Document Notice of Determination

  • Project Construction of a Land Based Test Facility, Hartlen Point, Canadian Forces Base (CFB) Halifax, Nova Scotia
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2023-03-02
  • Document: 146829E.html
  • Relevance: 357.41
  • Notice of Determination March 2, 2023 The authorities determined that the proposed ‘Construction of a Land Based Test Facility' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous knowledge; community knowledge; comments received from the public; and technically and economically feasible mitigation measures In making this ...
1 alternate format found
French HTML
  • Relevance: 306.41
  • Avis de détermination Le 2 mars 2023 Les autorités ont déterminé que le projet proposé ‘Construction d'une installation d'essai terrestre' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : répercussions sur les droits des peuples autochtones; connaissances autochtones; connaissances communautaires; commentaires reçus du public; et les mesures d'atténuation réalisables, sur les plans ...

Document Public Comment Period on Intent to Make a Determination

  • Project Construction of a Land Based Test Facility, Hartlen Point, Canadian Forces Base (CFB) Halifax, Nova Scotia
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2021-01-05
  • Document: 137478E.html
  • Relevance: 290.51
  • Public Comment Period on Intent to Make a Determination Construction of a Land Based Test Facility, Hartlen Point, Canadian Forces Base (CFB) Halifax, Nova Scotia January 5, 2021 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments ...
1 alternate format found
French HTML
  • Relevance: 239.51
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Construction d'une installation d'essai terrestre, à Hartlen Point, à la Base des Forces canadiennes (BFC) Halifax, en Nouvelle-Écosse Le 5 janvier 2021 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale ...