Document Notice of Determination
- Project Installation and Utility tie-in for Air Traffic Control Redundancy Trailer – 12-Wing Shearwater, Airfield Capability Strengthening Initiative (ACSI) – Canadian Forces Base (CFB) Halifax, Shearwater, Nova Scotia
- Document Category: Additional Information
- Reference Number: 2
- Document Date: 2026-09-17
- Document: 167982E.html
- Relevance: 395.31
- Notice of Determination September 18, 2026 The Department of National Defence has determined that the proposed ‘Installation and Utility tie-in for Air Traffic Control Redundancy Trailer – 12-Wing Shearwater, Airfield Capability Strengthening Initiative (ACSI) – Canadian Forces Base (CFB) Halifax, Shearwater, Nova Scotia' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following ...
1 alternate format found
French HTML
- Relevance: 344.31
- Avis de détermination Le 18 septembre 2026 Le ministère de la Défense nationale a déterminé que le projet proposé ‘Installation d'une remorque de redondance du contrôle de la circulation aérienne et raccordement aux services publics – 12e Escadre Shearwater, initiative de renforcement des capacités de l'aérodrome (ACSI) – Base des Forces canadiennes (BFC) Halifax, Shearwater, Nouvelle-Écosse' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La ...