Document Notice of Determination
- Project Construction of 25KV distribution powerline to IPC Canada Site 13-35-19-7-4
- Document Category: Additional Information
- Reference Number: 2
- Updated: 2022-10-19
- Document: 145311E.html
- Relevance: 345.33
- Notice of Determination October 19, 2022 – Canadian Forces Base Suffield The Department of National Defence has determined that the proposed "Construction of 25KV distribution powerline to IPC Canada Site 13-35-19-7-4" project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: construction to occur during January – June 2023; comments received from the public; and technically and economically ...
1 alternate format found
French HTML
- Relevance: 294.33
- Avis de détermination Le 19 octobre 2022 – Base des Forces canadiennes Suffield Le Ministère de la Défense nationale a déterminé que le projet proposé ‘Construction d'une ligne électrique de distribution de 25KV vers le site 13-35-19-7-4 d'IPC Canada' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : la construction aura lieu de janvier à juin 2023; commentaires reçus du public; et les ...