Archived - Archived Replacement Class Screening Report
Archived Content
Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact us to request a format other than those available.
Routine In-Water Works Project Along the Rideau Canal and the Trent-Severn Waterway
This report was declared by the Agency as a class screening report on December 6, 2006, following a public comment period held between July 26, 2006 and September 7, 2006.
The Agency acknowledged the commitment of the Parks Canada Agency to use the class screening report for the environmental assessment of all projects to fall within this class. The declaration of this report was effective until December 6, 2011.
Document List
Report
Replacement Class Screening Report
Statement of Project (July 1 to September 30, 2008)
Ontario (45 projects)
Bastard
- 08-02-56610 Remove boathouse and small shed.Restore shoreline to natural conditions
- 08-02-56557 Removal of existing 8x40 wooden crib dock and install 20x8 floating dock with 4x12 ramp
Big Bob Channel
- 08-02-40592 Painting of Railings at Locks and Dams and Bridges - Northern Sector
Burritts Rapids
- 08-02-51849 Burritts rapids bridge rehabilitation
Clear Lake
- 08-02-40573 Painting of Railings at Locks and Dams - Kawartha Sector
Couchiching, Lake
- 08-02-40592 Painting of Railings at Locks and Dams and Bridges - Northern Sector
Crowe Bay
- 08-02-40598 Painting of Railings at Locks and Dams and Bridges - Southern Sector
Drummond/North Elmsley
- 08-02-56620 Crib dock repairs
- 08-02-56541 Installation new 4x18 dock along inland boat slip
Fenelon River
- 08-02-40592 Painting of Railings at Locks and Dams and Bridges - Northern Sector
Gooderham Lake
- 08-02-40572 Painting of Railings at Locks and Dams - Haliburton
Halls Lake
- 08-02-40572 Painting of Railings at Locks and Dams - Haliburton
Hogs Back
- 08-02-51851 Hogs Back swing bridge - structural elements rehabilitation
Katchewanooka Lake
- 08-02-40573 Painting of Railings at Locks and Dams - Kawartha Sector
Kingston
- 08-02-56568 Installation of 4x5 shore pier and attach floating T shaped docks.Removal of dilapidated dock
Leeds and the Thousand Islands
- 08-02-56607 Replacement of floating docks and repair of crib docks
Little Glamor Lake
- 08-02-40572 Painting of Railings at Locks and Dams - Haliburton
Little Hawk Lake
- 08-02-40572 Painting of Railings at Locks and Dams - Haliburton
Lovesick Lake
- 08-02-40573 Painting of Railings at Locks and Dams - Kawartha Sector
Lower Buckhorn Lake
- 08-02-40573 Painting of Railings at Locks and Dams - Kawartha Sector
Manotick
- 08-02-51853 Manotick bridge wharf removal
Montague
- 08-02-56567 Installation of new 6x16 post dock with a 6x8 ramp
Moore Lake
- 08-02-40572 Painting of Railings at Locks and Dams - Haliburton
Murray Canal
- 08-02-40598 Painting of Railings at Locks and Dams and Bridges - Southern Sector
North Grenville
- 08-02-56555 Installation of new L shaped removable aluminium post deck
Otonabee River
- 08-02-40573 Painting of Railings at Locks and Dams - Kawartha Sector
Ottawa
- 08-02-56614 Replacement of stone and filter cloth
- 08-02-56564 Replace steel retaining wall with rip-rap
- 08-02-56562 Addtion to floating dock for non motorized boats
- 08-02-56559 Installation of 22x10 pile dock parralel to the shore
- 08-02-56552 Installation of 8x32 pile dock with 7ft ramp
- 08-02-56543 Installation of 85 m of rip-rap at the toe of a slope
- 08-02-56402 Dock Repair
Percy Reach
- 08-02-40598 Painting of Railings at Locks and Dams and Bridges - Southern Sector
Rideau Lakes
- 08-02-56636 Replace and repair boathouse and docks
- 08-02-56612 Replacement of existing steel post dock with aluminium lift dock
- 08-02-56544 Installation of new 8x24 post dock on main lake side
Rosedale River
- 08-02-40592 Painting of Railings at Locks and Dams and Bridges - Northern Sector
Scugog River
- 08-02-40592 Painting of Railings at Locks and Dams and Bridges - Northern Sector
Severn River
- 08-02-40592 Painting of Railings at Locks and Dams and Bridges - Northern Sector
Shadow Lake
- 08-02-40572 Painting of Railings at Locks and Dams - Haliburton
Talbot River
- 08-02-40592 Painting of Railings at Locks and Dams and Bridges - Northern Sector
Tay Valley
- 08-02-56536 Installation of T shaped floating dock
Trent River
- 08-02-40598 Painting of Railings at Locks and Dams and Bridges - Southern Sector
Wolford
- 08-02-56606 Installation of new 24" post dock
- Date modified: