Alexander Wastewater Treatment Facility Project – Public Comments Invited

May 13, 2022 – Indigenous Services Canada must determine whether the proposed Alexander Wastewater Treatment Facility Project located in Alexander First Nation is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting comments from the public respecting that determination.

Written comments must be submitted by June 13, 2022 to:

Cassandra Breton
630 Canada Place
9700 Jasper Ave, Edmonton, AB
T5J 4G2
cassandra.breton@sac-isc.gc.ca

The Proposed Project

Alexander First Nation plans to construct a new mechanical wastewater treatment plant. The proposed wastewater treatment plant will include the development of an access road as well as a new force main line to the plant from the two lift stations in the townsite. The two existing lift stations will be replaced by new stations at the same locations. Additionally, two greenhouse shelters will be built at the treatment plant site to dry biosolids for compost or reuse. 

Document Reference Number: 1

Date modified: