Public Comment Period on Intent to Make a Determination
Development Work and Generator Installation – Pointe-à-Carcy Naval Complex

November 29, 2023 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects.

To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals should consult the Privacy Notice on the Registry website.

Written comments must be submitted by Decmeber 8, 2023 to:
Francois Simard, Project Manager
Mailing Address:  BS 2 Div CA, Valcartier
Postal Box 1000: Succ Forces
Quebec, Canada, G0A 4Z0
E-mail:  Francois.simard2@forces.gc.ca

The Proposed Project

The Department of National Defence (DND) has proposed a project which consists of the installation of two emergency generators protected by a shelter. The fuel system will be under the shelter and will be connected to the generators. The capacity of the petroleum storage system must be sufficient to power the generators for at least 48 hours and will be more than 5,000 liters. The concrete paving will be removed to allow the passage of underground electrical conduits and then put back on site.

Following this work, it is planned to redevelop the park and reforest the areas affected by the cutting of ash trees in 2023. The development includes repair and straightening the structure of the boardwalk and its deck along the exterior Louise basin, highlighting and revegetating the site.

Document reference number: 1