Camp Fortune: Construction of a New Lodge for Ski Instructors

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of determination

  • Project Camp Fortune: Construction of a New Lodge for Ski Instructors
  • Document Category: Additional Information
  • Reference Number: 2
  • Document Date: 2025-11-10
  • Document: 163735E.html
  • Relevance: 382.9
  • Notice of Determination November 10, 2025 – The Business Development Bank of Canada (BDC) has determined that the proposed construction of a new lodge for ski instructors is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous knowledge; community knowledge; comments received from the public; and technically and economically feasible mitigation ...
1 alternate format found
French HTML
  • Relevance: 331.9
  • Avis de décision 10 novembre 2025 – La Banque de développement du Canada (BDC) a déterminé que le projet de construction d'une nouvelle loge pour les instructeurs de ski n'est pas susceptible de causer des effets négatifs importants sur l'environnement. Cette détermination reposait sur les facteurs suivants : répercussions sur les droits des peuples autochtones; connaissances autochtones; connaissances communautaires; commentaires reçus du public; et mesures d'atténuation réalisables ...

Document Notice of Intent to Make a Determination - Start of Public Comment Period - BDC

  • Project Camp Fortune: Construction of a New Lodge for Ski Instructors
  • Document Category: For Public Participation
  • Reference Number: 1
  • Document Date: 2025-10-07
  • Document: 163395E.html
  • Relevance: 379.36
  • Public Notice Camp Fortune: Construction of a New Lodge for Ski Instructors – Public Comments Invited October 7, 2025 – The Business Development Bank of Canada (BDC) must determine whether the proposed construction of a new lodge for ski instructors, located in Chelsea, Quebec is likely to cause significant adverse environmental effects. To help inform this determination, BDC is inviting comments from the public respecting that determination. All comments received will be considered ...
1 alternate format found
French HTML
  • Relevance: 328.36
  • Avis public Camp Fortune : Construction d'une nouvelle loge pour les instructeurs de ski – Période de consultation publique 7 octobre 2025 – La Banque de développement du Canada (BDC) doit déterminer si le projet proposé de construction d'une nouvelle loge pour les instructeurs de ski, situé à Chelsea, Québec, est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, BDC invite le public à formuler des ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Date modified: