October 23nd, 2020 – The Montreal Port Authority (MPA) has determined that the proposed project of Ogilvie Culvert Decommissioning at the ADM facilities is not likely to cause significant adverse environmental effects.

Mitigation measures taken into account for this determination are:

  • Fish protection
  • Containment and spill management
  • Erosion and sediment control
  • Contaminated soil management
  • Waste management
  • Operation of machinery

Therefore, the MPA may perform any duty or function to enable the project to be carried out in whole or in part.