Notice of Determination

Royal Military College, Kingston Ontario — December 3, 2019 — The Department of National Defence has determined that the proposed Royal Military College East Shoreline Stabilization Winter/Spring 2020 is not likely to cause significant adverse environmental effects.

This determination was based on a consideration of the following factors:
• technically and economically feasible mitigation measures.

The Department of National Defence is satisfied that that the carrying out of the project is not likely to cause significant adverse environmental effects.

Therefore, the Department of National Defence may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.

Document reference number: 2

Date modified: