Attachment Black Bear Power Plant Project

  • Black Bear Power Plant Project
  • Author: Administrator on behalf of EPMS Administrator
  • Reference number: 23
  • Submitted: 2024-08-29 - 4:29 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited on the Summary of the Initial Project Description
  • Black Bear Power Plant Project Thank you for your correspondence regarding the proposed Black Bear Power Plant Project. We appreciate the opportunity to review the Initial Project Description and to engage in a dialogue about this important development. After consulting with our Council and Administration, we have identified several key areas of concern and interest. These include: Environmental Concerns: Potential impacts on local wildlife and their habitats, particularly species that hold cultural significance for our community. Changes to water quality and availability, which are vital for both our daily lives and traditional practices. Social and Economic Impacts: Effects on community health and well-being, including concerns about potential pollution and noise from the plant. Opportunities for employment and economic development for our members, balanced with concerns about equitable access to these opportunities. Cultural Heritage: Preservation of sacred sites and traditional land use areas that may be affected by the project. We apologize for missing the initial deadline to respond. However, East Prairie Métis Settlement remains very interested in continuing the conversation and would like to set up a meeting to discuss the project further. In terms of the consultation process, we believe that a meaningful dialogue should include: Opportunities for both in-person and virtual meetings to accommodate our community members. Involvement of ...

Report

Attachment Comment on the summary of the Initial Project Description for the Black Bear Power Plant Project

