Lambert La Ronge Peat Harvest Project

Registry Search Mobile

Registry Search

Skip to Filters

11 results

Document Notice of Time Limit Resumption

  • Project Lambert La Ronge Peat Harvest Project
  • Document Category: Additional Information
  • Reference Number: 7
  • Updated: 2023-01-17
  • Document: 145874E.html
  • Relevance: 399.45
  • Notice of Time Limit Resumption Ottawa — January 17, 2023 — On January 16, 2023, Lambert Peat Moss Inc. (the proponent) addressed the information request from the Agency in relation to the Lambert La Ronge Peat Harvest Project. The proponent thereby completed the activity for which it requested the time limit be suspended and the 90-day time limit has resumed. The 90-day time limit is the period of time within which the Minister must respond, with reasons, to a request to designate a ...
1 alternate format found
French HTML
  • Relevance: 348.45
  • Avis de reprise du délai Ottawa — 17 janvier 2023 — Le 16 janvier 2023, Tourbières Lambert Inc. (le promoteur) a fourni à l'Agence les renseignements demandés relativement au projet de récolte de tourbe de Lambert La Ronge. Le promoteur a ainsi terminé l'activité pour laquelle la suspension du délai a été demandé, et le délai de 90 jours a repris son cours. Le délai de 90 jours est la période au cours de laquelle le Ministre doit répondre, motifs à l'appui, à la demande de désignation de ...

Document Notice Time Limit Suspension with Reasons

  • Project Lambert La Ronge Peat Harvest Project
  • Document Category: Additional Information
  • Reference Number: 5
  • Updated: 2022-03-25
  • Document: 143336E.html
  • Relevance: 368.25
  • Notice of Time Limit Suspension with Reasons Ottawa — March 25, 2022 — On March 23, 2022, the Impact Assessment Agency of Canada (the Agency) suspended the 90-day time limit within which the Minister must respond, with reasons, to the initial request for designation of the Lambert La Ronge Peat Harvest Project, proposed by Lambert Peat Moss Inc. (the Proponent). The Agency has suspended the time limit based on the request from the Proponent that the time limit be suspended to allow it ...
1 alternate format found
French HTML
  • Relevance: 317.25
  • Avis de suspension du délai avec motifs Ottawa — 25 mars 2022 — Le 23 mars 2022, l'Agence d'évaluation d'impact du Canada (l'Agence) a suspendu le délai de 90 jours au cours duquel le ministre doit répondre, motifs à l'appui, à la demande initiale de désignation du projet de récolte de tourbe de Lambert La Ronge proposé par les Tourbières Lambert (le promoteur). L'Agence a suspendu le délai en raison de la demande du promoteur de suspendre le délai afin de lui donner suffisamment de temps ...

Document Notice of Time Limit Resuming

  • Project Lambert La Ronge Peat Harvest Project
  • Document Category: Additional Information
  • Reference Number: 4
  • Updated: 2022-03-08
  • Document: 143116E.html
  • Relevance: 366.55
  • Notice of Time Limit Resuming Ottawa — March 8, 2022 — On March 7, 2022, Lambert Peat Moss Inc. (the Proponent) addressed the information request from the Agency in relation to the Lambert La Ronge Peat Harvest Project. The Proponent thereby completed the activity for which it requested the time limit be suspended and the 90-day time limit has resumed. The 90-day time limit is the period of time within which the Minister must respond, with reasons, to a request to designate a physical ...
1 alternate format found
French HTML
  • Relevance: 315.55
  • Avis de reprise du délai Ottawa — 8 mars 2022 — Le 7 mars 2022, Tourbières Lambert (le promoteur) a fourni à l'Agence les renseignements demandés relativement au projet de récolte de tourbe de Lambert La Ronge. Le promoteur a ainsi terminé l'activité pour laquelle la suspension du délai a été demandé, et le délai de 90 jours a repris son cours. Le délai de 90 jours est la période au cours de laquelle le ministre doit répondre, motifs à l'appui, à la demande de désignation de l'activité ...

Document Notice of Time Limit Suspension with Reasons

  • Project Lambert La Ronge Peat Harvest Project
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2022-02-18
  • Document: 142899E.html
  • Relevance: 364.76
  • Notice of Time Limit Suspension with Reasons Ottawa — February 18, 2022 — On February 18, 2022, the Impact Assessment Agency of Canada (the Agency) suspended the 90-day time limit within which the Minister must respond, with reasons, to the initial request for designation of the Lambert La Ronge Peat Harvest Project, proposed by Lambert Peat Moss Inc. (the Proponent). The Agency has taken this action further to a written request from the Proponent that the time limit be suspended in order ...
1 alternate format found
French HTML
  • Relevance: 313.76
  • Avis de suspension du délai avec motifs Ottawa — 18 février 2022 — Le 18 février 2022, l'Agence d'évaluation d'impact du Canada (l'Agence) a suspendu le délai de 90 jours au cours duquel le ministre doit répondre, motifs à l'appui, à la demande initiale de désignation du projet de récolte de tourbe de Lambert La Ronge proposé par les Tourbières Lambert (le promoteur). Cet avis fait suite à la présentation par le promoteur d'une demande écrite (en anglais seulement) de suspendre le délai ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Document Category Display Filters

Date modified: