Project Amisk Hydroelectric Project

  • Location (Peace River, Alberta)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: In progress
  • Reference Number: 80112
  • Last Modified: 2020-06-24
  • Relevance: 207953.15
  • AHP Development Corporation is proposing to construct and operate a 330-megawatt hydroelectric facility on the Peace River, approximately 15 kilometres upstream of Dunvegan, in northwestern Alberta.As proposed, the Amisk Hydroelectric Project would generate approximately 1,875 gigawatt hours of electricity per year.

Project More Creek Hydroelectric Project

  • Location (Approximately 130 kilometres north of Stewart, British Columbia)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: Terminated
  • Reference Number: 80131
  • Last Modified: 2022-08-29
  • Relevance: 206041.06
  • Alaska Hydro Corporation, a British Columbia based company, is proposing to construct and operate a 75-megawatt hydroelectric facility with reservoir storage, approximately 130 kilometres north of Stewart, in British Columbia, and 95 kilometres east of the Alaskan border.As proposed, the More Creek Hydroelectric Project would generate approximately 348 gigawatt hours of electricity per year, and its reservoir storage area would cover approximately 2,680 hectares of the More Creek drainage area basin.

Project Chaudière Crossing: Southern Structures Renewal (SSR)

  • Location (Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 85917
  • Last Modified: 2023-10-15
  • Relevance: 124696.15
  •   The Chaudière Crossing, made of up of eight structures, passes over the Ottawa River and several hydroelectric waterways.Ottawa hydroelectric power commission channel span and Buchanan channel span: minor repairs to secondary component (e.g., railings, bearings, lighting components).

Project Maintenance of the DUR226 distribution line by Hydro-Québec in the MNLP, St-Jean-des-Piles sector at Rivière-à-la-Pêche

  • Location (La Mauricie National Park, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80978
  • Last Modified: 2021-04-12
  • Relevance: 111551.93
  • The hydroelectric facilities maintenance project involves the clearing of the electrical distribution line to the Rivière-à-la-Pêche sector by Hydro-Québec in order to ensure the security and stability of the supply.

Archive Romaine Hydroelectric Complex Project (Archived)

  • Location (Romaine, Rivière, Quebec)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 1992
  • Status: Completed
  • Reference Number: 04-05-2613
  • Last Modified: 2004-04-23
  • Relevance: 77467.75
  • Archived - Romaine Hydroelectric Complex Project Romaine, Rivière (QC) Reasons for a Federal Assessment Project Description Environmental Assessment Report Government Response to Panel Final Decision Follow-up Program Reference Numbers Canadian Environmental Assessment Registry: 04-05-2613 Fisheries and Oceans Canada: 03HQUELZ3000000181 Environmental Assessment Type Panel Other Assessment Process Government of Québec Responsible or Regulated Authorities Fisheries and Oceans Canada Transport Canada Reasons for a Federal Assessment On April 23, 2004, it was determined that an environmental assessment was required in relation to the project because Fisheries and Oceans Canada considered taking action in relation to subsection 35(2) of the Fisheries Act and Transport Canada considered taking action in relation to paragraph 5(1)(a) of the Navigable Waters Protection Act.Environmental Assessment Report Environmental Assessment Report Government Response to Panel Government of Canada's Response to the Environmental Assessment Joint Review Panel Report of the Proposed La Romaine Hydroelectric Complex Project Final Decision In conformity with the approval of the Governor in Council, a decision was taken on May 13, 2009 and was that the authorities may exercise any power or perform any duty or function with respect to the project because, after taking into consideration the report of the review panel and taking into account the implementation of appropriate mitigation measures, the authorities are of the opinion that the project is not likely to cause significant adverse environmental effects.

Archive Lower Churchill Hydroelectric Generation Project (Archived)

  • Location (Happy Valley-Goose Bay, Newfoundland and Labrador)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 1992
  • Status: Completed
  • Reference Number: 07-05-26178
  • Last Modified: 2007-02-07
  • Relevance: 76833.17
  • Project Description (as posted in the Notice of Commencement) Nalcor Energy proposes to construct and operate two hydroelectric power generating facilities on the lower section of the Churchill River in Labrador.The project consists of hydroelectric generating facilities at Gull Island and Muskrat Falls, and interconnecting transmission lines to the existing Labrador grid.Environmental Assessment Report Report of the Joint Review Panel - Summary Lower Churchill Hydroelectric Generation Project: Report of the Joint Review Panel Government Response to Panel Government of Canada Response to the Report of the Joint Federal-Provincial Review Panel for Nalcor's Lower Churchill Generation Project in Newfoundland and Labrador Final Decision In conformity with the approval of the Governor in Council, a decision was taken on March 15, 2012 and was that the authorities may exercise any power or perform any duty or function with respect to the project because, after taking into consideration the report of the review panel and taking into account the implementation of appropriate mitigation measures, the authorities are of the opinion that the project is likely to cause significant adverse environmental effects that can be justified in the circumstances.

Archive Glacier Power Ltd.'s Dunvegan Hydroelectric Project (Archived)

  • Location (Dunvegan Provincial Park, Alberta) (Dunvegan Provincial Park, Alberta)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 1992
  • Status: Completed
  • Reference Number: 04-07-2996
  • Last Modified: 2004-05-12
  • Relevance: 71141.8
  • s Dunvegan Hydroelectric Project Dunvegan Provincial Park; Dunvegan Provincial Park (AB) Reasons for a Federal Assessment Project Description Environmental Assessment Report Government Response to Panel Final Decision Follow-up Program Reference Numbers Canadian Environmental Assessment Registry: 04-07-2996 Fisheries and Oceans Canada: 04HCAACA1000001180 Environmental Assessment Type Joint panel Other Assessment Process Government of Alberta Responsible or Regulated Authorities Fisheries and Oceans Canada Transport Canada Reasons for a Federal Assessment On May 12, 2004, it was determined that an environmental assessment was required in relation to the project because Fisheries and Oceans Canada considered taking action in relation to subsection 35(2) of the Fisheries Act and Transport Canada considered taking action in relation to paragraph 5(1)(a) of the Navigable Waters Protection Act.Project Description (as posted in the Notice of Commencement) A RUN -OF-RIVER HYDROELECTRIC PROJECT LOCATED ON THE PEACE RIVER APPROXIMATELY TWO (2) KILOMETRES UPSTREAM OF THE HIGHWAY 2 BRIDGE CROSSING AT DUNVEGAN IN THE PROVINCE OF ALBERTA The scope of project will be added when available.Environmental Assessment Report Environmental Assessment Report Government Response to Panel The Government of Canada's Response to the Environmental Assessment Report of the Joint Review Panel on the Dunvegan Hydroelectric Project Final Decision In conformity with the approval of the Governor in Council, a decision was taken on May 6, 2009 and was that the authorities may exercise any power or perform any duty or function with respect to the project because, after taking into consideration the report of the review panel and taking into account the implementation of appropriate mitigation measures, the authorities are of the opinion that the project is not likely to cause significant adverse environmental effects.

Project Bala North Dam Waterpower, Lake Muskoka, Township of Muskoka Lakes

  • Location (Bala, Ontario)
  • Assessment Type: Screening-type assessment under CEAA 1992
  • Status: Terminated
  • Reference Number: 46531
  • Last Modified: 2013-07-18
  • Relevance: 60411.37
  • Swift River Energy is proposing the construction and operation of a 4.3 MW hydroelectric generating facility approximately 25 m south of the existing North Bala Dam on the Moon River in the village of Bala, Ontario, including the installation of a temporary coffer dam and blasting through bedrock to create an approximately 30 m long intake/approach channel in Muskoka Lake, the installation of a second temporary coffer dam and blasting and excavation of an approximately 20m long tailrace channel in the Moon River, and the diversion of flows through the new facility.

Project Drainage infrastructure improvements - Weirs, siphons and ditch

  • Location (Chambly Canal National Historic Site, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80518
  • Last Modified: 2020-05-27
  • Relevance: 52522.33
  • Weir 3 The work planned at Weir 3 includes repairing concrete, painting steel components, demolishing and/or reinforcing unstable concrete components of the old hydroelectric plant, replacing current engines, improving the existing control panel used to open gates and performing electrical work.

Document Notice - Transition of Decision Statements under section 306 of the Budget Implementation Act, 2024

  • Project Elizabeth Falls Hydroelectric Project
  • Document Category: Additional Information
  • Reference Number: 41
  • Updated: 2024-07-18
  • Document: 158130E.html
  • Relevance: 51085.69
  • Newfoundland Offshore Exploration Drilling Project Flemish Pass Exploration Drilling Project Goliath Gold Project Hardrock Gold Mine Project Howse Property Iron Mine Project Jackpine Mine Expansion Project Jeanne d'Arc Basin Exploration Drilling Project (ExxonMobil) Jeanne d'Arc Basin Exploration Drilling Project (Husky) Kemess Underground Project LNG Canada Export Terminal Project Milton Logistics Hub Project Newfoundland Orphan Basin Exploration Drilling Project Pacific NorthWest LNG Project Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation Contrecoeur Port Terminal Expansion Project Rose Lithium – Tantalum Mining Project Marine Terminal Project on the North Shore of the Saguenay Rainy River Project Red Mountain Underground Gold Project Roberts Bank Terminal 2 Project Scotian Basin Exploration Drilling Project Shelburne Basin Venture Exploration Drilling Project Site C Clean Energy Project Springbank Off-Stream Reservoir Project Tazi Twé Hydroelectric
1 alternate format found
French HTML
  • Relevance: 42461.21
  • Avis — Transition des déclarations de décision au titre de l'article 306 de la Loi d'exécution du budget de 2024 18 juillet 2024 Le ministre de l'Environnement a déterminé, conformément à l'article 306 de la Loi d'exécution du budget de 2024, que les déclarations de décision émises pour les 36 projets désignés énumérés ci-dessous contiennent des conditions qui auraient pu être incluses dans une déclaration de décision publiée en vertu du paragraphe 65(1) de la Loi sur l'évaluation d'impact ...

Project KSM (Kerr-Sulphurets-Mitchell) Project

  • Location (Casey Point, British Columbia)
  • Assessment Type: Comprehensive study under CEAA 1992
  • Status: Completed
  • Reference Number: 49262
  • Last Modified: 2015-01-08
  • Relevance: 45444.7
  • Waste rock storage dumps, an ore grinding circuit, water storage facility, water treatment plant, selenium treatment plant, several small hydroelectric projects, diversion tunnels, access roads, camp facilities, explosives factory and magazine, and supporting infrastructure would also be located at the Mine Site.

Document Notice of Termination

  • Project More Creek Hydroelectric Project
  • Document Category: Additional Information
  • Reference Number: 13
  • Updated: 2022-08-29
  • Document: 144977E.html
  • Relevance: 44448.44
  • Notice of Termination Ottawa – August 29, 2022 – In accordance with section 181(3) of the Impact Assessment Act, the environmental assessment of the More Creek Hydroelectric Project pursuant to the Canadian Environmental Assessment Act, 2012, has terminated.
1 alternate format found
French HTML
  • Relevance: 37289.94
  • Avis de cessation Ottawa – 29 août 2022 – Conformément au paragraphe 181(3) de la Loi sur l'évaluation d'impact, l'évaluation environnementale du projet hydroélectrique More Creek en vertu de la Loi canadienne sur l'évaluation environnementale (2012) a pris fin. Conformément au paragraphe 181(2) de la Loi sur l'évaluation d'impact, Alaska Hydro Corporation n'a pas fourni à l'Agence d'évaluation d'impact du Canada les renseignements ou les études demandés dans le délai prescrit par la loi, ...

Last UpdatedDisplay Filters

Filters

Date modified: