Public Comment Period on Intent to Make a Determination
Construction of 25KV distribution powerline to IPC Canada Site 13-35-19-7-4

July 20, 2022 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects.

To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals should consult the Privacy Notice on the Registry website.

Written comments must be submitted by August 8, 2022 to:
Mr. Danny Laganiere, Base Environmental Officer
Mailing Address:  CFB Suffield, Box 6000 Station Main, Medicine Hat Alberta T1A 8K8
E-mail:  Danny.Laganiere@forces.gc.ca

Mr. Tim Tea, Designer, FortisAlberta
Mailing Address: 1301 Dirkson Drive NE Redcliff Alberta T0J 2P0
E-mail:  Tim.Tea@fortisAlberta.com
Telephone number: 403-502-3106

The Proposed Project

Fortis Alberta to construct a 25 kV 3-phase distribution power line 810 km. The proposed tap will be starting from 8-3-20-7-4 to existing IPC site 13-35-19-7-4. The proposed tap will be fed from an existing line 25 kV phase line.

Document reference number: 1

Date modified: