Construction of 25KV distribution powerline to IPC Canada Site 13-35-19-7-4

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Construction of 25KV distribution powerline to IPC Canada Site 13-35-19-7-4
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2022-10-19
  • Document: 145311E.html
  • Relevance: 345.33
  • Notice of Determination October 19, 2022 – Canadian Forces Base Suffield The Department of National Defence has determined that the proposed "Construction of 25KV distribution powerline to IPC Canada Site 13-35-19-7-4" project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: construction to occur during January – June 2023; comments received from the public; and technically and economically ...
1 alternate format found
French HTML
  • Relevance: 294.33
  • Avis de détermination Le 19 octobre 2022 – Base des Forces canadiennes Suffield Le Ministère de la Défense nationale a déterminé que le projet proposé ‘Construction d'une ligne électrique de distribution de 25KV vers le site 13-35-19-7-4 d'IPC Canada' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : la construction aura lieu de janvier à juin 2023; commentaires reçus du public; et les ...

Document Construction of 25KV distribution powerline to IPC Canada Site 13-35-19-7-4

  • Project Construction of 25KV distribution powerline to IPC Canada Site 13-35-19-7-4
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2022-07-20
  • Document: 144502E.html
  • Relevance: 336.98
  • Public Comment Period on Intent to Make a Determination Construction of 25KV distribution powerline to IPC Canada Site 13-35-19-7-4 July 20, 2022 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered ...
1 alternate format found
French HTML
  • Relevance: 285.98
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Construction d'une ligne électrique de distribution de 25KV vers le site 13-35-19-7-4 d'IPC Canada Le 20 juillet 2022 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: