Sugar Creek Peat Harvesting Project

Comment Search Mobile

Comment Search

Skip to filters

30 results

Attachment FW: Possible Request for Assessment - MIN 295227 - ORG - REFER TO MIN-293107 - Manitoba Eco-Network (MbEN) and Wilderness Committee - Manitoba write in support of Fisher River Cree Nation's (FRCN) designation request for the Sun Gro's Sugar Creek Peat Har

  • Sugar Creek Peat Harvesting Project
  • Author: Administrator on behalf of Manitoba Eco-Network (MbEN) and the Wilderness Committee (Manitoba)
  • Reference number: 6
  • Submitted: 2022-12-22
  • Please see the attached submission. 
  • Attachment included
  • MANITOBA ECO-NETWORK 302 - 583 Ellice Avenue, Winnipeg MB R3B 1Z7 Tel: 204-947-6511 www.mbeconetwork.org 22 December, 2022 Honourable Steven Guilbeault Minister of Environment & Climate Change House of Commons Ottawa, Ontario K1A0A6 Dear Minister Guilbeault: Re: Fisher River Cree Nation request for designating the Sun Gro Expansion. The Manitoba Eco-Network (MbEN) and the Wilderness Committee (Manitoba) are sending this letter to support Fisher River Cree Nation’s (FRCN) request for the federal government to designate the Sun Gro Expansion project under section 9 of the Impact Assessment Act (S.C. 2019, c. 28, s. 1). This project involves the addition of licensed areas to the proponent’s peat mining lease quarry. This is considered a major alteration, and thus requires an application (and assessment) under The Environment Act (C.C.S.M. c. E125). The proposal is currently in the planning stages. As of December 20, there is no application posted on the provincial public registry. This creates a perfect opportunity for the federal government to work with the province to develop a cooperative approach to reviewing this proposal. In doing so, it would be the first designated assessment to be undertaken in the province since the Impact Assessment Act came into force. As you are aware, peat harvesting has significant potential negative impacts. The FRCN letter clearly documents potential negative adverse effects specific to federal jurisdiction, including impacts on wetlands, fish and fish habitat, migratory birds and greenhouse gases. Importantly, this information was compiled from consultation with “FRCN Elders, Traditional Knowledge holders, Resource Users, and other ...

Report

Attachment Natural Resources Canada Submission in Response to the Designation Request for the Sugar Creek Peat Harvesting Project

  • Sugar Creek Peat Harvesting Project
  • Author: Administrator on behalf of Natural Resources Canada
  • Reference number: 13
  • Submitted: 2022-11-16 - 6:07 AM
  • Please see the attached submission
  • Attachment included
  • November 15, 2022 CIAR File No.: 84075 Jennifer Dallaire Project Manager, Prairie and Northern Region Impact Assessment Agency of Canada jennifer.dallaire@iaac-aeic.gc.ca Subject: Natural Resources Canada Submission in Response to the Designation Request for the Sugar Creek Peat Harvesting Project On October 25th, the Impact Assessment Agency of Canada (the Agency) requested that Natural Resources Canada (NRCan) provide information in response to the Designation Request for the Sugar Creek Peat Harvesting Project (the Project) located 20 kilometres southeast of the Fish River Cree Nation, Manitoba. NRCan is responding to this Designation Request pursuant to subsection 13(1) of the Impact Assessment Act. Details of NRCan’s response can be found in the appendix below. If you have any questions, please contact me via e-mail at walker.smith@nrcan-rncan.gc.ca or by phone at (613) 447-2892. Thank you, Walker Smith Environmental Assessment Officer Office of the Chief Scientist cc: Peter Unger – Director (A), Impact Assessment Division <Original signed by> https://iaac-aeic.gc.ca/050/evaluations/proj/84075 mailto:jennifer.dallaire@iaac-aeic.gc.ca mailto:walker.smith@nrcan-rncan.gc.ca Page 2 of 4 ATTACHMENT October 25, 2022 Federal Authority Advice Record: Designation Request under IAA Response due by November 15, 2022 Sugar Creek Peat Harvesting Project Department/Agency Natural Resources Canada Lead Contact Walker Smith, Environmental Assessment Officer, Office of the Chief Scientist Full Address 588 Booth Street, Ottawa, ON, K1A 0E4 Email walker.smith@nrcan-rncan.gc.ca ...

Report

Attachment RE: ACTION: IAAC Request for Input, Designation Request of the Sugar Creek Peat Harvesting Project - Due November 4, 2022

  • Sugar Creek Peat Harvesting Project
  • Author: Administrator on behalf of Manitoba Environment, Climate and Parks
  • Reference number: 18
  • Submitted: 2022-11-15 - 5:09 PM
  • Please see the attached submission
  • Attachment included
  • ATTACHMENT: October 25, 2022 Provincial Advice Record: Designation Request under IAA Response requested by November 15, 2022 Sugar Creek Peat Harvesting Project Ministry Environment, Climate and Parks / Natural Resources and Northern Development Lead Contact Bryce Wood / Lee Fedorchuk Full Address Email Bryce.Wood@gov.mb.ca / Lee.Fedorchuk@gov.mb.ca Telephone 204-781-7226 / 204-782-3485 Alternate Ministry Contact Please fill out the form in relation to the proposed Sugar Creek Peat Harvesting Project. 1. In general terms, please confirm and describe your ministry’s role (if applicable) in the review of the Project. A proposal has not been submitted for this project. Environmental Approvals Branch assesses peat harvesting proposals for environmental impacts and may issue an Environment Act licence for the development. Forestry and Peatlands Branch issues Peat Harvesting Licences (PHL). A PHL has already been issued for Sugar Creek. Forestry and Peatlands Branch requires and reviews Peatlands Management Plans and Peatlands Recovery Plans from the proponent. Copies of Sun Gro’s Management and Recovery plans for Sugar Creek have been shared with IAAC. 2. Please provide the contact information of the person or persons responsible for managing your ministry’s oversight of the Project (if different from lead contact above). Same as above. 3. Describe the provincial legislative or regulatory process or approvals administered by your ministry that may assess or manage the potential adverse effects of the Project. For each mechanism or approval, please provide information regarding the following:  Name of the process or authorization (e.g. certificate, ...

Report

Attachment Designation Request for Sugar Creek Peat Harvesting

  • Sugar Creek Peat Harvesting Project
  • Author: Administrator on behalf of Environment and Climate Change Canada
  • Reference number: 14
  • Submitted: 2022-11-15 - 5:08 PM
  • Please see the attached submission
  • Attachment included
  • Environmental Protection Operations Directorate Prairie & Northern Region ECCC File: 4194-10-4/3308 9250 49 Street Edmonton, AB T6B 1K5 IAAC Registry: 84075 November 15, 2022 via email at: pnr-rpn@cnsc-ccsn.gc.ca Jennifer Dallaire Impact Assessment Agency of Canada 1145-9700 Jasper Avenue Edmonton, AB T5J 4C3 Dear Jennifer Dallaire, RE: Designation Request for the Proposed Sugar Creek Peat Harvesting Project under the Impact Assessment Act ECCC has reviewed the information provided for the above-noted project (the Project) as requested by the Impact Assessment Agency of Canada’s (The Agency) October 25, 2022 letter. Our advice is based on ECCC’s mandate in the context of the Species at Risk Act (SARA), the Migratory Birds Convention Act 1994 (MBCA), the pollution prevention provisions of the Fisheries Act, and the Canadian Environmental Protection Act 1999 (CEPA). Should you require further information, please contact Jordan Hollman at jordan.hollman@ec.gc.ca or the ECCC Prairie and Northern Region EA Generic Inbox at EASouthPNR@ec.gc.ca. Sincerely, Margaret Fairbairn A/Regional Director Environmental Protection and Operations Directorate Prairie Northern Region cc: Gayle Hatchard, A/Head, EA PNR-South, EPOD Jordan Hollman, Environmental Assessment Officer, EA PNR-South, EPOD Cari-Lyn Epp, Senior Environmental Assessment Officer, EA PNR-South, EPOD <Original signed by> mailto:jordan.hollman@ec.gc.ca mailto:EASouthPNR@ec.gc.ca
  • Attachment included
  • ATTACHMENT Federal Authority Advice Record: Designation Request under IAA Sugar Creek Peat Harvesting Project Department/Agency Environment and Climate Change Canada (ECCC) Lead Contact Jordan Hollman, Environmental Assessment Officer Full Address 9250 49 St. NW Edmonton, AB, T6B 1K5 Email jordan.hollman@ec.gc.ca Telephone 587-220-6620 Alternate Departmental Contact Cari-Lyn Epp, Senior Environmental Assessment Officer cari-lyn.epp@ec.gc.ca 306-491-2372 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? Specify as appropriate. ECCC has not previously considered the Project, exercised a power or performed a duty, or taken any course of action as part of the Project. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify that power, duty or function and its legislative source. Based on the available information, ECCC does not expect that it will be required to exercise a power or perform a duty or function related to the Project to enable it to proceed. Once the scope of the Project and of the assessment are established by the Agency, this may change as additional activities or Project components could come into scope. Information on the Migratory Birds Convention Act 1994 (MBCA) and Species at Risk Act (SARA) are provided below. With regards to the ...