  • Black Bear Power Plant Project
  • Author: Administrator on behalf of Swan River First Nation
  • Reference number: 11
  • Submitted: 2024-08-16 - 3:04 PM
  • Hello Ashifa,   Following up on our continued conversation regarding the Black Bear Power Plant proposal and notification that information provided to date would be available for public viewing.    In addition, please be advised that any assessments and reports provided by SRFN are preliminary in nature. As identified, the initial site assessment does not present a complete and thorough evaluation of the project and potential impacts and infringements to SRFN members Treaty and aboriginal rights. A more complete impact assessment, as identified and determined by SRFN will need to be conducted in order to fully assess the planned project and to explore potential and meaningful mitigations and/or accommodations. Again, it is the expectation of SRFN that the initial site visit and report was the start of a review process and not a comprehensive analysis and not conclusive regarding any issues, concerns and recommendations.   Cheers   Todd   Hi Ashifa,   RE: Black Bear Power Plant (ACO designated  project FNC202204642)   Thank you for the call this morning and listening to SRFN's concerns and challenges regarding the Black Bear Power Plant Project. I was saddened to hear other Nations and communities have not reached out although unfortunately not surprised given the short timelines and extremely limited capacity and resources available. In addition, the strong feeling of hopelessness and lack of meaningful integration and implementation of these types of ...
  • Attachment included
  • Traditional Territory of Swan River First Nation As Agreed To At the Signing of Treaty 8-1899
  • Attachment included
  • SWAN RIVER FIRST NATION “CONSULTATION UNIT” P.O. Box 270 Kinuso, Alberta T0G 1K0 Phone: (780) 775-3536 Fax: (780) 775-3796 2022-09-13 Jamie Lacey LandSolutions Inc. P.O. Box 60 Bentley, Alberta T0C 0J0 Dear Jamie, Re: Power Station Site (Electrical) - S 15-64-11-W5M - FNC202204642 We write on behalf of Swan River First Nation (Swan River) further to your plan submission through LOUIS Planner on 2022-09-07. Swan River holds constitutionally-protected Aboriginal and Treaty rights in respect of the lands and waters in Treaty 8. We have always used the lands and waters in our territory to sustain us and to maintain our connection to our culture and way of life. Our members continue to use our territory today for traditional activities and for the exercise of our Aboriginal and Treaty rights. Your proposal relates to lands and resources within our territory. If allowed to proceed, the activities will affect our lands and our members’ ability to exercise their rights. We are committed to fulfilling our obligations under our own laws and to ensuring that our rights are protected and respected. Swan River will not support development activities in our territory without first confirming that the activities will take place in a way that is consistent with our relationship with our lands and resources and respectful of our rights. As part of this commitment, Swan River expects companies to engage with us and seek our consent prior to undertaking any resource development in our territory. Proponents should be prepared to participate in a respectful, good-faith process of engagement with Swan River, including about how the effects of the proposed activity can be addressed and how our members will benefit from ...
  • Attachment included
  • Swan River First Nation Consultation Policy Purpose This Consultation Policy (Policy) sets out the objectives, principles, and process for consultation between Swan River First Nation (Swan River), the Government of Alberta and the Government of Canada (collectively, the Crown) and where appropriate, industry proponents, in respect of activities in Swan River’s territory in Treaty No. 8. Swan River Rights & Territory Swan River holds inherent and constitutionally protected rights (Swan River Rights) in respect of the lands and waters in Treaty No. 8. For the purposes of this Policy, Swan River’s territory is defined on the map attached as Appendix “A.” We have always relied on the resources in our territory for sustenance and to carry out cultural, spiritual, and economic pursuits. Swan River members continue to exercise their inherent and constitutionally protected rights, including hunting, trapping, and gathering, throughout our territory today. Our ability to exercise our rights is integral to our culture and identity as a people. We remain committed to protecting Swan River Rights and to fulfilling our responsibilities in accordance with our natural laws. We expect the Crown to honour and uphold our Treaty relationship and to fulfil its obligations pursuant to section 35 of the Constitution Act, 1982, including by consulting with us on a Nation-to-Nation basis before making decisions which could affect our lands and rights. We also expect industry proponents to engage with us and seek our consent prior to undertaking activities in our territory. Objectives Swan River’s objectives for consultation are to: ▪ ensure that Swan River Rights are recognized, ...
  • Attachment included
  • SWAN RIVER FIRST NATION “CONSULTATION UNIT” P.O. Box 270 Kinuso, Alberta T0G 1K0 Phone: (780) 775-3536 Fax: (780) 775-3796 2022-09-13 Jamie Lacey LandSolutions Inc. P.O. Box 60 Bentley, Alberta T0C 0J0 Dear Jamie, Re: Power Station Site (Electrical) - S 15-64-11-W5M - FNC202204642 We write on behalf of Swan River First Nation (Swan River) further to your plan submission through LOUIS Planner on 2022-09-07. In our preliminary assessment of your submission we have identified concerns related to fish, wildlife, plants and medicines. In addition, the proposed project may impact cultural and historical features of concern. As we review this proposal in more depth, further details will be provided as to the specific nature and location of our concerns. In order to assess your plans impact and possible infringements to SRFN members Inherent and Treaty rights, a detailed and thorough site visit is required. SRFN is looking forward to working collaboratively through the site visit process and the determination of meaningful mitigation strategies and commitments where required. Sincerely, Kage Bellerose Swan River First Nation CC: Chief Lee Twinn Councillor Ryan Davis Councillor Patrick Chalifoux Councillor Mark Giroux Todd Bailey John Willier
  • Attachment included
  • Swan River First Nation Consultation Box 270 Kinuso, Alberta T0G 1K0 Office: 780-775-2349 Swan River consultation site assessment Analysis 1 Table of Content 1. Table of contents 2. Rights of SRFN and Scope of Operations 3.General Site Assessment Analysis Overview Rights of SRFN and Scope of Operations 1. Swan River First Nation is a signatory to Treaty No.8., and as such SRFN has inherent Treaty and Aboriginal rights, including rights to their culture and way of life. These rights are collectively known as Section 35 rights which are affirmed and protected by the Constitution Act, 1982. It is the authority and priority of the Chief and Council of SRFN to ensure that SRFN Section 35 rights are protected and continuously exercised in preferred manner by their Members. 2. It is, therefore, beyond the study scope to provide a complete assessment of the potential impacts of the proposed project that is in the area that is currently and historically used by SRFN Members for the exercise of their Section 35 rights and is integral to the continuance of SRFN culture and way of life for the current and future generation 3. Similarly, this report does not present a complete suite of recommendations on how any such negative impacts may be avoided, mitigated or positive benefits maximized. It is therefore imperative that the Project impacts to SRFN rights and interests be identified and assessed in an appropriate and fulsome manner in order to develop a responsive mitigation and accommodation plan, to be developed between SRFN, the Proponent and if necessary the Crown 4. Nothing in this report should be construed as: a. ▪ To limit, define or otherwise constrain or prevent SRFN from bringing forward additional ...

Report

Attachment ESDC FAAR and Summary IPD Feedback

  • Black Bear Power Plant Project
  • Author: Employment and Social Development Canada
  • Reference number: 10
  • Submitted: 2024-08-16 - 2:53 PM
  • Project phase: Planning
  • Enclosed is ESDC's completed FAAR for the Black Bear Power Plant Project. 
  • Attachment included
  • Federal Authority Advice Record (FAAR) FAAR Response must be submitted by August 14, 2024 Black Bear Power Plant Project – Kiwetinohk Energy Corp. Registry File: 88747 Department/Agency Employment and Social Development Canada (ESDC) Lead Contact Eva Lazar – Executive Director of Horizontal Policy and Special Projects Division (HPSPD) of the Skills and Employment Branch (SEB) Full Address Phase IV 140 Promenade du Portage, Gatineau, Québec K1A 0J9 Canada Email eva.lazar@hrsdc-rhdcc.gc.ca Telephone 1-613-618-3484 Alternate Contact Kathy Kingsbury– Manager (HPSPD-SEB) kathy.kingsbury@hrsdc-rhdcc.gc.ca 1. a) Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function . ESDC does not exercise powers, nor perform specific duties or functions related to the Project to enable it to proceed. The ESDC Minister’s powers, duties and functions extend to and include all matters relating to human resources and skills development in Canada or the social development of Canada over which Parliament has jurisdiction, and which are not by law assigned to any other Minister, department, board or agency of the Government of Canada. b) Please describe any Indigenous or public consultation that will be undertaken in relation to the exercise of that power, duty or function, including when it would take place. While ESDC is not engaging directly with Indigenous groups regarding specific projects, it can provide the IAAC with information about relevant programming to assist in responses to Indigenous peoples and ...

Report

Attachment ECCC FAAR Response on IPD - Black Bear Power Plant Project

  • Black Bear Power Plant Project
  • Author: Administrator on behalf of Environment and Climate Change Canada
  • Reference number: 12
  • Submitted: 2024-08-15 - 5:14 PM
  • Project phase: Planning
  • See the attached submission / Veuillez consulter la pièce ci-jointe   
  • Attachment included
  • Federal Authority Advice Record (FAAR) FAAR Response must be submitted by August 16 2024 Black Bear Power Plant Project – Kiwetinohk Energy Corp. Registry File: 88747 Department/Agency Environment and Climate Change Canada Lead Contact Leah Dirk, Acting Environmental Assessment Officer Full Address 11 Innovation Blvd Saskatoon, SK S7N 3H5 Email Leah.Dirk@ec.gc.ca EASouthPNR@ec.gc.ca Telephone (306) 514-2363 Alternate Contact Marcus Edino, Marcus.Edino@ec.gc.ca EASouthPNR@ec.gc.ca 1. a) Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function. ECCC does not expect that it will be required to exercise a power or perform a duty or function related to the Project to enable it to proceed. Once the scope of the Project and of the assessment are established by the Agency, this may change as additional activities or Project components could come into scope. Please note the following requirements that may apply to this Project: Species at Risk Act permits For species listed in Schedule 1 of the Species at Risk Act (SARA) as Extirpated, Endangered or Threatened, a permit may be required from ECCC (section 73 of SARA) for activities that affect a listed terrestrial wildlife species, the residences of its individuals or any part of its critical habitat where those prohibitions are in place. Such permits may only be issued: if all reasonable alternatives to the activity that would reduce the impact on the species have been considered and the best solution has been adopted; all feasible ...
  • Attachment included
  • Environmental Protection Operations Directorate Prairie & Northern Region 9250 49 Street ECCC File: 4194-10-3/6350 Edmonton, AB T6B1K5 IAAC Registry: 88747 August 15, 2024 via email at: BlackBear@iaac-aeic.gc.ca Tracy Lachine Project Manager Impact Assessment Agency of Canda / Prairie and Northern Region 1145-9700 Jasper Avenue Edmonton AB, T5J4C3 Dear Tracy Lachine: RE: 88747 – Black Bear Power Plant – Environment and Climate Change Canada’s (ECCC) Federal Authority Advice Record (FAAR) Environment and Climate Change Canada has reviewed Kiwetinohk Energy Corp’s Initial Project Description for the proposed Black Bear Power Plant Project as requested by the Impact Assessment Agency of Canada in its email of July 25, 2024. Our FAAR response is attached. Our advice is based on ECCC’s mandate under the Species at Risk Act, the Migratory Birds Convention Act, the pollution prevention provisions of the Fisheries Act, and the Canadian Environmental Protection Act, 1999. In the context of Environmental and/or Impact assessments, ECCC provides technical, science- based information and knowledge to support the responsible authority in its assessment of the project’s effects in the receiving environment. Any information or comments received from ECCC in this context does not relieve the proponent of its obligations to comply with all applicable federal Acts and regulations. If you need more information, please contact your one-window contact, Leah Dirk, at (306) 514- 2363 or Leah.Dirk@ec.gc.ca. Please also address electronic correspondence to the ECCC Prairie and Northern Region EA Generic Inbox at EASouthPNR@ec.gc.ca. ...

Report

Attachment Project Initial Summary Project Description

  • Black Bear Power Plant Project
  • Author: Administrator on behalf of Otipemisiwak Métis Government.
  • Reference number: 17
  • Submitted: 2024-08-14 - 5:36 PM
  • Project phase: Planning
  • See the attached submission / Veuillez consulter la pièce ci-jointe 
  • Attachment included
  • August 14th, 2024 Impact Assessment Agency of Canada RE: Comment on the summary of the Initial Project Description for the Black Bear Power Plant Project Project Title/Name Black Bear Power Plant (BBPP) Proponent Kiwetinohk Energy Corp (KEC) Due August 14th 2024 To whom it may concern, The Otipemisiwak Métis Government, as the authorized representative body for the Métis within Alberta, now represents more than 65,000 registered Citizens across the province and stands as the largest single Indigenous collectivity in Alberta. Representing citizens in five territories and twenty-two districts. Recognition of the Otipemisiwak Métis Government as the authorized representative of its citizens is most recently confirmed by the signing of the Métis Nation within Alberta Self‐Government Recognition and Implementation Agreement on February 24, 2023. The Métis homeland, which is encumbered by the Aboriginal rights, claims, and interests of the Métis within Alberta, encompasses the totality of the Province of Alberta. Concerns Based on the initial summary description, there are many concerns still present. The project area for the Black Bear Power Plant (“BBPP”) is located in the Lesser Slave Lake Territory and in District 21 Lesser Slave Lake Métis District. This territory is a critical area for Métis peoples with many records of historical families as well as historic harvesting, hunting, trapping, and fishing. Overarching Comments 1. The route for the natural gas pipeline to fuel the BBPP has still not been provided to us. A new pipeline is of concern to the Otipemisiwak Métis Government and without information on the route placement it is not possible to determine what the potential ...

Report

Attachment Comments on Black Bear Power Plant Project IPD

  • Black Bear Power Plant Project
  • Author: Administrator on behalf of Health Canada
  • Reference number: 20
  • Submitted: 2024-08-14 - 5:14 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited on the Summary of the Initial Project Description
  • See the attached submission / Veuillez consulter la pièce ci-jointe   
  • Attachment included
  • Federal Authority Advice Record (FAAR) FAAR Response must be submitted by August 14, 2024 Black Bear Power Plant Project – Kiwetinohk Energy Corp. Registry File: 88747 Department/Agency Health Canada Lead Contact Ayesha Sohail Full Address Suite 910, 9700 Jasper Ave, Edmonton, Alberta T5J 4G3 Email Ayesha.Sohail@hc-sc.gc.ca Telephone 780-245-5793 Alternate Contact Nicholas Wawryk, Nicholas.Wawryk@hc-sc.gc.ca 1. a) Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function . b) Please describe any Indigenous or public consultation that will be undertaken in relation to the exercise of that power, duty or function, including when it would take place. Not Applicable (NA) 2. Is your department or agency in possession of specialist or expert inf ormation or knowledge in its area of expertise that may be relevant to the conduct of an impact assessment of the project? Specify the specialist or expert information or knowledge. As a federal authority, Health Canada (HC) will provide specialist or expert information and knowledge in the Department’s possession (expertise) to support the assessment of impacts on human health from projects considered individually or cumulatively under the Impact Assessment Act (IAA). It should also be noted that expertise related to assessing human health that is relevant to impact assessment (IA) may be held by other federal, provincial, and municipal partners, reflecting the shared jurisdiction for environmental and human health within Canada. For example, ...

Report

Attachment 2024-08-14_DFO Comments on IPD

  • Black Bear Power Plant Project
  • Author: Administrator on behalf of Fisheries and Oceans Canada
  • Reference number: 15
  • Submitted: 2024-08-14 - 4:21 PM
  • Project phase: Planning
  • See the attached submission / Veuillez consulter la pièce ci-jointe   
  • Attachment included
  • Federal Authority Advice Record (FAAR) FAAR Response must be submitted by August 14, 2024 Black Bear Power Plant Project – Kiwetinohk Energy Corp. Registry File: 88747 Department/Agency Fisheries and Oceans Canada Lead Contact Lisa Wren, Team Leader, Triage and Planning Full Address 867 Lakeshore Road, Burlington, ON L7S 1A1 Email Lisa.Wren@dfo-mpo.gc.ca Telephone 905-973-8392 Alternate Contact Deborah Silver, Deborah.Silver@dfo-mpo.gc.ca 1. a) Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function . A Fisheries Act paragraph 35(2)(b) Authorization will be required if the project is likely to cause the harmful alteration, disruption, or destruction to fish habitat and/or a Fisheries Act paragraph 34.4(2)(b) Authorization if the project is likely to result in the deat h of fish. DFO has reviewed the project information available at this time. There is insufficient information to determine whether the project will result in adverse effects; however, components of the project do have the potential to result in the harmful alteration, disruption or destruction of fish habitat and/or the death of fish, if not conducted in a manner to avoid such adverse effects . As such, the project may require authorization under the Fisheries Act. If an authorization were to be issued, it would include conditions in relation to the aforementioned effects. DFO also reviews projects for effects to listed aquatic species at risk, any part of their critical habitat or the residences of their individuals in a manner ...

