Routine In-Water Works Project Along the Rideau Canal and the Trent-Severn Waterway

This report was declared by the Agency as a class screening report on December 6, 2006, following a public comment period held between July 26, 2006 and September 7, 2006.

The Agency acknowledged the commitment of the Parks Canada Agency to use the class screening report for the environmental assessment of all projects to fall within this class. The declaration of this report was effective until December 6, 2011.

Document List

Report

Replacement Class Screening Report


Statement of Project   (July 1 to September 30, 2009)

Ontario  (70 projects)

Bastard

Big Chute

  • 09-02-49749 Painting of Railings at Locks and Dams and Bridges - Northern Sector

Bobcaygeon

  • 09-02-49749 Painting of Railings at Locks and Dams and Bridges - Northern Sector

Bolsover

  • 09-02-49749 Painting of Railings at Locks and Dams and Bridges - Northern Sector

Couchiching, Lake

  • 09-02-49749 Painting of Railings at Locks and Dams and Bridges - Northern Sector

Douro

  • 09-02-49829 Dewatering and Minor Lock/Dam Maintenance - Locks 2, 4, 5, 23

Drummond/North Elmsley

Fenelon Falls

  • 09-02-49749 Painting of Railings at Locks and Dams and Bridges - Northern Sector

Gamebridge

  • 09-02-49749 Painting of Railings at Locks and Dams and Bridges - Northern Sector

Katchewanooka Lake

Kingston

  • 09-02-54464 Installation of 6x25 floating dock.Installation of rip-rap around dock location

Kirkfield

  • 09-02-49749 Painting of Railings at Locks and Dams and Bridges - Northern Sector

Lanark

  • 09-02-51703 Cement dock edge repair at Beveridges lock

Lindsay

  • 09-02-49749 Painting of Railings at Locks and Dams and Bridges - Northern Sector

Little Cranberry Lake

Manotick

Merrickville

  • 09-02-51843 Cement dock edge repair Merrickville lockstation

North Crosby

  • 09-02-55352 Weed removal.Creation 10 feet wide route for motor boat
  • 09-02-55346 Installation of 20x8 Floating Dock with 4 x12 access ramp
  • 09-02-55340 Replace top log crib .Installation of lock supporting deck, new squirting and decking

Ottawa

  • 09-02-56457 Installation of four piles to supporting existing structure. removal of temporary dock
  • 09-02-56426 Repair and replacement of covered porch support for cottage.Demolition of in-lake Boathouse
  • 09-02-55349 Aquatic vegetation harvesting
  • 09-02-55333 Removal of wall and installation of rip-rap
  • 09-02-55328 Remove existing walls and decking .Replace with rip rap .Install new finger dock
  • 09-02-55325 Installation of 8x32 floating aluminum dock
  • 09-02-55323 Replace pressure treated wood post with aluminum tube structure
  • 09-02-54506 1561951 Ontario Limited
  • 09-02-54504 Replacing of Floating dock with a pile dock of the same size
  • 09-02-54503 Installation of 16x10 deck/dock and shoreline rip-rap
  • 09-02-54502 Installation of pile dock with retaining wall for erosion protection
  • 09-02-54501 Remove existing wall
  • 09-02-54494 Installation of pile dock with four piles
  • 09-02-54466 Installation of rip-rap on shoreline and 8x16 dock
  • 09-02-54461 Replace existing dock with 32x6 dock.Install rip-rap along shoreline
  • 09-02-54460 Removal of old concrete slab and log retaining wall.Placement of rip-rap along waterfront
  • 09-02-54459 Installation of a 10 x25 pile dock
  • 09-02-54457 Installation of riprap , new 8x20 dock

Port Severn

  • 09-02-49749 Painting of Railings at Locks and Dams and Bridges - Northern Sector

Quinte West

  • 09-02-49829 Dewatering and Minor Lock/Dam Maintenance - Locks 2, 4, 5, 23

Rideau Lakes

  • 09-02-56445 Weed removal
  • 09-02-56430 Restore and Rebuild Shoreline
  • 09-02-56428 Strip Crib to low waterline, rebuild and replace boathouse damaged by tornado
  • 09-02-55348 Installation of new 4x16 floating dock
  • 09-02-55342 Shoreline Erosion Protection on either side of the dock
  • 09-02-55341 Remove 13 concrete barrels filled barrels from shore and repair shoreline using rip rap
  • 09-02-55339 Placement of 8x8 floating wooden swim raft
  • 09-02-55337 Replacement of 8x16 floating dock with two 8x16 fixed docks
  • 09-02-55336 Install filter cloth and riprap to stabilize shoreline.Remove old concrete walls
  • 09-02-55330 Installation of 8x20 floating dock
  • 09-02-55329 Repair existing crib dock
  • 09-02-55327 Replace existing original dock with a 32x6 dock
  • 09-02-54509 Installation of filter cloth
  • 09-02-54500 Installation of 30x6 removable dock.Installation of boatlift.Installation of rip-rap
  • 09-02-54490 Remove and replace existing dock
  • 09-02-54477 Installation of Log Boom
  • 09-02-54472 Installation of floating dock or post dock of no more then 8 x32.Installation of a floating 10x10 raft
  • 09-02-54470 Shoreline protection and Erosion Control
  • 09-02-54469 Lift boathouse

Rosedale

  • 09-02-49749 Painting of Railings at Locks and Dams and Bridges - Northern Sector

Severn Bridge

  • 09-02-49749 Painting of Railings at Locks and Dams and Bridges - Northern Sector

Severn River

South Frontenac

Swift Rapids

  • 09-02-49749 Painting of Railings at Locks and Dams and Bridges - Northern Sector

Talbot River

  • 09-02-49749 Painting of Railings at Locks and Dams and Bridges - Northern Sector

Upper Rideau Lake

  • 09-02-55335 Installation of 32 foot post dock with 10 foot slip

Washago

  • 09-02-49749 Painting of Railings at Locks and Dams and Bridges - Northern Sector

Woodville

  • 09-02-49749 Painting of Railings at Locks and Dams and Bridges - Northern Sector