From IDM Mining Ltd. to the Canadian Environmental Assessment Agency re: Response to First Information Requests Related to the Environmental Impact Statement (see reference document # 23)
Memo (PDF – 475 KB)
- Appendix IR1-03-A: Updated Soil Screening Levels and References (PDF – 140 KB)
- Appendix IR1-04-A: Attachment 5 of the Action Item Response memo dated November 29, 2017 (PDF – 5.91 MB)
- Appendix IR1-05-A: Plant and Fish BCFs (PDF – 184 KB)
- Appendix IR1-07-A: Toxicity Profiles for PM and NO2 (PDF – 325 KB)
- Appendix IR1-09-A: May 2017 Field Visit Report (PDF – 841 KB)
- Appendix IR1-09-B: Fall 2017 Field Visit Report (PDF – 4.2 MB)
- Appendix IR1-11-A: Photos of Bitter Creek (PDF – 12.7 MB)
- Appendix IR1-11-B: Access Road Hydrotechnical Drawings (PDF – 37.4 MB)
- Appendix IR1-11-C: Supplemental Photos for the Bitter Creek Hydrotechnical Assessment Study Area (PDF – 28.7 MB)
- Appendix IR1-11-D: Bitter Creek Hydrotechnical Assessment Report (PDF – 5.34 MB)
- Appendix IR1-12-A: Representativeness of WR Dataset (PDF – 1.5 MB)
- Appendix IR1-15-A: TMF Closure Objectives (PDF – 1.62 MB)
Document Reference Number: 24