Report

Attachment Federal Authority Advice Record - Transport Canada

  • Sugar Creek Peat Harvesting Project
  • Author: Administrator on behalf of Transport Canada
  • Reference number: 4
  • Submitted: 2022-11-15 - 5:07 PM
  • Please see the attached submission. 
  • Attachment included
  • ATTACHMENT October 25, 2022 Federal Authority Advice Record: Designation Request under IAA Response due by November 15, 2022 Sugar Creek Peat Harvesting Project Department/Agency Transport Canada Lead Contact Holly Poklitar Full Address Winnipeg Email holly.poklitar@tc.gc.ca Telephone (204) 688-3872 Alternate Departmental Contact adam.downing@tc.gc.ca 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? Specify as appropriate. Transport Canada has not previously considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify that power, duty or function and its legislative source. Transport Canada (TC) may be required to exercise a power or perform a duty or function , but there is not enough information to decide. The proponent is requested to inform Transport Canada whether or not the access road will cross any navigable waterways. Approval may be required under the Canadian Navigable Waters Act (CNWA) for access road crossings, should any infrastructure impact the ...

Report

Attachment Federal Authority Advice Record - Indigenous Services Canada

  • Sugar Creek Peat Harvesting Project
  • Author: Administrator on behalf of Indigenous Services Canada
  • Reference number: 12
  • Submitted: 2022-11-15 - 11:35 AM
  • Please see the attached submission. 
  • Attachment included
  • GCDOCS # 106798231 ATTACHMENT October 25, 2022 Federal Authority Advice Record: Designation Request under IAA Response due by November 15, 2022 Sugar Creek Peat Harvesting Project Department/Agency Indigenous Services Canada Lead Contact Shelly Johnson Full Address 365 Hargrave St., Winnipeg MB R2B 3A3 Email shelly.johnson@sac-isc.gc.ca Telephone 204-227-3891 Alternate Departmental Contact Debra Nkusi, Senior Analyst, First Nations and Inuit Health Branch Debra.Nkusi@sac-isc.gc.ca 613 301-1443 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? Indigenous Services Canada (ISC) has considered an interest in the Project related to impacts on Indigenous peoples, impacts to traditional territory and reserve lands and the rights of Indigenous peoples. ISC has not exercised a power or performed a duty or function under any Act of Parliament in relation to the Project or taken any course of action that would allow the Project to proceed in whole or in part. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? ISC will not exercise a power or perform a duty or function related to the Project and therefore, is not responsible for approving or issuing licences, permits or authorizations for this proposed project. 3. If your department or agency will exercise a power or ...

Report

Attachment Sugar Creek Peat Harvesting Project - Designation Request - Health Canada

  • Sugar Creek Peat Harvesting Project
  • Author: Administrator on behalf of Health Canada
  • Reference number: 15
  • Submitted: 2022-11-15 - 11:34 AM
  • Please see the attached submission
  • Attachment included
  • 1 Environmental Health Program (EHP) Regulatory Operations & Enforcement Branch (ROEB) Health Canada 140-391 York Ave Winnipeg, MB R3C 4W1 November 15, 2022 Jennifer Dallaire Project Manager, Prairie and Northern Region Impact Assessment Agency of Canada Submitted to the Impact Assessment Agency of Canada Registry for the Sugar Creek Peat Harvesting Project Subject: Health Canada’s Request for Input on the Designation Request of the Sugar Creek Peat Harvesting Project Dear Jennifer Dallaire, Thank you for your email dated October 25, 2022 requesting Health Canada’s comments on the designation request for the Sugar Creek Peat Harvesting Project. Health Canada participates in the impact assessment process as a federal authority under the Impact Assessment Act, upon request. Health Canada makes available specialist/expert information or knowledge in their possession to responsible authorities and review panels, among others. Health Canada does not make decisions or issue licenses, permits, or authorizations in relation to the impact assessment of a development project. Health Canada has provided its comments for your consideration in the attached document. Should you have any questions concerning Health Canada’s comments, please contact the undersigned. Sincerely, David Kitchen Regional Manager – Manitoba/Saskatchewan Region, EHP ROEB, Health Canada david.kitchen@hc-sc.gc.ca cc: Heather Jones-Otazo, Acting Manager, Environmental Assessment and Contaminated Sites (EACS) Division, Healthy Environments and Consumer ...
  • Attachment included
  • ATTACHMENT October 25, 2022 Federal Authority Advice Record: Designation Request under IAA Response due by November 15, 2022 Sugar Creek Peat Harvesting Project Department/Agency Health Canada Lead Contact David Kitchen Full Address 140-391 York Ave. Wpg, MB R3C 4W1 Email David.Kitchen@hc-sc.gc.ca Telephone 431-275-3401 Alternate Departmental Contact Cassidy Dutchak (Cassidy.Dutchak@hc-sc.gc.ca) 431-275-3401 Julie Anderson (Julie.C.Anderson@hc-sc.gc.ca) 431-338-5307 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? Specify as appropriate. No 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify that power, duty or function and its legislative source. No 3. If your department or agency will exercise a power or perform a duty or function under any Act of Parliament in relation to the Project, will it involve public and Indigenous consultation? Specify as appropriate. Not applicable 4. Is your department or agency in possession of specialist or expert information or knowledge that may be relevant to any potential adverse effects within federal jurisdiction caused by the Project or adverse direct or incidental effects stemming from the Project? Specify as appropriate. As a federal authority, Health Canada will provide specialist or ...

Report

Attachment SunGro Sugar Creek Peak Harvesting Project - Response to IAAC Information Request - KGS Group Transmittal No. 22-0293-003-0007

  • Sugar Creek Peat Harvesting Project
  • Author: Administrator on behalf of KGS Group
  • Reference number: 11
  • Submitted: 2022-11-15 - 11:22 AM
  • Please see the attached submission.
  • Attachment included
  • 22-0293-003 | November 14, 2022 1 November 14, 2022 Impact Assessment Agency of Canada Prairie and Northern Region Suite 1145, 9700 Jasper Avenue Edmonton, Alberta T5J 4C3 Attention: Jennifer Dallaire Project Manager Re: Response to IAAC Information Request Sun Gro Sugar Creek Peat Harvesting Project Dear Jennifer Dallaire: Kontzamanis Graumann Smith MacMillan Inc. (KGS Group) is submitting this letter on behalf of Sun Gro Horticulture Canada Ltd. (Sun Gro) in response to the Impact Assessment Agency of Canada’s (IAAC) request for additional information regarding the proposed Sugar Creek Peat Harvesting Project (the Project). The information provided in this letter is in response to your letter dated October 25, 2022. In particular, the information addresses the comments and questions submitted to IAAC in the October 14, 2022, letter from Fisher River Cree Nation (FRCN). 1 . 0 I A AC I N F OR M A T I ON R EQU EST 1 Details about the proposed Project components, activities and timelines are still being developed along with collecting information on land tenure and zoning. This information will be provided in the Environment Act Proposal (EAP) required to obtain the Environment Act Licence (EAL) for the Project. The EAP is in the process of being prepared to be submitted to Manitoba Environment, Climate and Parks (MECP). A copy of the EAP once completed and submitted will be available for download from the Environmental Assessment and Licensing Public Registry (Environmental Assessment and Licensing Branch | Environment, Climate and Parks | Province of Manitoba (gov.mb.ca)). A summary of the key items, based on what has been preliminarily developed, along with ...

Report

Attachment Federal Authority Advice Record - Indigenous Services Canada First Nations and Inuit Health Branch

  • Sugar Creek Peat Harvesting Project
  • Author: Administrator on behalf of Indigenous Services Canada - First Nations and Inuit Health Branch
  • Reference number: 8
  • Submitted: 2022-11-14 - 2:46 PM
  • Please see the attached submission. 
  • Attachment included
  • ATTACHMENT October 25, 2022 Federal Authority Advice Record: Designation Request under IAA Response due by November 15, 2022 Sugar Creek Peat Harvesting Project Department/Agency Indigenous Services Canada Lead Contact Debra Nkusi Full Address 200 Eglantine Driveway, Ottawa, Ont K1A 0K9 Email Debra.Nkusi@sac-isc.gc.ca Telephone 613 301-1443 Alternate Departmental Contact Constantine.Tikhonov@sac-isc.gc.ca 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? No 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? ISC/FNIHB is not responsible for funding, approving or issuing licences, permits or authorizations for the assessments of this proposed project 3. If your department or agency will exercise a power or perform a duty or function under any Act of Parliament in relation to the Project, will it involve public and Indigenous consultation? No 4. Is your department or agency in possession of specialist or expert information or knowledge that may be relevant to any potential adverse effects within federal jurisdiction caused by the Project or adverse direct or incidental effects stemming from the Project? FNIHB has specialized knowledge pertaining to First Nations people. Areas of expertise include but are not limited to: the provision of health ...

Report

Attachment Federal Authority Advice Record - Women and Gender Equality Canada (WAGE)

  • Sugar Creek Peat Harvesting Project
  • Author: Administrator on behalf of Women and Gender Equality Canada (WAGE)
  • Reference number: 9
  • Submitted: 2022-11-14 - 1:47 PM
  • Please see the attached submission. 
  • Attachment included
  • ATTACHMENT October 25, 2022 Federal Authority Advice Record: Designation Request under IAA Response due by November 15, 2022 Sugar Creek Peat Harvesting Project Department/Agency Women and Gender Equality Canada (WAGE) Lead Contact Denise Gareau, Director, GBA Plus Directorate, Research Results & Delivery and Center of Expertise Branch Full Address 22 Eddy, Gatineau, QC Email FEGC.EvaluationImpacts-ImpactsAssessment.WAGE@fegc-wage.gc.ca Telephone 819-938-1132 Alternate Departmental Contact Jessica Bialek, Analyst, GBA Plus Directorate, Research Results & Delivery and Center of Expertise Branch – Jessica.Bialek@fegc- wage.gc.ca 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? No. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? WAGE does not hold any regulatory power, functions, or duties. 3. If your department or agency will exercise a power or perform a duty or function under any Act of Parliament in relation to the Project, will it involve public and Indigenous consultation? N/A 4. Is your department or agency in possession of specialist or expert information or knowledge that may be relevant to any potential adverse effects within federal jurisdiction caused by the Project or adverse direct or incidental effects stemming from the Project? ...

Report

Attachment DFO FAAR Form submission - Sugar Creek Peat Harvesting Project

  • Sugar Creek Peat Harvesting Project
  • Author: Administrator on behalf of Fisheries and Oceans Canada
  • Reference number: 17
  • Submitted: 2022-11-14 - 1:23 PM
  • Please see the attached submission
  • Attachment included
  • ATTACHMENT October 25, 2022 Federal Authority Advice Record: Designation Request under IAA Response due by November 15, 2022 Sugar Creek Peat Harvesting Project Department/Agency Fisheries and Oceans Canada Lead Contact Amelia Corrigan Full Address 1028 Parsons Road SW, Edmonton AB T6X 0J4 Email Amelia.corrigan@dfo-mpo.gc.ca Telephone 587-335-8408 Alternate Departmental Contact Brandi Mogge (587)926-6154 Brandi.mogge@dfo-mpo.gc.ca 1. Has your department or agency considered whether it has an interest in the Project; exercised a power or performed a duty or function under any Act of Parliament in relation to the Project; or taken any course of action (including provision of financial assistance) that would allow the Project to proceed in whole or in part? Specify as appropriate. Fisheries and Oceans Canada (DFO) has not taken any actions that would allow the project to proceed in whole or in part. 2. Is it probable that your department or agency may be required to exercise a power or perform a duty or function related to the Project to enable it to proceed? If yes, specify that power, duty or function and its legislative source. DFO may issue a Fisheries Act paragraph 35(2)(b) Authorization if the project is likely to cause the harmful alteration, disruption, or destruction (HADD) of fish habitat and/or if the project is likely to result in the death of fish (DoF). Based on the information provided by the Agency it is unclear at this time the scale and extent of HADD or DoF. Additional fish and fish habitat, and flow data for all watercourses impacted by the project would be required to fully assess impacts. If it is determined that an IA is not ...

Report

Attachment RE: IAACRequest for Input, Designation Request of the Sugar Creek Peat Harvesting Project - Due November 15, 2022

  • Sugar Creek Peat Harvesting Project
  • Author: Administrator on behalf of Natural Resources & Northern Development - Forestry & Peatlands Branch
  • Reference number: 16
  • Submitted: 2022-11-10 - 4:41 PM
  • Please see the attached submission
  • Attachment included
  •                          Peat Harvest Licence No. 4 – South Washow  Peatland Recovery Plan                              1  September, 2019  Issued for Approval  Dan Leitch  Shaun Moffatt  Tim North  0  June, 2018  Issued for Review  Ingrid Hallin  Brett Bodeux  Tim North  Revision Rev.Date Revision Memo Prepared by Checked by Approved by   Page i  Sun Gro Horticulture Canada Ltd.  Peat Harvest Licence No. 4 – South Washow    Peatland Recovery Plan September 2019  Table of Contents  1.0 Introduction ..................................................................................................................... 1 1.1  Project Overview ..................................................................................................................................... 1 1.2  Background ............................................................................................................................................. 1 2.0 Baseline Information ........................................................................................................ 1 2.1  Pre‐disturbance Site Conditions ............................................................................................................... 1 2.1.1 Ramsay Point ..................................................................................................................................... 1 2.1.2 Sugar Creek A ..................................................................................................................................... 2 2.1.3  Sugar Creek B ..................................................................................................................................... 2 2.1.4 ...

Report

Attachment RE: IAAC Request for Input, Designation Request of the Sugar Creek Peat Harvesting Project - Due November 15, 2022

  • Sugar Creek Peat Harvesting Project
  • Author: Administrator on behalf of Government of Manitoba
  • Reference number: 7
  • Submitted: 2022-11-10 - 4:30 PM
  • Please see the attached submission. 
  • Attachment included
  •                          Peat Harvest Licence No. 4 – South Washow  Peatland Management Plan                              1  September, 2019  Issued for Approval  Dan Leitch  Shaun Moffatt  Tim North  0  June, 2018  Issued for Review  Jasmine Lamarre  Brett Bodeux  Tim North  Revision Rev.Date Revision Memo Prepared by Checked by Approved by     Page i  Sun Gro Horticulture Canada Ltd.  Peat Harvest Licence No. 4 ‐ South Washow  Peatland Management Plan September 2019  Table of Contents  1.0 Introduction ..................................................................................................................... 1 1.1  Project Overview ......................................................................................................................................................... 1 1.2  Background ................................................................................................................................................................. 1 1.3  Stakeholder Engagement ............................................................................................................................................ 1 1.4  Effects and Mitigations ................................................................................................................................................ 2 2.0 Corporate Overview ......................................................................................................... 2 2.1  Corporate Planning Objectives .................................................................................................................................... 2 2.2  ...

Report

Attachment RE: IAAC - Sun Gro Sugar Creek Peat Harvesting Project

  • Sugar Creek Peat Harvesting Project
  • Author: Administrator on behalf of Shaun Moffatt
  • Reference number: 10
  • Submitted: 2022-10-24 - 3:15 PM
  • Jennifer Your understanding is correct that Sun Gro will not be diverting water from a natural water body to another natural water body. They will be constructing drainage ditches within the Sugar Creek Bog Sub Areas B, C, D, and E to reduce the water saturation within the perched groundwater within the peat to allow for peat harvesting.   The attached .kmz file provides the outline of the four Sub Areas, which are all located on Provincial Crown Land. KGS Group is in the process of preparing the Environment Act Proposal to obtain the required Environment Act Licence for peat harvesting. While we have completed the baseline water quality and biological surveys we are still in the process of preparing the project description, environmental assessment and public/Indigenous engagement. As such at this time I can only provide high level details as you requested.   The main project components will include: an access road from PR 325 to Sub Area C a staging area within Sub Area 3 bog roads within and connecting the Sub Areas drainage ditch system in the areas with harvestable peat within each Sub Area sedimentation ponds and an outlet ditch with a gated culvert which discharges drainage water to the southeast, which will eventually reach an existing drainage ditch south of the site.   Major project activities include constructing the access and bog roads, clearing vegetation and surface soils, excavating and trenching drainage ditches, harvesting and stockpiling unprocessed peat, transporting and restoring harvested peatland.   Here are some additional details to help you ...

Report

Date submitted Display filters

Filters

Date modified: