Draft outline in support of the corridor into the ROF.

Reference Number
39
Text

The input assembled in the attached scheduals will summarize  4 specific challenges that may impact the designing of an access route into the ROF. Controversial impacts are merely studies that will inevitably coexist with the construction phase. Although at any rate, what this project needs now are boots on the ground. I am in support of correct progression that would enable an access route for extraction of minerals in the ring of fire area. Scheduals 1-6 are included in the attached documentation which I hope will address the anticipated difficulties that pre-empt completion of a throughway.

Submitted by
Abel Abbet
Phase
N/A
Public Notice
N/A
Attachment(s)
  • Attachment ROF 80468.pdf (57.2 KB)
  • Comment Tags
    Noise Climate change Accidental Events / Malfunctions Seismic / Volcanic Activity General support of project Wetlands Indigenous Knowledge
    Date Submitted
    2021-02-23 - 9:05 PM
    Date modified: