brooks/streams/rivers apparently, yet on boards describing the project there was indication of 'no fish impact', for example. Secondary side note: Fort Folly (Amlamgog) and Elsipogtog First Nation are noted tonight as saying: Elsipogtog is AGAINST this project (IIRC; if I am wrong I'm sure someone can correct that information). Fort Folly (Amlamgog) is requesting documents to look into it [assumption by me here is that ...

Report

Attachment Centre Village Renewables Integration and Grid Security Project

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Sharyn Boyle
  • Reference number: 223
  • Submitted: 2025-08-13 - 9:57 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • I am writing to strongly object to the Centre Village Renewables Integration and Grid Security Project in Tantramar, New Brunswick. 1. Climate change is devestating current and future life on earth and fossil fuels are the number one cause for this. We are past 'mitigating' impact: we must halt all new projects using them: especially considering the devestating effects of fracking wherever its sourced. 2. The potential for destruction of the crucial life-sustaining and sensitive environmental and connective Chignecto waterways can not be risked. 3. This gas and diesel burning plant is being planned for a rural area with no viable fire department, hospital or emergency services anywhere remotely close enough to respond if an emergency/explosion/fire/leak arises: which is GUARANTEED to take place over a 25-year contract with a foreign energy corporation that can not be trusted to follow through on regulations- see ProEnergy's track record and open court case in Venezuela. 4. The US is a highly unstable political entity that is threatening to colonize Canada, has overt designs on its natural resources, freshwater and Arctic, and is engaged in a tariff war against us. 5. This has been rushed through without any proper transparent community support, environmental, economic or health assessments, or honest all-in Indigenous consulation. 6. There is no honest plan or accountable responsiblility for what happens with this proposed toxic garbage land/building in 25 years. You are in for a messy public fight on your hands. WHAT IS NB POWER and the PROVINCIAL/FEDERAL governement THINKING even considering this project at this time in this place with these people???? -Shary Boyle

Report

Attachment Opposition to the "Centre Village Renewables Integration and Grid Security Project"

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Pamela Wheaton
  • Reference number: 222
  • Submitted: 2025-08-13 - 9:41 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • As a multi generation local, with deep roots to this area, I cannot imagine living anywhere else. From the first tombstone in the Midgic Cemetery, it is like looking out at my family tree. I am deeply connected to this land, this land my family have worked on and given their lives to. I am raising my family here and carrying on the traditions of my people. This area is not an industrial site. This area is a natural gem full of irreplaceable wildlife and home to the vitally important Chignecto Isthmus - a vitally important wildlife corridor connecting NB to NS. Surrounded by National Wildlife Areas like the Tintamarre wetlands and Tantramar Marsh and protected lands everywhere across this region - wetlands and waterways dot and cross this whole area. Centre Village/Midgic is a nature preserve surrounded by open marshes worked by farmers like my family, by woodlands full of rich bio diversity, by old woods that are rich of life and make for irreplaceable animal habitats. You simply do not fill in a wetlands and clear cut an area like this. This is not the place for something of that scale, of that level of potential irreversible harm. The Chignecto Isthmus matters and the attempted avoidance of using that term 'Chignecto Isthmus' throughout this process is sickening. You cannot ignore this area by avoiding calling it what it is: a natural gem and an irreplaceable land corridor that needs to be left alone.  To fill in a wetlands -- which is rich because they said that the Scoudouc industrial park site was not favourable due to 'wetlands' nearby, but have no problem filling in a site that itself is literally 50% wetlands by their own admission and surrounded by wetlands and woods in ...

Report

Attachment Transparency and trust

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Olivia Kingston
  • Reference number: 219
  • Submitted: 2025-08-13 - 9:05 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • From what I gathered at tonight's Q&A session, the panel of people answering the questions could not accurately and clearly answer the questions. They dragged on their answers, filled them with jargon that civilians are sure to not understand, and sure enough, when it was not understood, they talked to us like we were idiots.    What we need from this project is TRANSPARENCY. You need to be MUCH clearer on WHY this is the best option. The community does not UNDERSTAND why you think this is the best option, and you cannot get mad when people are confused. You get NOWHERE by treating the community like idiots.    They are far from unintelligent. The people of Tantramar know far more about the land, wildlife, and water than anyone else. You need to LISTEN to their concerns.    I strongly felt we got nowhere with tonight's Q&A. Partly yes, because the community is already so frustrated, many do not have the capacity to listen anymore. But also because you did not have real, transparent, truthful answers to give us peace of mind.    We need explicit detail on every single assessment and clear information on why this is the best option without demeaning the community for their extremely valid concerns. 

Report

Attachment Inaccurate description of Indigenous role in project

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Elizabeth Stregger
  • Reference number: 217
  • Submitted: 2025-08-13 - 8:50 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • I am submitting an addendum to my previous comment, no. 166, in which I requested a complete environmental impact assessment of this project. At a question and answer event hosted by PROENERGY in Tantramar on August 13, we found out that the documents submitted to the IAAC and shared at community events misrepresent the level of engagement with Indigenous stakeholders. On page 4 of their submission, PROENERGY says that: "WattBridge will also continue to engage NSMTC as a minor equity partner in the Project." Their poster presentation at open houses on August 12 and 13 claims that "Facility will be owned by PROENERGY and the North Shore Mi'kmaq Tribal Council (NSMTC) under a 25-year power purchase agreement with NB Power." At the event on August 13, a representative of the NSMTC said that they have an option to become equity partners. This has not yet happened and he was unwilling or unable to speak on behalf on communities that the proponent claimed in IAAC Zoom consultations were very happy with this deal. The First Nations listed in the proponent's documents may never be minor equity stakeholders - their investment is yet to be decided. I understand why we may not have access to contract language, but I believe that the materials shared by the proponents are intentionally deceptive. This should be a massive red flag for the IAAC and all agencies involved in evaluating this proposal. I am amending my first comment. I am now requesting that the contract between PROENERGY and NB Power be dissolved. Whatever the cost in time and money, this project cannot be allowed to go forward. We have no reason to trust the documentation that the proponent provided to the ...
  • Attachment included
  • Please see the attachment to view the content.
  • Attachment included
  • Please see the attachment to view the content.

Report

Attachment La centrale au gaz fossile proposée ne réduira pas les émissions de gaz à effet de serre

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Professeur d'études de l'environnement, Université de Moncton
  • Reference number: 216
  • Submitted: 2025-08-13 - 8:31 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • Le résumé du projet préparé par la compagnie ProEnergy n'inspire pas confiance : une lecture rapide révèle qu'il est truffé d'incohérences et présente quelques silences inquiétants. Comme je ne dispose que de peu de temps pour exprimer mon commentaire, je mentionnerai seulement un problème évident dans le calcul des émissions annuelles de gaz à effet de serre à la p. 50 (qui d'ailleurs ne présente pas la méthode de calcul utilisée), un manque flagrant de détail sur les eaux usées et leur déversement, qu'on propose de faire simplement dans le fossé d'une route locale, et un flou stratégique quant à la compagnie qui fournira le gaz et le diesel (Irving Oil?...). On dit que le projet contribuera à réduire les émissions de gaz à effet de serre. C'est évidemment faux : en brûlant du gaz et/ou du diesel dans une nouvelle centrale, on augmente les émissions. La compagnie et le gouvernement provincial se permettent d'avancer cet argument parce qu'ils comparent ce projet de centrale au pire cas possible, soit la construction d'une centrale au charbon de même capacité - ce qui serait bien sûr impossible puisque qu'il ne sera plus permis d'utiliser du charbon pour produire de l'électricité au pays à partir de 2030. Les promoteurs du projet de centrale utilisent donc une stratégie trompeuse pour faire croire au public qu'il s'agit d'un projet qui protège l'environnement, alors que ce ...

Report

Attachment Environmental concerns for Chignecto Isthmus and surrounding communities