Report

Attachment Comments requested on Initial Project Description

  • Black Bear Power Plant Project
  • Author: Administrator on behalf of Natural Resources Canada
  • Reference number: 16
  • Submitted: 2024-08-14 - 3:59 PM
  • Project phase: Planning
  • See the attached submission / Veuillez consulter la pièce ci-jointe 
  • Attachment included
  • UNCLASSIFIED - NON CLASSIFIÉ August 14, 2024 CIAR: 88747 Valerie Coenen Project Manager, Prairie and Northern Region Impact Assessment Agency Submitted by email: BlackBear@iaac-aeic.gc.ca Subject: Natural Resources Canada Comments on the Initial Project Description and Federal Authority Advice Record for Black Bear Power Plan Project Dear Colleague, On July 25, 2024, the Impact Assessment Agency of Canada (the Agency) requested that Natural Resources Canada (NRCan) comment on the Initial Project Description (IPD) and complete the Federal Authority Advice Record (FAAR). NRCan is submitting this response pursuant to section 23 of the Impact Assessment Act. Details of NRCan’s response can be found in Appendix A: Black Bear Power Project, Federal Authority Advice Record. If you have any questions, comments, or concerns, please contact me by email at Natalie.Robinson@nrcan-rncan.gc.ca. Sincerely, Natalie Robinson Impact Assessment Division Office of the Chief Scientist CC: Christina Clarke; Peter Unger Appendix A: Federal Authority Advice Records UNCLASSIFIED - NON CLASSIFIÉ Appendix A: August 14, 2024 Federal Authority Advice Record (FAAR) FAAR Response must be submitted by August 14, 2024 Black Bear Power Plant Project – Kiwetinohk Energy Corp. Registry File: 88747 Department/Agency Natural Resources Canada Lead Contact Natalie Robinson Full Address 580 Booth Street, Ottawa ON K1A 0Y7 Email Natalie.Robinson@nrcan-rncan.gc.ca Telephone 403-483-4587 Alternate Contact Rani Al Anid: Rani.Alanid@nrcan-rncan.gc.ca 1. a) Is it probable that your department or agency may be required to ...

Report

Attachment Comments on Black Bear Power Plant Project IPD

  • Black Bear Power Plant Project
  • Author: Administrator on behalf of Alberta Wilderness Association
  • Reference number: 21
  • Submitted: 2024-08-14 - 12:33 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited on the Summary of the Initial Project Description
  • See the attached submission / Veuillez consulter la pièce ci-jointe   
  • Attachment included
  • "Defending Wild Alberta through Awareness and Action” 455 – 12 Street NW, Calgary, AB T2N 1Y9 Phone 403.283.2025 awa@abwild.ca www.AlbertaWilderness.ca August 14, 2024 Black Bear Power Plant Project Impact Assessment Agency of Canada 9700 Jasper Avenue, Suite 1145 Edmonton, Alberta T5J 4C3 By Email: BlackBear@iaac-aeic.gc.ca RE: Black Bear Power Plant Project The Alberta Wilderness Associa�on (AWA) appreciates the opportunity to provide comments on the Black Bear Power Plant Project proposed south of Swan Hills, Alberta. Founded in 1965, AWA strives to help Albertans understand the intrinsic values that wildlife and wilderness provide, and encourage communi�es to par�cipate in conserva�on ini�a�ves that will ensure a legacy for future genera�ons. With over 7,000 members and supporters in Alberta and across Canada, AWA is dedicated to conserving and protec�ng Alberta’s wilderness. The Black Bear Power Plant Project is proposing to construct a new natural gas power plant, with a capacity of 460 MW that will incorporate carbon capture and storage to reduce greenhouse gas emissions. The project is sited on pine and mixed wood forest that was clearcut in 2005, in an area with extensive oil and gas disturbance. The opera�on of the project will require addi�onal pipeline and transmission line construc�on, the exact loca�ons or which are not yet finalized. AWA does not support con�nued development of natural gas infrastructure. While we appreciate the considera�on given to si�ng this project within a previously disturbed area and minimizing addi�onal disturbance for construc�on of required pipelines and transmission lines, we harbour concerns with the proposed project. Given the ...

Report

Attachment 2024-08-12_WAGE Comments on IPD

  • Black Bear Power Plant Project
  • Author: Administrator on behalf of Federal Authority Advice Record (FAAR)
  • Reference number: 13
  • Submitted: 2024-08-14 - 11:46 AM
  • Project phase: Planning
  • See the attached submission / Veuillez consulter la pièce ci-jointe   
  • Attachment included
  • Federal Authority Advice Record (FAAR) FAAR Response must be submitted by August 14, 2024 Black Bear Power Plant Project – Kiwetinohk Energy Corp. Registry File: 88747 Department/Agency Women and Gender Equality Canada (WAGE) Lead Contact Denise Gareau, Director, GBA Plus Directorate, Research, Data, and Intersectionality (RDI) Branch Full Address 22 Eddy Street, 10th Floor Gatineau, QC J8X 2V6 Email FEGC.EvaluationImpacts-ImpactsAssessment.WAGE@fegc-wage.gc.ca Telephone 819-938-1132 Alternate Contact Jessica Bialek, A/Senior Analyst, GBA Plus Directorate, Research, Data, and Intersectionality (RDI) Branch Jessica.Bialek@fegc-wage.gc.ca 1. a) Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function . b) Please describe any Indigenous or public consultation that will be undertaken in relation to the exercise of that power, duty or function, including when it would take place. 1. a) WAGE does not hold any regulatory power, functions, or duties. 1. b) N/A 2. Is your department or agency in possession of specialist or expert inf ormation or knowledge in its area of expertise that may be relevant to the conduct of an impact assessment of the project? Specify the specialist or expert information or knowledge. WAGE holds expertise in the application of GBA Plus (as intersectional analysis) as well as information related to gender equality, including gender-based violence (GBV). 3. Has your department or agency considered the project; exercised a power or performed a duty or ...
  • Attachment included
  • INITIAL PROJECT DESCRIPTION SUMMARY For the BLACK BEAR POWER PLANT Project Location 19 km south of Swan Hills, Alberta LSDs 1, 2, 6, 7, 8, Section 15, Township 64, Range 11, W5M Proponent Kiwetinohk Energy Corp. Submitted to IMPACT ASSESSMENT AGENCY OF CANADA DOCUMENT COMPLETED BY July 2024 Black Bear Power Plant Initial Project Description Summary i THIS PAGE INTENTIONALLY BLANK Black Bear Power Plant Initial Project Description Summary ii TABLE OF CONTENTS LIST OF TABLES ......................................................................................................................................... VII LIST OF FIGURES ........................................................................................................................................ VII LIST OF APPENDICES ................................................................................................................................ VII LIST OF DEFINED TERMS ........................................................................................................................ VIII LIST OF ACRONYMS ................................................................................................................................. VIII PART A: GENERAL INFORMATION .......................................................................................................... 12 1 PROJECT INFORMATION .................................................................................................................... 12 1.1 Project Location ...
  • Attachment included
  • Prairie and Northern Region Région des Prairies et du Nord Canada Place Place Canada 1145–9700 Jasper Avenue 1145–9700, avenue Jasper Edmonton AB T5J 4C3 Edmonton (Alberta) T5J 4C3 UNCLASSIFIED - NON CLASSIFIÉ July 25, 2024 To: Employment and Social Development Canada; Environment and Climate Change Canada; Fisheries and Oceans Canada; Health Canada; Indigenous Services Canada; Natural Resources Canada; Transport Canada; Women and Gender Equality Dear Colleagues: Subject: Federal Authority Advice Record for the Black Bear Power Plant Project On May 2, 2024, the Government of Canada tabled proposed amendments to the Impact Assessment Act (IAA) through the Budget Implementation Act, 2024, No. 1, to respond to the Supreme Court of Canada’s decision regarding the constitutionality of the IAA. We would like to inform you that on June 20, 2024, the Budget Implementation Act, 2024, No. 1 received Royal Assent and the amended IAA came into force. On July 4, 2024, the Impact Assessment Agency of Canada (IAAC) received the Initial Project Description for the Black Bear Power Plant Project (the Project) from Kiwetinohk Energy Corp. (the Proponent). On July 25, 2024, the Initial Project Description was published on the Canadian Impact Assessment Registry Internet site (the Registry). A 20-day public comment period is scheduled from July 25, 2024, to August 14, 2024. During this period, the public, Indigenous peoples, and other jurisdictions are invited to comment on the Summary of the Initial Project Description. In parallel with this public comment period, IAAC has convened a Federal Review Team for the ...

Report

Attachment Provincial Authority Advice Record Form #1: Authority and Summary of Issues

  • Black Bear Power Plant Project
  • Author: Alberta Utilities Commission (Calgary, AB)
  • Reference number: 6
  • Submitted: 2024-08-13 - 1:27 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited on the Summary of the Initial Project Description
  • Alberta Utilties Commission submission for Black Bear Power Plant Project – Kiwetinohk Energy Corp.
  • Attachment included
  • Provincial Authority Advice Record Form #1: Authority and Summary of Issues Response requested by: August 14, 2024 Black Bear Power Plant Project – Kiwetinohk Energy Corp. CIAR No.: 88747 The Impact Assessment Agency of Canada (IAAC) encourages comments to be submitted via the Submit a Comment feature available on the Project’s Canadian Impact Assessment Registry page (Reference #88747 at Impact Assessment Agency of Canada (iaac-aeic.gc.ca)). Letters and forms can be uploaded using this feature. If you have any difficulties submitting this way, please contact IAAC using the information provided below for assistance. Ministry/Agency: Alberta Utilities Commission Lead Contact Name: Derek Rennie Telephone: 403-592-4522 Address: 600 3 Ave SW Tower 1400, Calgary, AB T2P 0G5 Fax: Email: derek.rennie@auc.ab.ca Please complete this form. 1. Would your ministry/agency participate in the federal impact assessment process for this Project? If so, provide the information of the main point of contact. The AUC will not participate in the federal impact assessment process. 2. Will your jurisdiction be undertaking a review and analysis of the Project? Would your jurisdiction participate in a cooperative review of the project information? The AUC has reviewed the project and the Commission has issued their decision and findings in Decision 28964-D01-2024 (https://efiling- webapi.auc.ab.ca/Document/Get/809080 [attached]). The information considered by the Commission is set out in Sections 4.5.2 and 7.2.1 of the AUC’s Rule007 (https://media.auc.ab.ca/prd-wp- uploads/regulatory_documents/Consultations/Rule007.pdf) and in Rule007 Interim Information Requirements ...
  • Attachment included
  • Permit and Licence 28964-D03-2024 Page 1 of 2 Substation Permit and Licence 28964-D03-2024 Appendix 2 to Decision 28964-D01-2024 Kiwetinohk Energy Corp. Benito 1074S Substation July 12, 2024 Proceeding 28964 Application 28964-A002 Kiwetinohk Energy Corp. (KEC), by Application 28964-A002, registered on April 8, 2024, applied to the Alberta Utilities Commission for approval to construct and operate a substation, designated as Benito 1074S Substation, approximately 24 kilometres southwest of Swan Hills, Alberta. The Commission, pursuant to sections 14, 15 and 19 of the Hydro and Electric Energy Act, approved the application in Decision 28964-D01-20241 and granted to KEC a permit to construct and a licence to operate the substation, subject to the provisions of the Hydro and Electric Energy Act and the Alberta Utilities Commission Act, any regulations made under the acts, any orders made under the acts, the Commission rules made pursuant to the Alberta Utilities Commission Act, and the following terms and conditions: 1. The substation shall be located in the southeast quarter of Section 15, Township 64, Range 11, west of the Fifth Meridian. 2. Specifications of the substation shall include the following: a) one 240/22-kilovolt (kV), 300/400/500-megavolt ampere (MVA) transformer b) one 240-kV circuit breaker c) it shall be enclosed within a secure fence and include other substation equipment as described in the application 3. KEC shall file with the Commission within 30 days of completing the substation, notification to confirm that the substation has been completed and is being operated in accordance with the provisions of this permit and licence. 4. Unless ...
  • Attachment included
  • Approval 28964-D02-2024 Page 1 of 2 Power Plant Approval 28964-D02-2024 Appendix 1 to Decision 28964-D01-2024 Kiwetinohk Energy Corp. Black Bear Combined-Cycle Power Plant July 12, 2024 Proceeding 28964 Application 28964-A001 Kiwetinohk Energy Corp. (KEC), by Application 28964-A001, registered on April 8, 2024, applied to the Alberta Utilities Commission for approval to construct and operate a 460-megawatt (MW) combined-cycle power plant approximately 24 kilometres southwest of Swan Hills. The Commission, pursuant to sections 11 and 19 of the Hydro and Electric Energy Act, approved the application in Decision 28964-D01-2024, 1 and granted to KEC an approval to construct and operate the power plant, subject to the provisions of the Hydro and Electric Energy Act and the Alberta Utilities Commission Act, any regulations made under the acts, any orders made under the acts, the Commission rules made pursuant to the Alberta Utilities Commission Act, and the following terms and conditions: 1. The power plant shall be located in the southeast and southwest quarters of Section 15, Township 64, Range 11, west of the Fifth Meridian. 2. The power plant shall contain one Siemens STG6-9000HL natural gas-fired combustion turbine, one heat recovery steam generator, one Siemens SST-5000 steam turbine. 3. The approval is subject to the following conditions, which have been described in Decision 28964-D01-2024: a. Kiwetinohk Energy Corp. shall file Alberta Environment and Protected Areas’ final Environmental Protection and Enhancement Act industrial application approval with the Commission by October 12, 2024. b. Kiwetinohk Energy Corp. shall file the outcome of any ...
  • Attachment included
  • Decision 28964-D01-2024 Kiwetinokh Energy Corp. Black Bear Combined-Cycle Power Plant and Substation July 12, 2024 Alberta Utilities Commission Decision 28964-D01-2024 Kiwetinokh Energy Corp. Black Bear Combined-Cycle Power Plant and Substation Proceeding 28964 Applications 28964-A001 and 28964-A002 July 12, 2024 Published by the: Alberta Utilities Commission Eau Claire Tower 1400, 600 Third Avenue S.W. Calgary, Alberta T2P 0G5 Telephone: 310-4AUC (310-4282 in Alberta) 1-833-511-4AUC (1-833-511-4282 outside Alberta) Email: info@auc.ab.ca Website: www.auc.ab.ca The Commission may, no later than 60 days from the date of this decision and without notice, correct typographical, spelling and calculation errors and other similar types of errors and post the corrected decision on its website. Decision 28431-D01-2024 (July 12, 2024) i Contents 1 Decision summary ......................................................................................................... 1 2 Introduction .................................................................................................................. 1 2.1 Application details.................................................................................................. 1 3 Discussion and findings ................................................................................................. 3 3.1 Compliance with environmental requirements of Rule 007....................................... 4 3.2 What is the noise impact of the proposed development on the surrounding area? ...... 5 3.3 Reclamation security ...

Report

Attachment ISC to IAAC_FAAR record from Indigenous Services Canada - Black Bear Power Plant

  • Black Bear Power Plant Project
  • Author: Administrator on behalf of Indigenous Services Canada
  • Reference number: 18
  • Submitted: 2024-08-13 - 12:38 PM
  • Project phase: Planning
  • See the attached submission / Veuillez consulter la pièce ci-jointe 
  • Attachment included
  • GCDOCS # 128408726 Federal Authority Advice Record (FAAR) FAAR Response must be submitted by August 14, 2024 Black Bear Power Plant Project – Kiwetinohk Energy Corp. Registry File: 88747 Department/Agency Indigenous Services Canada Lead Contact Greg Bosse (ISC-LEDS) Graham Irvine (ISC-FNIHB) Full Address 9700 Jasper Avenue, Edmonton, Alberta, T5J 4G2 Email Gregory.Bosse@sac-isc.gc.ca Graham.Irvine@sac-isc.gc.ca Telephone Alternate Contact ISC– Lands and Economic Development Sector: ISC-LEDS Contact Name ISC-LEDS Title ISC-LEDS email ISC – First Nations and Inuit Health Branch: Constantine Tikhonov Section Head, Impact Assessment and Health Service constantine.tikhonov@sac-isc.gc.ca 1. a) Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function . Indigenous Services Canada (ISC) will not be required to exercise a power or perform a duty or function related to the Project as it is not responsible for approving or issuing licences, permits or authorizations for the assessments of large, proposed projects. b) Please describe any Indigenous or public consultation that will be undertaken in relation to the exercise of that power, duty or function, including when it would take place. ISC does not anticipate to exercise a power or perform a duty or function related to the Project. 2. Is your department or agency in possession of specialist or expert inf ormation or knowledge in its area of expertise that may be relevant to the conduct of an impact assessment of the ...

Report

Attachment Federal Authority Advice Record - Transport Canada

  • Black Bear Power Plant Project
  • Author: Administrator on behalf of Transport Canada
  • Reference number: 9
  • Submitted: 2024-08-09 - 3:08 PM
  • Project phase: Planning
  • Participation notice: Public Notice - Comments Invited on the Summary of the Initial Project Description
  • See the attached submission / Veuillez consulter la pièce jointe
  • Attachment included
  • Federal Authority Advice Record (FAAR) FAAR Response must be submitted by August 14, 2024 Black Bear Power Plant Project – Kiwetinohk Energy Corp. Registry File: 88747 Department/Agency Transport Canada Lead Contact Holly Poklitar Full Address 344 Edmonton St Winnipeg MB R3B 2L4 Email holly.poklitar@tc.gc.ca Telephone (204) 688-3872 Alternate Contact PNRProgramsEA-ProgrammesEERPN@tc.gc.ca 1. a) Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the project to enable it to proceed? If yes, specify the Act of Parliament and that power, duty or function . b) Please describe any Indigenous or public consultation that will be undertaken in relation to the exercise of that power, duty or function, including when it would take place. Canadian Navigable Waters Act (CNWA) Crossings It is not probable the proposed works crossing waterways (i.e. pipeline and transmission line crossings) on waterways associated with Black Bear Power Plant (BBPP) would require approvals from Transport Canada (TC) under the Canadian Navigable Waters Act (CNWA). Section 21.2.5, Use of Navigable Waters in the Initial Project Description (IPD) states that there are no navigable waters within the BBPP area. TC’s Navigation Protection Program (NPP) has reviewed and affirms this determination. Waterways that are not navigable are not regulated by the CNWA. As such, any works, such as watercourse crossings, in, on, over, under, through or across these waterways do not require a CNWA approval. Intake It is possible, though not probable, that an intake on the Freeman River would require approval under the CNWA. ...

Report

Date submitted Display filters

Filters

Consultation typesDisplay filters

Project phaseDisplay filters

Participation noticesDisplay filters

Date modified: