Routine In-Water Works Project Along the Rideau Canal and the Trent-Severn Waterway

This report was declared by the Agency as a class screening report on December 6, 2006, following a public comment period held between July 26, 2006 and September 7, 2006.

The Agency acknowledged the commitment of the Parks Canada Agency to use the class screening report for the environmental assessment of all projects to fall within this class. The declaration of this report was effective until December 6, 2011.

Document List

Report

Replacement Class Screening Report


Statement of Project   (January 1 to March 31, 2008)

Ontario  (33 projects)

Bastard

  • 08-02-56525 Remplacing top planks and side planks of wooden crib dock
  • 08-02-56473 Repair of 12 crib dock.Add a 12x12 dock, remove 17 crib dock and install 17 of rip rap along the shoreline

Jones Falls

Leeds and the Thousand Islands

  • 08-02-56498 Replacing existing crib dock with a 8x20 floating dock
  • 08-02-56444 Installation of Erosion protection and 40x4 floating dock
  • 08-02-56439 Installation of Rip-rap shoreline stabilization and a 40x4 floating dock

North Crosby

  • 08-02-56515 Installation of aluminium T shaped post dock

North Grenville

  • 08-02-56694 Repairs tto concrete culvert and shoreline stabilization
  • 08-02-56504 Removal of downed tree, existing retaining wall.Installation of rip rap along the shoreline
  • 08-02-56462 Shoreline stabilization with approxiimately 103 of rip rap

Ottawa

  • 08-02-56520 Investigative borehole drilling
  • 08-02-56466 Installation of new pile dock
  • 08-02-56460 Re-install treated 6x6 timbers on gabion wall after re-leveling cages
  • 08-02-56452 Construction and installation of new 5x20 dock
  • 08-02-56450 Install Rip-Rap(stone) for erosion protection
  • 08-02-56431 Remove Existing Steel Retaining Wall, Replace with Rip-rap an rehabilitated inland boat slip
  • 08-02-56427 Shoreline Stabilization

Perth

Rideau Lakes

  • 08-02-56511 Raise front of boathouse by approximately 2"
  • 08-02-56509 Repairs to existing crib dock
  • 08-02-56507 Installation of U shaped crib dock(32x26) with boathouse
  • 08-02-56496 Addition of two 6x20 docks
  • 08-02-56476 Repair and replace crib work to strengthen and re-level boathouse
  • 08-02-56464 Installation of Floating Boathouse 26x32 which includes a 4 ramp
  • 08-02-56456 Installation of new floating dock and removal of existing dock
  • 08-02-56447 Repair Existing Stone Wall
  • 08-02-56446 Removal of all exisiting cribs, rail ties and boathouses.Replace with new dock and long boat slip
  • 08-02-56442 Removal of existing 8x20 crib dock and replacing with 8x16 floating cedar dock
  • 08-02-56423 Construction of a 24x32 U shaped dock and a 18x29 boathouse on the deck

Rideau River

Smiths Falls

South Frontenac

  • 08-02-56468 Replace floating dock( 24x8) with a 32x8 dock
  • 08-02-56454 Installation of 8x16 floating dock with a 4x12 ramp