Yellowhead Copper Project

Registry Search Mobile

Registry Search

Skip to Filters

9 results

Document Notice of Time Limit Suspension with Reasons

  • Project Yellowhead Copper Project
  • Document Category: Additional Information
  • Reference Number: 36
  • Document Date: 2025-10-09
  • Document: 163749E.html
  • Relevance: 369.51
  • Notice of Time Limit Suspension with Reasons   Ottawa — October 17, 2025 — On October 9, 2025, the Impact Assessment Agency of Canada (IAAC) suspended the 180-day time limit for the planning phase under the Impact Assessment Act for the Yellowhead Copper Project proposed by Taseko Mines Limited (the proponent). IAAC has taken this action in consideration of a written request from the proponent that the time limit be suspended in order that it may have sufficient time to provide to ...
1 alternate format found
French HTML
  • Relevance: 318.51
  • Avis de suspension du délai avec motifs   Ottawa — 17 octobre 2025 — Le 9 octobre 2025, l'Agence d'évaluation d'impact du Canada (AEIC) a suspendu le délai de 180 jours prévu pour l'étape préparatoire, en vertu de la Loi sur l'évaluation d'impact, pour le projet de cuivre de Yellowhead de Taseko Mines Limited (le promoteur). L'AEIC a pris cette mesure en réponse à une demande écrite du promoteur (en anglais seulement) visant à suspendre le délai, afin de lui permettre de disposer de ...

Document Joint Summary of Issues and Engagement

  • Project Yellowhead Copper Project
  • Document Category: Additional Information
  • Reference Number: 34
  • Document Date: 2025-10-02
  • Document: 163624E.html
  • Relevance: 368.8
  • Joint Summary of Issues and Engagement Yellowhead Copper Project Pursuant to Section 13.5 of the Environmental Assessment Act, S.B.C. 2018, c.51 Pursuant to Section 14(1) of the Impact Assessment Act, S.C. 2019, c.28, s.1 October 2, 2025 Introduction Taseko Mines Limited (Taseko) is proposing the construction, operation, and closure of a new open-pit copper mine located about 150 kilometres northeast of Kamloops, British Columbia. The Yellowhead Copper Project has been ...
3 alternate formats found
English PDF
  • Relevance: 368.8
  • UNCLASSIFIED - NON CLASSIFIÉ Joint Summary of Issues and Engagement YELLOWHEAD COPPER PROJECT Pursuant to Section 13.5 of the Environmental Assessment Act, S.B.C. 2018, c.51 Pursuant to Section 14(1) of the Impact Assessment Act, S.C. 2019, c.28, s.1 OCTOBER 2, 2025 2 UNCLASSIFIED - NON CLASSIFIÉ Introduction Taseko Mines Limited (Taseko) is proposing the construction, operation, and closure of a ...
French HTML
  • Relevance: 317.8
  • Sommaire conjoint des questions et de la mobilisation Projet de cuivre de Yellowhead En application de l'article 13.5 de l'Environmental Assessment Act, S.B.C. 2018, c. 51 En application du paragraphe 14(1) de la Loi sur l'évaluation d'impact, L.C. 2019, ch. 28, art. 1 2 Octobre 2025 Introduction Taseko Mines Limited propose la construction, l'exploitation et la fermeture d'une nouvelle mine de cuivre à ciel ouvert, située à environ 150 kilomètres au nord-est de Kamloops, ...
French PDF
  • Relevance: 317.8
  • NON CLASSIFIÉ – UNCLASSIFIED Sommaire conjoint des quesfions et de la mobilisafion PROJET DE CUIVRE DE YELLOWHEAD En applicafion de l’arficle 13.5 de l’Environmental Assessment Act, S.B.C. 2018, ch. 51 En applicafion du paragraphe 14(1) de la Loi sur l’évaluafion d’impact, L.C. 2019, ch. 28, art. 1 2 OCTOBRE 2025 2 NON CLASSIFIÉ – UNCLASSIFIED Introducfion Taseko Mines Limited (Taseko) propose la construcfion, ...

Document Summary of the Initial Project Description of a Designated Project

  • Project Yellowhead Copper Project
  • Document Category: For Public Participation
  • Reference Number: 3
  • Document Date: 2025-06-23
  • Document: 162301E.pdf
  • Relevance: 358.82
  • Yellowhead Copper Project Initial Project Description Plain Language Summary June 23, 2025 Version: 2 Yellowhead Copper Project Taseko Mines Limited June 23, 2025 Revision Record Revision Date Description 0 June 11, 2025 Issued for Review 1 June 23, 2025 Issued for submission 2 June 23, 2025 Re-Issued for submission Yellowhead Copper Project SUBMITTED TO: SUBMITTED BY: The BC Environmental Assessment Office 1st Floor, 836 Yates St. PO Box ...
1 alternate format found
French PDF
  • Relevance: 307.82
  • Projet de cuivre Yellowhead Résumé en langage clair de la description initiale du projet 23 juin 2025 Version: 2 Projet de cuivre Yellowhead Taseko Mines Limited 23 juin 2025 Historique des révisions Révision Date Description 0 11 juin 2025 Soumis à examen 1 23 juin 2025 Émis pour soumission 2 23 juin 2025 Re-émis pour soumission Projet de cuivre Yellowhead SOUMIS À : SOUMIS PAR : Bureau d’évaluation environnementale de la C.- B. 1st ...