Archived - Archived Replacement Class Screening Report

Archived Content

Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact us to request a format other than those available.

The Installation, Operation, Expansion, Modification, Removal, and/or Decommissioning of Aboveground Storage Tank Systems (Petroleum or Allied Petroleum Products)

This report was declared by the Agency as a class screening report on February 26, 2010, following a public comment period held between January 8, 2010 and February 6, 2010.

The Agency acknowledged the commitment of Fisheries and Oceans Canada to use the class screening report for the environmental assessment of all projects to fall within this class. The declaration of this report was effective until February 26, 2015.

Note: This class screening is no longer required because the Canadian Environmental Assessment Act was repealed.

Document List

Report

Replacement Class Screening Report (Final)


Statement of Project   (July 1 to September 30, 2010)

Prince Edward Island  (4 projects)

Souris

  • 10-02-56765 Installation of 4546L steel double-walled aboveground storage tanks at Souris SAR Station
  • 10-02-56763 Installation of 1000L steel double-walled aboveground storage tanks at Souris SAR Station

Summerside

  • 10-02-56768 Installation of new 4546L steel double-walled aboveground storage tank Summerside SAR Station
  • 10-02-56766 Installation of new 1000L steel double-walled above ground storage tank at Summerside SAR Station