Project Milton Logistics Hub Project

  • Location (Milton, Ontario)
  • Assessment Type: Environmental assessment by Review Panel under CEAA 2012
  • Status: Completed
  • Reference Number: 80100
  • Last Modified: 2025-10-10
  • Relevance: 71584.71
  • The Canadian National Railway Company is proposing the construction and operation of a logistics hub, designed to transfer containers between trucks and railcars. The project would include a railway yard with more than 20 kilometres of track and be located in Milton, Ontario, about 50 kilometres west of Toronto.

Document Updated Decision Statement

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1143
  • Document Date: 2025-09-03
  • Document: 163036E.pdf
  • Relevance: 33614.04
  • , Document Number 57); the revised conceptual design of the Lower Base Line Grade Separation, as described by the Proponent in response to IR3.45 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 613); the implementation of conditions 5.1, 5.2, 6.1, 6.2, 7.3, 8.3, 8.5 and 8.31; the fuel source change as described by the Proponent’s project change request submission (Canadian Impact Assessment Registry Reference Number 80100, Document Number 1141); and the fire water tank material as described by the Proponent’s project change submission (Canadian Impact Assessment Registry Reference Number 80100, Document Number 1145). 1.9 Designated Project Development Area means the immediate area in which Designated Project activities and components may occur and within which direct physical disturbance, temporary or permanent, may occur because of the Designated Project, defined as the “Project Development Area” in figure 1-2 of the Joint Review Panel Report
  • The water quality parameter shall include the effluent contaminants of concern identified by the Proponent in table 7.4-1 submitted in response to Information Request 7.4 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 680).
  • As part of these measures, the Proponent shall: 8.23.1 maintain and keep accessible nesting habitat for barn swallow (Hirundo rustica) located in the barn identified by the Proponent on figure U24-1 submitted in response to Undertaking 24 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 939); 8.23.2 install artificial nesting structures in suitable habitat and open areas to replace the artificial nesting habitat for barn swallow (Hirundo rustica) located in the shed identified by the Proponent on figure U24-1 submitted in response to Undertaking 24 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 939).
3 alternate formats found
English HTML
  • Relevance: 31454.7
  • , Document Number 57); the revised conceptual design of the Lower Base Line Grade Separation, as described by the Proponent in response to IR3.45 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 613); the implementation of conditions 5.1, 5.2, 6.1, 6.2, 7.3, 8.3, 8.5 and 8.31; the fuel source change as described by the Proponent's project change request submission (Canadian Impact Assessment Registry Reference Number 80100, Document Number 1141); and the fire water tank material as described by the Proponent's project change submission (Canadian Impact Assessment Registry Reference Number 80100, Document Number 1145). 1.9 Designated Project Development Area means the immediate area in which Designated Project activities and components may occur and within which direct physical disturbance, temporary or permanent, may occur because of the Designated Project, defined as the "Project Development Area" in figure 1-2 of the Joint Review Panel Report (Canadian Impact
  • The water quality parameter shall include the effluent contaminants of concern identified by the Proponent in table 7.4-1 submitted in response to Information Request 7.4 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 680).
  • As part of these measures, the Proponent shall: 8.23.1 maintain and keep accessible nesting habitat for barn swallow (Hirundo rustica) located in the barn identified by the Proponent on figure U24-1 submitted in response to Undertaking 24 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 939); 8.23.2 install artificial nesting structures in suitable habitat and open areas to replace the artificial nesting habitat for barn swallow (Hirundo rustica) located in the shed identified by the Proponent on figure U24-1 submitted in response to Undertaking 24 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 939).
French HTML
  • Relevance: 27852.49
  • du Registre canadien d'évaluation d'impact, numéro de document 57); le modèle conceptuel révisé de la séparation de niveau de Lower Base Line, tel que décrit par le promoteur en réponse à la demande d'information 3.45 (numéro 80100 du Registre canadien d'évaluation d'impact, numéro de document 613); la mise en œuvre des conditions 5.1, 5.2, 6.1, 6.2, 7.3, 8.3, 8.5 et 8.31; le changement de source de combustible tel que décrit dans la demande de modification au projet soumise par le promoteur (numéro 80100 du Registre canadien d'évaluation d'impact, numéro de document 1141); et le matériau du réservoir d'eau d'incendie tel que décrit dans la soumission de modification au projet par le promoteur (numéro 80100 du Registre canadien d'évaluation d'impact, numéro de document 1145). 1.31 Promoteur — Compagnie des chemins de fer nationaux du Canada et ses successeurs ou ayants droit. 1.32 Rapport de la commission d'examen conjoint — rapport soumis le 27 janvier 2020 par la commission d'examen
  • comprend les puits d'entrée et de sortie de forage directionnel indiqués à la figure 2 du document daté du 8 avril 2022 intitulé CN Milton Logistic Hub – Proposed Project Change to the Sun-Canadian Pipeline Design and Construction (numéro 80100 du Registre canadien d'évaluation d'impact, numéro de document 1123).
  • Les paramètres de qualité de l'eau comprennent les contaminants d'effluent préoccupants déterminés par le promoteur dans le tableau 7.4-1 présenté en réponse à la demande d'information 7.4 (numéro 80100 du Registre canadien d'évaluation d'impact, numéro de document 680).
French PDF
  • Relevance: 27009.79
  • du Registre canadien d’évaluation d’impact, numéro de document 57); le modèle conceptuel révisé de la séparation de niveau de Lower Base Line, tel que décrit par le promoteur en réponse à la demande d’information 3.45 (numéro 80100 du Registre canadien d’évaluation d’impact, numéro de document 613); la mise en œuvre des conditions 5.1, 5.2, 6.1, 6.2, 7.3, 8.3, 8.5 et 8.31; le changement de source de combustible tel que décrit dans la demande de modification au projet soumise par le promoteur (numéro 80100 du Registre canadien d’évaluation d’impact, numéro de document 1141); et le matériau du réservoir d'eau d’incendie tel que décrit dans la soumission de modification au projet par le promoteur (numéro 80100 du Registre canadien d’évaluation d’impact, numéro de document 1145). 1.31 Promoteur — Compagnie des chemins de fer nationaux du Canada et ses successeurs ou ayants droit. 1.32 Rapport de la commission d’examen conjoint — rapport soumis le 27 janvier 2020 par la commission
  • 985), et qui comprend les puits d’entrée et de sortie de forage directionnel indiqués à la figure 2 du document daté du 8 avril 2022 intitulé CN Milton Logistic Hub – Proposed Project Change to the Sun- Canadian Pipeline Design and Construction (numéro 80100 du Registre canadien d’évaluation d’impact, numéro de document 1123).
  • Les paramètres de qualité de l’eau comprennent les contaminants d’effluent préoccupants déterminés par le promoteur dans le tableau 7.4-1 présenté en réponse à la demande d’information 7.4 (numéro 80100 du Registre canadien d’évaluation d’impact, numéro de document 680).

Document Notice of Updated Decision Statement

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1146
  • Document Date: 2025-09-25
  • Document: 163330E.html
  • Relevance: 33452.3
  • Notice of Updated Decision Statement   Ottawa — October 10, 2025 — The Impact Assessment Agency of Canada (IAAC) has published an updated Decision Statement for the Milton Logistics Hub Project (the project), following a notice of change submitted by the Canadian National Railway Company (CN) on August 5, 2025. CN proposed a change to the material of the project's fire water tank, from steel to fiber-reinforced plastic. IAAC reviewed the proposed change and determined that it would result ...
1 alternate format found
French HTML
  • Relevance: 27358.52
  • Avis de mise à jour de la déclaration de décision   Ottawa – 10 octobre 2025 – L'Agence d'évaluation d'impact du Canada (AEIC ) a publié une version mise à jour de la déclaration de décision pour le projet de pôle logistique de Milton à la suite d'un avis de modification soumis par la Compagnie des chemins de fer nationaux du Canada (CN) le 5 août 2025. La CN a proposé de modifier le matériau du réservoir d'eau du projet en cas d'incendie, qui serait fait de plastique renforcé de fibres ...

Document Updated Decision Statement

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1140
  • Document Date: 2025-01-06
  • Document: 161282E.pdf
  • Relevance: 31503.67
  • , Document Number 613), the implementation of conditions 5.1, 5.2, 6.1, 6.2, 7.3, 8.3, 8.5 and 8.31, and fuel source change as described by the Proponent’s project change request submission (Canadian Impact Assessment Registry Reference Number 80100, Document Number 1141). 1.9 Designated Project Development Area means the immediate area in which Designated Project activities and components may occur and within which direct physical disturbance, temporary or permanent, may occur because of the Designated Project, defined as the “Project Development Area” in figure 1-2 of the Joint Review Panel Report (Canadian Impact Assessment Registry Reference Number 80100, Document Number 985), and which includes the directional drill entry and exit pits shown on figure 2 of the April 8, 2022 document entitled CN Milton Logistic Hub – Proposed Project Change to the Sun-Canadian Pipeline Design and Construction (Canadian Impact Assessment Registry Reference Number 80100, Document Number
  • The water quality parameter shall include the effluent contaminants of concern identified by the Proponent in table 7.4-1 submitted in response to Information Request 7.4 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 680).
  • As part of these measures, the Proponent shall: 8.23.1 maintain and keep accessible nesting habitat for barn swallow (Hirundo rustica) located in the barn identified by the Proponent on figure U24-1 submitted in response to Undertaking 24 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 939); 8.23.2 install artificial nesting structures in suitable habitat and open areas to replace the artificial nesting habitat for barn swallow (Hirundo rustica) located in the shed identified by the Proponent on figure U24-1 submitted in response to Undertaking 24 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 939).
1 alternate format found
French PDF
  • Relevance: 25309.39
  • 985), et qui comprend les puits d’entrée et de sortie de forage directionnel indiqués à la figure 2 du document daté du 8 avril 2022 intitulé CN Milton Logistic Hub – Proposed Project Change to the Sun- Canadian Pipeline Design and Construction (numéro 80100 du Registre canadien d’évaluation d’impact, numéro de document 1123).
  • Les paramètres de qualité de l’eau comprennent les contaminants d’effluent préoccupants déterminés par le promoteur dans le tableau 7.4-1 présenté en réponse à la demande d’information 7.4 (numéro 80100 du Registre canadien d’évaluation d’impact, numéro de document 680).
  • Dans le cadre de ces mesures, le promoteur : 8.23.1 maintient et garde accessible l’habitat de nidification de l’hirondelle rustique (Hirundo rustica) situé dans la grange identifiée par le promoteur à la figure U24-1 présentée en réponse à l’engagement 24 (numéro 80100 du Registre canadien d’évaluation d’impact, numéro de document 939); 8.23.2 installe des structures de nidification artificielles dans l’habitat propice et des zones ouvertes pour remplacer l’habitat de nidification artificiel de l’hirondelle rustique (Hirundo rustica) situé dans le hangar identifié par le promoteur à la figure U24-1 présentée en réponse à l’engagement 24 (numéro 80100 du Registre canadien d’évaluation d’impact, numéro de document 939).

Document Using Reinforced Plastic Fire Water Tank Instead of Steel

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1145
  • Document Date: 2025-08-05
  • Document: 163038E.pdf
  • Relevance: 30691.13
  • CN Milton Logistics Hub – Using Reinforced Plastic Fire Water Tank Instead of Steel August 5, 2025 File: 160901185 Prepared for: Canadian National Railway Company 935 de La Gauchetière Street W Montréal, Québec, H3B 2M9 Prepared by: Stantec Consulting Ltd 100-300 Hagey Boulevard Waterloo ON N2L 0A4 CN Milton Logistics Hub Using Reinforced Plastic Fire Water Tank Instead of Steel August 5, 2025 Table of Contents 1.0 INTRODUCTION ...
1 alternate format found
French PDF
  • Relevance: 27274.3
  • Centre logistique CN Milton – Utilisation d’un réservoir d’eau d’incendie en plastique renforcé au lieu de l’acier 5 août 2025 Fichier: 160901185 Préparé pour : Compagnie des chemins de fer nationaux du Canada 935, rue de La Gauchetière Ouest Montréal (Québec) H3B 2M9 Préparé par : Stantec Experts-conseils Ltée 100-300, boulevard Hagey Waterloo (Ontario) N2L 0A4 Les documents traduits pourraient ne pas être fiables parce que leur exactitude ...

Document Notice - Transition of Decision Statements under section 306 of the Budget Implementation Act, 2024

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1137
  • Document Date: 2024-07-18
  • Document: 158110E.html
  • Relevance: 28543.71
  • Notice — Transition of Decision Statements under section 306 of the Budget Implementation Act, 2024 July 18, 2024 The Minister of the Environment has determined, pursuant to section 306 of the Budget Implementation Act, 2024, that the Decision Statements issued for the 36 Designated Projects listed below contain conditions that could have been included in a Decision Statement issued under subsection 65(1) of the amended Impact Assessment Act (IAA). This determination was made in ...
1 alternate format found
French HTML
  • Relevance: 24163.81
  • Avis — Transition des déclarations de décision au titre de l'article 306 de la Loi d'exécution du budget de 2024 18 juillet 2024 Le ministre de l'Environnement a déterminé, conformément à l'article 306 de la Loi d'exécution du budget de 2024, que les déclarations de décision émises pour les 36 projets désignés énumérés ci-dessous contiennent des conditions qui auraient pu être incluses dans une déclaration de décision publiée en vertu du paragraphe 65(1) de la Loi sur l'évaluation d'impact ...

Document Inspection summary

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1139
  • Document Date: 2023-09-12
  • Document: 158934E.pdf
  • Relevance: 26946.48
  • 160 Elgin St., 24th floor 160, rue Elgin, 24e étage Ottawa ON K1A 0H3 Ottawa ON K1A 0H3 www.canada.ca/iaac www.canada.ca/aeic INSPECTION SUMMARY Project Name: Milton Logistics Hub Project Proponent Name: CN Railway Company Inspection Date: September 12, 2023 Project Description: The Canadian National Railway Company (the Proponent) is planning to construct and operate of an intermodal logistics ...
1 alternate format found
English HTML
  • Relevance: 26671.88
  • Inspection Summary Project Name: Milton Logistics Hub Project Proponent Name: CN Railway Company Inspection Date: September 12, 2023 Project Description: The Canadian National Railway Company (the Proponent) is planning to construct and operate of an intermodal logistics hub designed to transfer containers between trucks and railcars in an area of rapid urban growth. The Project would include a railway yard with more than 20 kilometres of track and be located in Milton, Ontario, about ...

Document Inspection Summaries

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1134
  • Document Date: 2023-03-31
  • Document: 151969E.html
  • Relevance: 25828.22
  • Inspection Summaries On-site Inspection Summary - 2021-12-15 (PDF – 140 KB) On-site Inspection Summary - 2022-03-03 (PDF – 140 KB) On-site Inspection Summary - 2022-06-02 (PDF – 253 KB) On-site Inspection Summary - 2022-10-12 (PDF – 253 KB) On-site Inspection Summary - 2023-04-20 (PDF – 139 KB)
1 alternate format found
French HTML
  • Relevance: 21341.17
  • Résumés d'inspection Résumé de l'inspection - 2021-12-15 (PDF – 140 KB) Résumé de l'inspection - 2022-03-03 (PDF – 140 KB) Résumé de l'inspection - 2022-06-02 (PDF – 253 KB) Résumé de l'inspection - 2022-10-12 (PDF – 253 KB) Résumé de l'inspection - 2023-04-20 (PDF – 139 KB)

Document Inspection summary

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1138
  • Document Date: 2023-04-20
  • Document: 158933E.pdf
  • Relevance: 24976.16
  • 160 Elgin St., 24th floor 160, rue Elgin, 24e étage Ottawa ON K1A 0H3 Ottawa ON K1A 0H3 www.canada.ca/iaac www.canada.ca/aeic INSPECTION SUMMARY Project Name: Milton Logistics Hub Project Proponent Name: CN Railway Company Inspection Date: April 20, 2023 Project Description: The Canadian National Railway Company (the Proponent) is planning to construct and operate of an intermodal logistics hub ...
1 alternate format found
English HTML
  • Relevance: 24851.07
  • Inspection Summary Project Name: Milton Logistics Hub Project Proponent Name: CN Railway Company Inspection Date: April 20, 2023 Project Description: The Canadian National Railway Company (the Proponent) is planning to construct and operate of an intermodal logistics hub designed to transfer containers between trucks and railcars in an area of rapid urban growth. The Project would include a railway yard with more than 20 kilometres of track and be located in Milton, Ontario, about 50 ...

Document Analysis of Canadian National Railway Company's Proposed Changes to the Milton Logistics Hub Project

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1131
  • Document Date: 2022-07-26
  • Document: 144612E.pdf
  • Relevance: 23959.67
  • https://iaac-aeic.gc.ca/050/evaluations/proj/80100/contributions/id/58568 https://gcdocs.gc.ca/ceaa-acee/llisapi.dll?
  • Original version Proposed amendment 1.9 Designated Project Development Area means the immediate area in which Designated Project activities and components may occur and within which direct physical disturbance, temporary or permanent, may occur because of the Designated Project, defined as the “Project Development Area” in figure 1-2 of the Joint Review Panel Report (Canadian Impact Assessment Registry Reference Number 80100, Document Number 985). 1.9 Designated Project Development Area means the immediate area in which Designated Project activities and components may occur and within which direct physical disturbance, temporary or permanent, may occur because of the Designated Project, defined as the “Project Development Area” in figure 1-2 of the Joint Review Panel Report (Canadian Impact Assessment Registry Reference Number 80100, Document Number 985), and which includes the directional drill entry and exit pits shown on figure 2 of the April
  • 8, 2022 document entitled CN Milton Logistic Hub – Proposed Project Change to the Sun-Canadian Pipeline Design and Construction (Canadian Impact Assessment Registry Reference Number 80100, Document Number 1123). 12 2.16 The Proponent shall consult with the Mississaugas of the Credit First Nation, the Six Nations of the Grand River, the Huron-Wendat Nation, Halton Region, Conservation Halton and other relevant authorities prior to notifying the Agency, pursuant to condition 2.17, of any potential change to the Designated Project. 2.16 If the Proponent is proposing to carry out the Designated Project in a manner other than described in condition 1.9, the Proponent shall notify the Agency in writing in advance.

Document Amended Decision Statement

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1132
  • Document Date: 2022-07-26
  • Document: 144613E.pdf
  • Relevance: 23658.11
  • Noise 4.6 The Proponent shall manage noise throughout all phases of the Designated Project so that the Designated Project causes the acoustic environment at any receptor location identified by the Proponent on figure 3 of the document entitled Technical Data Report Noise Effects Assessment (Appendix E.10) (Canadian Impact Assessment Registry Reference Number 80100, Document Number 57) to change by less than one to five decibels, as set out in the U.S.
  • The water quality parameter shall include the effluent contaminants of concern identified by the Proponent in table 7.4-1 submitted in response to Information Request 7.4 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 680).
  • As part of these measures, the Proponent shall: 8.23.1 maintain and keep accessible nesting habitat for barn swallow (Hirundo rustica) located in the barn identified by the Proponent on figure U24-1 submitted in response to Undertaking 24 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 939); 8.23.2 install artificial nesting structures in suitable habitat and open areas to replace the artificial nesting habitat for barn swallow (Hirundo rustica) located in the shed identified by the Proponent on figure U24-1 submitted in response to Undertaking 24 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 939).
2 alternate formats found
English HTML
  • Relevance: 23362.92
  • Noise 4.6 The Proponent shall manage noise throughout all phases of the Designated Project so that the Designated Project causes the acoustic environment at any receptor location identified by the Proponent on figure 3 of the document entitled Technical Data Report Noise Effects Assessment (Appendix E.10) (Canadian Impact Assessment Registry Reference Number 80100, Document Number 57) to change by less than one to five decibels, as set out in the U.S.
  • The water quality parameter shall include the effluent contaminants of concern identified by the Proponent in table 7.4-1 submitted in response to Information Request 7.4 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 680).
  • As part of these measures, the Proponent shall: 8.23.1 maintain and keep accessible nesting habitat for barn swallow (Hirundo rustica) located in the barn identified by the Proponent on figure U24-1 submitted in response to Undertaking 24 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 939); 8.23.2 install artificial nesting structures in suitable habitat and open areas to replace the artificial nesting habitat for barn swallow (Hirundo rustica) located in the shed identified by the Proponent on figure U24-1 submitted in response to Undertaking 24 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 939).
French HTML
  • Relevance: 20362.07
  • comprend les puits d'entrée et de sortie de forage directionnel indiqués à la figure 2 du document daté du 8 avril 2022 intitulé CN Milton Logistic Hub – Proposed Project Change to the Sun-Canadian Pipeline Design and Construction (numéro 80100 du Registre canadien d'évaluation d'impact, numéro de document 1123).
  • Les paramètres de qualité de l'eau comprennent les contaminants d'effluent préoccupants déterminés par le promoteur dans le tableau 7.4-1 présenté en réponse à la demande d'information 7.4 (numéro 80100 du Registre canadien d'évaluation d'impact, numéro de document 680).
  • Dans le cadre de ces mesures, le promoteur : 8.23.1 maintient et garde accessible l'habitat de nidification de l'hirondelle rustique (Hirundo rustica) situé dans la grange identifiée par le promoteur à la figure U24-1 présentée en réponse à l'engagement 24 (numéro 80100 du Registre canadien d'évaluation d'impact, numéro de document 939); 8.23.2 installe des structures de nidification artificielles dans l'habitat propice et des zones ouvertes pour remplacer l'habitat de nidification artificiel de l'hirondelle rustique (Hirundo rustica) situé dans le hangar identifié par le promoteur à la figure U24-1 présentée en réponse à l'engagement 24 (numéro 80100 du Registre canadien d'évaluation d'impact, numéro de document 939).

Document Draft Analysis of Canadian National Railway Company's Proposed Changes to the Milton Logistics Hub Project

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1122
  • Document Date: 2022-06-06
  • Document: 144017E.pdf
  • Relevance: 23211.76
  • Original version Proposed amendment 1.9 Designated Project Development Area means the immediate area in which Designated Project activities and components may occur and within which direct physical disturbance, temporary or permanent, may occur because of the Designated Project, defined as the “Project Development Area” in figure 1-2 of the Joint Review Panel Report (Canadian Impact Assessment Registry Reference Number 80100, Document Number 985). 1.9 Designated Project Development Area means the immediate area in which Designated Project activities and components may occur and within which direct physical disturbance, temporary or permanent, may occur because of the Designated Project, defined as the “Project Development Area” in figure 1-2 of the Joint Review Panel Report (Canadian Impact Assessment Registry Reference Number 80100, Document Number 985), and which includes the directional drill entry and exit pits shown on figure 2 of the April
  • 8, 2022 document entitled CN Milton Logistic Hub – Proposed Project Change to the Sun-Canadian Pipeline Design and Construction (Canadian Impact Assessment Registry Reference Number 80100).
1 alternate format found
French PDF
  • Relevance: 20031.33
  • Version originale Version modifiée proposée 1.38 Zone d'aménagement du projet désigné — la zone adjacente dans laquelle les activités et les composantes du projet désigné peuvent se tenir et dans laquelle des perturbations directes physiques, temporaires ou permanentes, peuvent avoir lieu, définie en tant que « Project Development Area » à la figure 1-2 du Rapport de la commission d'examen conjoint (numéro 80100 du Registre canadien d'évaluation d'impact, numéro de document 985). 1.38 Zone d'aménagement du projet désigné — la zone adjacente dans laquelle les activités et les composantes du projet désigné peuvent se tenir et dans laquelle des perturbations directes physiques, temporaires ou permanentes, peuvent avoir lieu, définie en tant que « Project Development Area » à la figure 1-2 du Rapport de la commission d'examen conjoint (numéro 80100 du Registre canadien d'évaluation d'impact, numéro de document 985), et qui comprend les puits d’entrée
  • et de sortie de forage directionnel indiqués à la figure 2 du document daté du 8 avril 12 . 2022 intitulé CN Milton Logistic Hub – Proposed Project Change to the Sun-Canadian Pipeline Design and Construction ((numéro 80100 du Registre canadien d'évaluation d'impact).

Document Minister's Environmental Assessment Decision Statement

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 1119
  • Document Date: 2021-01-21
  • Document: 137964E.html
  • Relevance: 21338.33
  • Noise 4.6 The Proponent shall manage noise throughout all phases of the Designated Project so that the Designated Project causes the acoustic environment at any receptor location identified by the Proponent on figure 3 of the document entitled Technical Data Report Noise Effects Assessment (Appendix E.10) (Canadian Impact Assessment Registry Reference Number 80100, Document Number 57) to change by less than one to five decibels, as set out in the U.S.
  • The water quality parameter shall include the effluent contaminants of concern identified by the Proponent in table 7.4-1 submitted in response to Information Request 7.4 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 680).
  • As part of these measures, the Proponent shall: 8.23.1 maintain and keep accessible nesting habitat for barn swallow (Hirundo rustica) located in the barn identified by the Proponent on figure U24-1 submitted in response to Undertaking 24 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 939); 8.23.2 install artificial nesting structures in suitable habitat and open areas to replace the artificial nesting habitat for barn swallow (Hirundo rustica) located in the shed identified by the Proponent on figure U24-1 submitted in response to Undertaking 24 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 939).
1 alternate format found
English PDF
  • Relevance: 21160.91
  • Noise 4.6 The Proponent shall manage noise throughout all phases of the Designated Project so that the Designated Project causes the acoustic environment at any receptor location identified by the Proponent on figure 3 of the document entitled Technical Data Report Noise Effects Assessment (Appendix E.10) (Canadian Impact Assessment Registry Reference Number 80100, Document Number 57) to change by less than one to five decibels, as set out in the U.S.
  • The water quality parameter shall include the effluent contaminants of concern identified by the Proponent in table 7.4-1 submitted in response to Information Request 7.4 (Canadian Impact Assessment 22 Registry Reference Number 80100, Document Number 680).
  • As part of these measures, the Proponent shall: 8.23.1 maintain and keep accessible nesting habitat for barn swallow (Hirundo rustica) located in the barn identified by the Proponent on figure U24-1 submitted in response to Undertaking 24 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 939); 8.23.2 install artificial nesting structures in suitable habitat and open areas to replace the artificial nesting habitat for barn swallow (Hirundo rustica) located in the shed identified by the Proponent on figure U24-1 submitted in response to Undertaking 24 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 939).

Document Draft Potential Conditions

  • Project Milton Logistics Hub Project
  • Document Category: Additional Information
  • Reference Number: 990
  • Document Date: 2020-07-02
  • Document: 135146E.pdf
  • Relevance: 20632.3
  • As part of the implementation of the follow-up program, the Proponent shall: 4.20.1 conduct a pre-construction survey to reflect any change to the 2015-2016 air quality baseline information provided by the Proponent as part of the environmental assessment and update, as required based on current baseline information, predicted air quality concentrations set out in table 5-1 of the Joint Review Panel Report (Canadian Impact Assessment Registry Reference Number 80100, Document Number 985) and, for 1-hour and annual NO2 concentrations, set out in tables 1 and 2 submitted by the Proponent in response to Information Request 4.29 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 632).
  • , Document Number 985) and, for 1-hour and annual NO2 concentrations, set out in tables 1 and 2 submitted by the Proponent in response to Information Request 4.29 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 632), or any update to predicted air quality concentrations made pursuant to condition 4.20.1; 4.20.5 if the results of the monitoring referred to in condition 4.20.2 or 4.20.3 meet or are below the predicted air quality concentrations set out in table 5-1 of the Joint Review Panel Report (Canadian Impact Assessment Registry Reference Number 80100, Document Number 985) and, for 1-hour and annual NO2 concentrations, set out in tables 1 and 2 submitted by the Proponent in response to Information Request 4.29 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 632), or any update to predicted air quality concentrations made pursuant to condition 4.20.1, the Proponent may determine a less frequent monitoring frequency
  • As part of these measures, the Proponent shall: 8.24.1 retain and maintain nesting habitat for barn swallow (Hirundo rustica) located in the barn identified by the Proponent on figure U24-1 submitted in response to Undertaking 24 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 939); 8.24.2 install, prior to construction, artificial nesting structures to replace the artificial nesting habitat for barn swallow (Hirundo rustica) located in the shed identified by the Proponent on figure U24-1 submitted in response to Undertaking 24 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 939).
1 alternate format found
English HTML
  • Relevance: 20054.14
  • 1.8 Designated Project means the Milton Logistic Hub Project as described in section 3.3 of the Joint Review Panel Report (Canadian Impact Assessment Registry Reference Number 80100, Document Number 985).
  • 1.13 Environmental impact statement means the December 2015 document entitled Environmental Impact Statement – Milton Logistic Hub (Canadian Impact Assessment Registry Reference Number 80100, Document Number 57).
  • , Document Number 985) and, for 1-hour and annual NO2 concentrations, set out in tables 1 and 2 submitted by the Proponent in response to Information Request 4.29 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 632), or any update to predicted air quality concentrations made pursuant to condition 4.20.1; 4.20.5 if the results of the monitoring referred to in condition 4.20.2 or 4.20.3 meet or are below the predicted air quality concentrations set out in table 5-1 of the Joint Review Panel Report (Canadian Impact Assessment Registry Reference Number 80100, Document Number 985) and, for 1-hour and annual NO2 concentrations, set out in tables 1 and 2 submitted by the Proponent in response to Information Request 4.29 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 632), or any update to predicted air quality concentrations made pursuant to condition

Comment IAAC Registry #80100

  • Comment Milton Logistics Hub Project
  • Author: Administrator on behalf of Halton Region
  • Reference Number: 1066
  • Submitted: 2020-08-21
  • Project Phase: N/A
  • Participation Notice: Public Notice - Public Comments Invited on the Draft Environmental Assessment Report and Draft Potential Conditions
  • Relevance: 19849.1
  • From: Osborne, Jane Sent: Fri Aug 21 09:51:43 2020 To: Conditions (IAAC/AEIC) Cc: MacCaskill, Jane; Brent Marshall; Andrew Siltala ; Jane Clohecy; Tim Commisso Subject: IAAC Registry #80100 Attachment: Ltr Impact Assessment Agency of Canada Aug.pdf(168KB); 20200821 Appendices to CAOs letter - FINAL-TOR_LAW-10429804-v1.PDF(852KB)   Good morning:   Please see attached correspondence from Jane MacCaskill.
  • Attachment Included
  • Relevance: 6602.65
  • August 21, 2020 CAO’s Office Administration 1151 Bronte Road Oakville ON L6M 3L1 David McGovern, President Impact Assessment Agency of Canada 160 Elgin Street, 22 Floor Ottawa, ON, K1A 0H3 Dear President McGovern: Re: IAAC Registry #80100 re Proposed CN Milton Logistics Hub (the Project) Halton Municipalities’ Comments on the Potential Conditions under the Canadian Environmental Assessment Act, 2012 (CEAA, 2012) On behalf of the Regional Municipality of Halton, the Corporation of the Town of Milton, the Corporation of the City of Burlington, the Corporation of the Town of Oakville, and the Corporation of the Town of Halton Hills (collectively, the “Halton Municipalities”), I am responding to the July 2, 2020 request for public comments on the potential conditions released by the Impact Assessment Agency of Canada (the Agency).
  • Attachment Included
  • Relevance: 6490.23
  • Potential Condition Comments 4.1 The Proponent shall measure, prior to construction, baseline light trespass and glare at the eight sites identified by the Proponent in table 4.5 of the document entitled Technical Data Report Light (Appendix E.8) (Canadian Impact Assessment Registry Reference Number 80100, Document Number 57).
  • To protect public health, this proposed measure should be rewritten to ensure that monitoring results are integrated with zones of emission and population data to assess the pyramid of health effects associated with these pollutants, particularly PM10 and PM2.5. 4.20.4.2 if the current baseline information referred to in condition 4.20.1 already exceeds the air quality standards referred to in condition 4.20.4.1, to predicted air quality concentrations set out in table 5-1 of the Joint Review Panel Report (Canadian Impact Assessment Registry Reference Number 80100, Document Number 985) and, for 1-hour and annual NO2 concentrations, set out in tables 1 and 2 submitted by the Proponent in response to Information Request 4.29 (Canadian Impact Assessment Registry Reference Number 80100, Document Number 632), or any update to predicted air quality This proposed measure does not protect public health.
  • Potential Condition Comments 11.1 The Proponent shall assess, prior to construction, the condition of each cultural heritage property identified by the Proponent in table 6.4 of the document entitled Technical Data Report Cultural Heritage Assessment (Appendix E.3) (Canadian Impact Assessment Registry Reference Number 80100, Document Number 57) using photographic records.

Document From the Review Panel to Six Nations of the Grand River re: Invitation to Public Hearing

  • Project Milton Logistics Hub Project
  • Document Category: Hearing Documents
  • Reference Number: 762
  • Document Date: 2019-04-25
  • Document: 129421E.pdf
  • Relevance: 19675.64
  • Ottawa ON K1A 0H3 MiltonHubPanel@ceaa.gc.ca CEAR registry 80100 April 25, 2019 Chief Ava Hill Six Nations of the Grand River By email Subject: Milton Logistics Hub Project – Invitation to Participate in the Public Hearing Dear Chief Ava Hill, The Review Panel established for the joint process for the review of the proposed Milton Logistics Hub Project (the Review Panel) has concluded that the environmental impact statement (EIS) prepared by the Canadian National Railway Company (CN), and additional supplemental information provided by CN, contain sufficient information to proceed to the public hearing phase.
  • Ottawa ON K1A 0H3 MiltonHubPanel@ceaa.gc.ca CEAR registry 80100 information regarding the location, extent and exercise of potential or established Aboriginal or Treaty rights that may be affected by the project; information that relates to any potential adverse impacts of the project on potential or established Aboriginal or Treaty rights; information concerning measures proposed to mitigate and/or avoid any identified adverse effects on potential or established Aboriginal or Treaty rights and interests A preliminary hearing schedule (CEAR #752) is available on the Canadian Environmental Assessment Registry (the Registry).

Last ModifiedDisplay Filters

Filters

Location Display Filters

Assessment Status Display Filters

Nature of Activity Display Filters

Date modified: