Joyce Lake Direct Shipping Iron Ore Project

Registry Search Mobile

Registry Search

Skip to Filters

16 results

Document Permitting plan

  • Project Joyce Lake Direct Shipping Iron Ore Project
  • Document Category: Additional Information
  • Reference Number: 36
  • Document Date: 2026-07-28
  • Document: 167361E.pdf
  • Relevance: 392.11
  • Permitting Plan JOYCE LAKE DIRECT SHIPPING IRON ORE PROJECT July 27, 2026 IMPACT ASSESSMENT AGENCY OF CANADA PERMITT ING PLAN 2 Permitting Plan 1. Introduction On December 17, 2025, the Impact Assessment Agency of Canada (IAAC) posted a Notice of Transition to the Impact Assessment Act for the Joyce Lake Direct Shipping Iron Ore Project (the project). This Permitting Plan was developed by IAAC to outline the ...
1 alternate format found
French PDF
  • Relevance: 341.11
  • Plan de délivrance de permis PROJET DE MINERAI DE FER À EXPÉDITION DIRECTE JOYCE LAKE Juillet 2026 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA PLAN DE DÉLIVRANCE DE PERMIS - PROJET DE MINERAI DE FER À EXPÉDITION DIRECTE JOYCE LAKE 2 Plan de délivrance de permis 1. Introduction Le 22 mars 2024, l’Agence d’évaluation d’impact du Canada (l’AEIC) a émis l’avis qu’une évaluation d’impact est justifiée pour le projet ...

Document Tailored impact statement guidelines

  • Project Joyce Lake Direct Shipping Iron Ore Project
  • Document Category: Additional Information
  • Reference Number: 38
  • Document Date: 2026-07-28
  • Document: 167387E.pdf
  • Relevance: 392.11
  • Tailored Impact Statement Guidelines JOYCE LAKE DIRECT SHIPPING IRON ORE PROJECT July 2026 IMPACT ASSESSMENT AGENCY OF CANADA TAILORED IMPACT STATEMENT GUIDELINES i Table of Contents Table of Contents ............................................................................................................... i Abbreviations and short forms ...
1 alternate format found
French PDF
  • Relevance: 341.11
  • Lignes directrices individualisées relatives à l’étude d’impact PROJET DE MINERAI DE FER À EXPÉDITION DIRECTE JOYCE LAKE Juillet 2026 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA LIGNES DIRECTRICES INDIVIDUALISÉES RELATIVES À L ’ÉTUDE D ’ IMPACT i Table des matières Table des matières ............................................................................................................. i Abréviations et formes abrégées ...

Document Cooperation plan

  • Project Joyce Lake Direct Shipping Iron Ore Project
  • Document Category: Additional Information
  • Reference Number: 34
  • Document Date: 2026-07-28
  • Document: 167359E.pdf
  • Relevance: 392.11
  • UNCLASSIFIED - NON CLASSIFIÉ Cooperation Plan JOYCE LAKE DIRECT SHIPPING IRON ORE PROJECT July 2026 IMPACT ASSESSMENT AGENCY OF CANADA COOPERATION PLAN i UNCLASSIFIED - NON CLASSIFIÉ Table of Contents 1. Introduction ......................................................................................................... 1 2. Project Description ...
1 alternate format found
French PDF
  • Relevance: 341.11
  • UNCLASSIFIED - NON CLASSIFIÉ Plan de coopération PROJET DE MINERAI DE FER À EXPÉDITION DIRECTE JOYCE LAKE Juillet 2026 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA PLAN DE COOPÉRATION i UNCLASSIFIED - NON CLASSIFIÉ Table des matières 1. Introduction ............................................................................................................................... 1 2. Description du projet ...

Document Indigenous engagement and partnership plan

  • Project Joyce Lake Direct Shipping Iron Ore Project
  • Document Category: Additional Information
  • Reference Number: 35
  • Document Date: 2026-07-28
  • Document: 167360E.pdf
  • Relevance: 392.11
  • Indigenous Engagement and Partnership Plan JOYCE LAKE DIRECT SHIPPING IRON ORE PROJECT July 2026 IMPACT ASSESSMENT AGENCY OF CANADA INDIGENOUS ENGAGEMENT AND PARTNERSHIP PLAN i Table of Contents 1. Introduction ............................................................................................................. 1 2. Description of the Proposed Project ....................................................................... 2 3. ...
1 alternate format found
French PDF
  • Relevance: 341.11
  • Plan de mobilisation et de partenariat avec les Autochtones PROJET DE MINERAI DE FER À EXPÉDITION DIRECTE JOYCE LAKE Juillet 2026 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA PLAN DE MOBILISATION ET DE PARTENARIAT AVEC LES AUTOCHTONES i Table des matières 1. Introduction ....................................................................................................... 1 2. Description du projet proposé ...

Document Public participation plan

  • Project Joyce Lake Direct Shipping Iron Ore Project
  • Document Category: Additional Information
  • Reference Number: 37
  • Document Date: 2026-07-28
  • Document: 167386E.pdf
  • Relevance: 392.11
  • Public Participation Plan JOYCE LAKE DIRECT SHIPPING IRON ORE PROJECT July 2026 IMPACT ASSESSMENT AGENCY OF CANADA PUBLIC PARTICIPATION PLAN 1 Public Participation Plan 1. Introduction On January 3, 2013, the Impact Assessment Agency of Canada (IAAC) determined that a federal environmental assessment is warranted for the Joyce Lake Direct Shipping Iron Ore Project (the project), under the Canadian ...
1 alternate format found
French PDF
  • Relevance: 341.11
  • Plan de participation du public PROJET DE MINERAI DE FER À EXPÉDITION DIRECTE JOYCE LAKE Juillet 2026 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA PLAN DE PARTICIPATION DU PUBLIC 1 Plan de participation du public 1. Introduction Le 3 janvier 2013, l’Agence d’évaluation d’impact du Canada (AEIC) a déterminé qu’une évaluation environnementale fédérale était requise pour le Projet de minerai de fer à expédition ...

Document Final Environmental Impact Statement Guidelines

  • Project Joyce Lake Direct Shipping Iron Ore Project
  • Document Category: Additional Information
  • Reference Number: 9
  • Document Date: 2013-03-04
  • Document: 86958E.pdf
  • Relevance: 101
  • ENVIRONMENTAL IMPACT STATEMENT GUIDELINES Guidelines for the preparation of an Environmental Impact Statement (EIS) for an environmental assessment conducted pursuant to the Canadian Environmental Assessment Act, 2012. Joyce Lake Direct Shipping Iron Ore Project Labec Century Iron Ore March 5, 2013 CEAA DRAFT EIS Guidelines – Joyce Lake Direct Shipping Iron Ore Project (January 2013) ii TABLE OF CONTENTS PART 1 - BACKGROUND ...
1 alternate format found
French PDF
  • Relevance: 50
  • LIGNES DIRECTRICES RELATIVES À L’ÉTUDE D’IMPACT ENVIRONNEMENTAL Lignes directrices relatives à la préparation d’une étude d’impact environnemental (EIE) pour une évaluation environnementale réalisée en vertu de la Loi canadienne sur l’évaluation environnementale (2012) Projet de minerai de fer à enfournement direct Joyce Lake Labec Century Iron Ore inc. 5 mars 2013 Lignes directrices relatives à l’EIE de l’ACEE- Projet de minerai de ...

Document Notice of Environmental Assessment Determination

  • Project Joyce Lake Direct Shipping Iron Ore Project
  • Document Category: Additional Information
  • Reference Number: 5
  • Document Date: 2013-01-03
  • Document: 132312E.html
  • Relevance: 101
  • Notice of Environmental Assessment Determination Ottawa – January 4, 2013 - The Canadian Environmental Assessment Agency (the Agency) commenced an environmental assessment for the Joyce Lake Direct Shipping Iron Ore Project located in Newfoundland and Labrador. The Agency determined on January 3, 2013 that a federal environmental assessment is required for the Joyce Lake Direct Shipping Iron Ore Project pursuant to the Canadian Environmental Assessment Act, 2012 (CEAA 2012) In ...
1 alternate format found
French HTML
  • Relevance: 50
  • Avis de décision concernant une évaluation environnementale Ottawa – le 4 janvier 2013 - L'Agence canadienne d'évaluation environnementale (l'Agence) a entrepris une évaluation environnementale du projet de minerai de fer à expédition directe Joyce Lake situé à Terre-Neuve et Labrador. L'Agence a déterminé le 3 janvier 2013, en fonction des renseignements qu'elle a reçus, qu'une évaluation environnementale du projet de minerai de fer à expédition directe Joyce Lake est nécessaire en ...

Document Summary of the Project Description of a Designated Project

  • Project Joyce Lake Direct Shipping Iron Ore Project
  • Document Category: For Public Participation
  • Reference Number: 3
  • Document Date: 2012-11-18
  • Document: 83623E.pdf
  • Relevance: 101
  • Project Description Summary Document JOYCE LAKE DIRECT SHIPPING IRON ORE PROJECT Labec Century, a subsidiary of Century Iron Mines Corp. November 5, 2012 Joyce Lake Direct Shipping Iron Ore Project: Project Description – Summary Document Prepared for: Labec Century Iron Ore (a subsidiary of Century Iron Mines Corporation) 170 University Avenue, Suite 602 Toronto, ON M6H 3B3 Prepared by: Stassinu Stantec Limited Partnership 607 Torbay Road St. John’s, ...
1 alternate format found
French PDF
  • Relevance: 50
  • Résumé de la description de projet PROJET DE MINERAI DE FER À ENFOURNEMENT DIRECT JOYCE LAKE Labec Century Iron Ore, société filiale de les mines de fer Century Corp. 5 novembre 2012 Projet de minerai de fer à enfournement direct Joyce Lake - Résumé de la description de projet Préparé pour : Labec Century Iron Ore (société filiale de les mines de fer Century Corp.) 170 avenue University, bureau 602 Toronto (Ontario) M6H 3B3 Préparé par : Stassinu ...