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Meaghan Mullins
  • Reference number: 215
  • Submitted: 2025-08-13 - 8:29 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • I'm writing on behalf of myself and my family as residents of Strait Shores. We would like to express our concerns and opposition of the Centre Village Renewables Integration and Grid Security Project. We oppose the construction of this gas powered plant because of the environmental effects that it will have on the whole South-East region of New Brunswick, specifically the Chignecto Isthmus. The Chignecto Isthmus is an environmentally sensitive area that is the home of many species that are already at risk and is the only corridor of land connecting New Brunswick and Nova Scotia. It is also a vital migratory path for many bird species. We are also concerned about the projects use of ground water and how the local wetlands, wells, brooks, streams, rivers, and lakes will be impacted. The placement of the power plant on ground that is higher than the surrounding areas means that the discharged effluent will be dispersed to the lower lying areas that feed into the local waterways and ultimately to both the Bay of Fundy and the Northumberland Strait. The impact of this on the fish and aquaculture is also unknown.  On a more personal level our son attends Nature Camps held at the the Atlantic Wildlife Institute which is located very close to the Centre Village RIGS project. He has learned so many things about the local environment and wildlife. As a young person he is very concerned about how the animals and birds will be impacted.  We are disappointed in the lack of communication and oversight concerning the approval of this project.  We encourage decision makers to stop this project until independent environmental and community impact studies are conducted and ...

Report

Attachment Consultation, Environmental and Social Impact, and a lack of transparency and due diligence

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Brent Dearling
  • Reference number: 210
  • Submitted: 2025-08-13 - 7:39 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • There has been no public participation or consultation relating to the development or planning of this project through engagement of the individuals living within the region, and has not fulfilled any environmental or social impact assessments. While it is encouraging that the project has consulted with indigenous people, the blatant lack of involvement of those living within the community, the agencies of elected officials or government representatives, or other community stakeholders speaks volumes to the lack of consideration this project has for the people living within the extended region that the project will share a social and environmental landscape with. This lack of transparency and involvement brings many questions to the forefront of this projects development, many of which will remain unanswered due to a lack of an environmental impact assessment and many other incomplete assessments on the part of the proposed project. Due to this lack of consultation and due diligence on the part of the proposed project, it should not be allowed to proceed.   Proper consideration beyond a bare minimum of site selection based on convenience due to the intersection of a gas line and power distribution, a minimal historical importance for indigenous peoples of the region, and minimal ecological impacts on fish spawning grounds are not ample enough reasons to support the development of this project. Many questions remain regarding how local infrastructure will be impacted from ground water to road conditions for locals, if local services will be able to respond adequately in environmental or health emergencies given the limited access and availability of services for EMT, local/volunteer Fire or other ...

Report

Attachment Climate, Location, and Environmental Concerns

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Barbra Clayton
  • Reference number: 209
  • Submitted: 2025-08-13 - 7:25 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • I would like to register my opposition to the project due to concerns about increased fossil fuel dependence and GHG emissions, the threats to wildlife, and ecological risks, such as watershed health, and air and sound pollution. To elaborate on these concerns: Fossil fuel dependence and GHG emissions: The proposed project would prolong our dependence on burning fossil fuels (natural gas and diesel) for at least 25 years, and the fracked gas on which this project depends entails the release of methane, a potent GHG, all along its line of production. This project will thus undermine our urgent need to cease all GHG emissions, and undercut our ability to meet the federal government’s climate target of net-zero by 2050, as well as the provincial climate targets. Thus to propose a natural gas or diesel powered project in order to meet our energy needs—at a time when there are climate change-induced fires threatening communities in Canada and New Brunswick-- is irresponsible and short-sighted. NB Power should consider alternative ways to meet the challenge of balancing the grid and back-stopping renewable energy, such as through the use of utility-scale batteries, or through the enhancement of our use of hydro-electric energy.   Threats to wildlife: The location of the proposed project is right in the center of a highly sensitive and narrow wildlife corridor on the Chignecto Isthmus, which has been identified by Parks Canada as one 23 regions where conservation and ecological restoration is critically ...

Report

Attachment Opposition to Gas Powered Plant

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Administrator on behalf of Zoë Knight
  • Reference number: 238
  • Submitted: 2025-08-13 - 6:47 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • Good morning. My name is Zoë Knight, I am reaching out to express my opposition to the NB Power approved Grid Security Project Gas Plant that is proposed to be built in the Centre Village of New Brunswick. While this project claims to be creating renewable sources, I find this to be a false claim after reviewing Project Description. Foremost there is no strategy assignment implemented and that is greatly concerning. 25 years is a long time to contract new energy plans. The plans no where mention the actual consideration of why this benefits any person or land but only considers the benefits of creating energy, but who does it benefit really? The plans of the layout of the plant also take up a significant amount of forrest landmass. Recently there have been numerous wildfires spanning across parts of New Brunswick and Nova Scotia. The levels of electricity, hydro, and concrete that is planned to be poured into the soil of the land will limit resources and harm surrounding wildlife and communities while this is already increasingly dire. The strategies are limited I understand but this nor the coal plans are very useful. I fear this impacts will be irreversible. New Brunswick has brilliant forrest and wildlife and this plan would be detrimental not only for the people, but the wildlife too. The outline says they plan on having conversations with Indigenous communities but these have not yet taken place and this worries me to great lengths. I live in Westmorland, where the plant is set to be built. I do not want to see the place I live and am from being depleted of its sources in such a haste and inconceivable manner. Please I ask those involved to seriously reconsider   Zoë 

Report

Attachment Opposition to the 'Center Village Renewables Integration and Grid Security Project' - Consider future generations

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Quinn MacAskill
  • Reference number: 208
  • Submitted: 2025-08-13 - 6:44 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • I am writing to express my opposition to the proposed project. We are in a climate emergency that has been caused by the burning of fossil fuels. The climate crisis has already resulted in loss of life in all parts of the world, with a disproportionate impact on marginalized populations. The science is clear: we must stop burning fossil fuels in order to mitigate this crisis and prevent further loss of life and ecosystems. The more fossil fuels we emit, the closer the risk of crossing irreversable tipping points in Earth's ecological systems. The global context is crucial to understand, because the actions we take here have implications for lives in other parts of the world. Canada is a privileged country; we have both the opportunity and the responsibility to transition to renewable energy. The proposed project would lock New Brunswick into decades more of fossil fuel use. This cannot happen. We do not have the carbon budget globally to be undertaking new fossil fuel projects.  The project proposal includes misleading information such as labeling this as a "renewable" project, as well as unsubstantiated claims in emissions reporting, stating that more sustainable technology will exist when it is eventually time to decomission the power plant so emissions numbers can be reduced. The Chignecto Isthmus is a critical migratory corridor, home to fragile wetland ecosystems and many endangered species. A comprehensive Environmental Impact Assessment must be conducted, and consultation with local Indigenous communities remains inadequate. We must rethink any project that emits greenhouse gases, and focus instead on reducing our overall energy consumption.  Climate change demands that ...

Report

Attachment Opposition to the Centre Village RIGS

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Linda Pearse
  • Reference number: 206
  • Submitted: 2025-08-13 - 6:04 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • I am writing as a resident of Midgic and co-owner of 100 acres of farmland, animals, gardens, and woods to express my deep concern and strong opposition to the proposed Centre Village Renewables Integration and Grid Security Project. I request that a comprehensive impact assessment be undertaken per the guidelines suggested by DUC and that all further action toward this project be brought to a sober halt. The Sikniktewaq/Chignecto Isthmus is home to protected areas for wildlife, migratory birds and wildlife, fish populations, not to mention many farms with crops, livestock, and other animals, such as ours. It is horrifying that local food producers have not been consulted in this process. We, as New Brunswickers, have a responsibility not only to support local farmers, but also to consider those who live within this beloved region—our community members who hike, cycle, and hunt on these lands and along the Canada Trail which bisects our beloved century-farm property.  The planned discharge of wastewater into the marshlands without serious consideration of environmental impacts is unconscionable. I shudder at the lack of transparency and genuine consultation, including the attempt to rush a process through during the summer weeks when so many residents are travelling. The decision not to notify this region's MLA and the mayor of Tantramar is equally disappointing. In short, a gas plant that produces harmful emissions and requires precious water resources should not be built in the middle of a region with increasing fire risk and with sensitive wetlands. Respectfully, Linda Pearse 66 Midgic ...

Report

Attachment Disappointment in plans for LNG Power plant in Midgic

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Nicholas Thompson
  • Reference number: 204
  • Submitted: 2025-08-13 - 5:08 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • I write to express my disappointment with the decision to move forward with a natural gas plant in Midgic, NB. Natural gas has played an important role in displacing coal globally, and will continue to do so in many parts of the world that are not in the position Canada is now. This project represents a failure of foresight. Building natural gas infrastructure in Canada now is to use a 20-year-old solution to today’s problems. This is short-sighted, economically regressive, and an insult to ratepayers who deserve a forward-thinking energy strategy. At a time when wildfires ravage our province’s forests due to extreme heat (a crisis we all understand is driven by greenhouse gas emissions) the doubling down on fossil fuel dependency is indefensible. Canadians are disproportionate emitters; we must leverage our wealth, expertise, and moral responsibility to lead, not lag behind. I emphatically oppose this project and urge reconsideration. Instead, New Brunswick should maximize renewable energy sources of wind and solar with grid-scale storage. We should improve the capacity factor at Point Lepreau to its highest potential. We should invest in non-fossil fuel grid stability solutions to maintain grid inertia, and frequency stability, and invest in our grid to support a green energy build-out, rather than fossil fuel dependant peaker-plants. Awarding this contract to a US firm further compounds the issue, outsourcing both economic benefits and energy sovereignty. NB Power and the provincial government must consult broader expertise to prioritize a resilient, low-carbon grid, not lock us into decades of LNG purchases. We can do better, and the world is ...

Report

Attachment Negative health outcomes foreseeable from the proposed Centre Village gas plant

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Canadian Association of Physicians for the Environment - New Brunswick
  • Reference number: 203
  • Submitted: 2025-08-13 - 4:47 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • It is with deep concern and dismay that as physicians and healthcare providers representing the Canadian Association of Physicians (CAPE) in New Brunswick we submit our comments regarding the proposed Centre Village dual-fuel gas plant. CAPE is a national non-partisan, physician-led organization with over 36,000 supporters. We have regional CAPE committees in 9 provinces, including New Brunswick.  We bring an evidence-based approach to the intersecting issues of health, environment, and social justice.  Climate change is the leading global threat to human health  As physicians and health care providers, we see the impact that climate change is having on the communities we serve. Today, August 13, 2025, the province of New Brunswick is under a heat warning, with temperatures hovering around 36–37 degrees Celsius (Humidex 38 to 43). There are 11 actives wildfires in the province with two deemed out of control, and several communities are on evacuation notice. Wildfire smoke is contributing to poor air quality; people’s homes and lives are at risk.  As the Canadian Climate Institute reports, “Accelerating climate change, largely from the burning of fossil fuels, makes wildfires bigger, hotter, and more frequent.”  The Climate Shift Index (CSI) map shows that climate change made the extreme high temperatures in Fredericton, the province’s capital, 5 times more likely today. CSI ...

Report

Attachment MTI Comments on Summary IPD for Centre Village Project

  • Centre Village Renewables Integration and Grid Security Project
  • Author: Administrator on behalf of Erica Ward - Mi'gmawe'l Tplu'taqnn Incorporated (MTI)
  • Reference number: 239
  • Submitted: 2025-08-13 - 4:46 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited and Information Sessions on the Summary of the Initial Project Description
  • See the attached submission / Veuillez consulter la pièce jointe
  • Attachment included
  • August 13, 2025 VIA EMAIL: Centrevillage@iaac-aeic.gc.ca Impact Assessment Agency of Canada (IAAC) Government of Canada Re: Comments on the Summary Initial Project Description for the proposed Centre Village Renewables Integration and Grid Security Project Please accept these comments on the Initial Project Description (IPD) for the proposed Centre Village Renewables Integration and Grid Security Project Located in Centre Village, New Brunswick, on behalf of Mi’gmawe’l Tplu’taqnn Incorporated (MTI) – a non-profit organization who represents eight of their nine member Mi’gmaq First Nation communities in New Brunswick: Amlamgog (Fort Folly) First Nation, Natoaganeg (Eel Ground) First Nation, Oinpegitjoig (Pabineau) First Nation, Esgenoôpetitj (Burnt Church) First Nation, Tjipõgtõtjg (Buctouche) First Nation, L’nui Menikuk (Indian Island) First Nation, Ugpi’ganjig (Eel River Bar) First Nation and Metepenagiag Mi’kmaq Nation for purposes of consultation. Mi’gmawe’l Tplu’taqnn received notification of the proposed Centre Village Renewables Integration and Grid Security Project, on July 14, 2025. Although MTI staff were aware of a possible project, the MRIA could not be initiated until the Initial Project Description was received on July 14, 2025. The Mi’gmaq are the original inhabitants of New Brunswick. We have occupied and cared for our lands and waters since time immemorial. Along with our Wabanaki brothers and sisters, we entered into sacred, constitutionally protected Treaties of Peace and Friendship with the Crown, and continue to exercise our Aboriginal and Treaty rights, including the rights to hunt, fish and gather up to the present day. The Treaties have been upheld, and ...