Baptiste Nickel Project

Registry Search Mobile

Registry Search

Skip to Filters

11 results

Document Notice of time limit suspension with reasons

  • Project Baptiste Nickel Project
  • Document Category: Additional Information
  • Reference Number: 81
  • Document Date: 2026-06-17
  • Document: 166852E.html
  • Relevance: 395.19
  • Notice of time limit suspension with reasons Ottawa — June 17, 2026 — On June 11, 2026, the Impact Assessment Agency of Canada (IAAC) suspended the 180-day time limit for the planning phase under the Impact Assessment Act for the Baptiste Nickel Project proposed by FPX Nickel Corp. (the proponent). IAAC has taken this action in consideration of a written request from the proponent that the time limit be suspended in order that it may have sufficient time to align the federal and ...
1 alternate format found
French HTML
  • Relevance: 344.19
  • Avis de suspension de délai avec motifs Ottawa — Le 17 juin 2026 — Le 11 juin 2026, l'Agence d'évaluation d'impact du Canada (AEIC) a suspendu le délai de 180 jours pour l'étape préparatoire en vertu de la Loi sur l'évaluation d'impact pour le projet nickélifère Baptiste proposé par FPX Nickel Corp. (le promoteur). L'AEIC a pris cette mesure à la suite d'une demande écrite du promoteur de suspendre le délai afin d'avoir suffisamment de temps pour harmoniser les processus réglementaires ...

Document Notice of impact assessment decision with reasons

  • Project Baptiste Nickel Project
  • Document Category: Additional Information
  • Reference Number: 78
  • Document Date: 2026-06-08
  • Document: 166786E.html
  • Relevance: 394.21
  • Notice of impact assessment decision with reasons Ottawa — June 8, 2026 — On June 4, 2026, the Impact Assessment Agency of Canada (IAAC) determined that the Baptiste Nickel Project (the project) proposed by FPX Nickel Corp. (the proponent), located in British Columbia, will move to the next step in the planning phase. The Minister of the Environment, Climate Change and Nature will consider the request from British Columbia to substitute the federal impact assessment of the project to the ...
1 alternate format found
French HTML
  • Relevance: 343.21
  • Avis de décision relative à une évaluation d'impact avec motifs Ottawa — 8 juin 2026 — Le 4 juin 2026, l'Agence d'évaluation d'impact du Canada (AEIC) a déterminé que le projet nickélifère Baptiste (le projet) proposé par FPX Nickel Corp. (le promoteur), situé en Colombie‑Britannique, passera à la phase suivante de l'étape préparatoire. La ministre de l'Environnement, du Changement climatique et de la Nature examinera la demande de la Colombie-Britannique visant à remplacer l'évaluation ...

Document Joint Summary of Issues and Engagement

  • Project Baptiste Nickel Project
  • Document Category: Additional Information
  • Reference Number: 77
  • Document Date: 2026-04-20
  • Document: 166226E.html
  • Relevance: 388.97
  • Joint Summary of Issues and Engagement Baptiste Nickel Project Pursuant to Section 14(1) of the Impact Assessment Act, S.C. 2019, c.28, s.1 Pursuant to Section 13(5) of the Environmental Assessment Act, S.B.C. 2018, c.51 April 20, 2026 Introduction FPX Nickel Corp. (FPX) is proposing to construct, operate and decommission a new open-pit nickel mine, located approximately 80 kilometres northwest of Fort St. James in central British Columbia (B.C.). As proposed, the Baptiste ...
3 alternate formats found
English PDF
  • Relevance: 388.97
  • Joint Summary of Issues and Engagement BAPTISTE NICKEL PROJECT Pursuant to Section 14(1) of the Impact Assessment Act, S.C. 2019, c.28, s.1 Pursuant to Section 13(5) of the Environmental Assessment Act, S.B.C. 2018, c.51 APRIL 20, 2026 2 Introduction FPX Nickel Corp. (FPX) is proposing to construct, operate and decommission a new open-pit nickel mine, located approximately 80 kilometres northwest of ...
French HTML
  • Relevance: 337.97
  • Sommaire conjoint des questions et de la mobilisation Projet nickélifère Baptiste En application du paragraphe 14(1) de la Loi sur l'évaluation d'impact, L.C. 2019, ch. 28, art. 1 En application de l'article 13.5 de l'Environmental Assessment Act, S.B.C. 2018, c. 51 20 avril 2026 Introduction FPX Nickel Corp. (FPX) propose la construction, l'exploitation et la désaffectation d'une nouvelle mine de nickel à ciel ouvert, située à environ 80 kilomètres au nord-ouest de Fort ...
French PDF
  • Relevance: 337.97
  • Joint Summary of Issues and Engagement BAPTISTE NICKEL PROJECT Pursuant to Section 14(1) of the Impact Assessment Act, S.C. 2019, c.28, s.1 Pursuant to Section 13(5) of the Environmental Assessment Act, S.B.C. 2018, c.51 APRIL 20, 2026 2 Introduction FPX Nickel Corp. (FPX) is proposing to construct, operate and decommission a new open-pit nickel mine, located approximately 80 kilometres northwest of ...

Document Summary of the Initial Project Description of a Designated Project

  • Project Baptiste Nickel Project
  • Document Category: For Public Participation
  • Reference Number: 2
  • Document Date: 2026-01-16
  • Document: 164665E.pdf
  • Relevance: 379.12
  • Baptiste Nickel Project Initial Project Description Summary PREPARED BY ERM Consultants Canada Ltd. DATE January 2026 REFERENCE 0689082 INITIAL PROJECT DESCRIPTION SUMMARY CONTENTS PROJECT NO: 0689082 DATE: January 2026 VERSION: I.1 Page i CONTENTS 1. PART A: GENERAL INFORMATION 1 1.1 INTRODUCTION 1 1.2 PROPONENT INFORMATION 3 1.3 SUMMARY OF ENGAGEMENT 3 1.3.1 First Nations Engagement 5 1.3.2 Public Engagement 10 1.3.3 Engagement with ...
1 alternate format found
French PDF
  • Relevance: 328.12
  • Projet nicke life re Baptiste Re sume de la Description initiale du Projet PRÉPARÉ PAR ERM Consultants Canada Ltd. DATE Janvier 2026 RÉFÉRENCE 0689082 RÉSUMÉ DE LA DESCRIPTION INITIALE DU PROJET TABLE DES MATIÈRES No DE PROJET : 0689082 DATE : Janvier 2026 VERSION : H.1 Page i TABLE DES MATIÈRES 1. PARTIE A : RENSEIGNEMENTS GÉNÉRAUX 1 1.1 INTRODUCTION 1 1.2 RENSEIGNEMENTS SUR LE PROMOTEUR 3 1.3 RÉSUMÉ DES MOBILISATIONS 4 1.3.1 Mobilisation ...

Refine SearchDisplay Filters

Last ModifiedDisplay Filters

Filters

Result Type Display Filters

Key Document Display Filters

Date modified: