Bilijk Wetland Compensation – Public Comments Invited

July 22, 2024 – Indigenous Services Canada must determine whether the proposed Bilijk Wetland Compensation project is likely to cause significant adverse environmental effects.

To help inform this determination, Indigenous Services Canada is inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online.

Written comments must be submitted by August 22, 2024, to:

Indigenous Services Canada – Environment

PO BOX 160

Amherst, NS

B4H 3Z3

paeat-erpat@sac-isc.gc.ca

The Proposed Project

The project consists of regarding and replacing culverts to improve drainage across the road and is anticipated to enhance adjacent wetland habitats. Activities also include removal of debris and shrub/tree planting that is anticipated to improve hydraulic conditions in the stream and adjacent floodplain wetlands. Activities will be accomplished with a combination of heavy equipment (excavators, dump trucks, dozers and graders) as well as manual labor and hand tools.  

Document reference number: 1

Date modified: