Archived - Archived Replacement Class Screening Report

Archived Content

Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact us to request a format other than those available.

Routine In-Water Works Project Along the Rideau Canal and the Trent-Severn Waterway

This report was declared by the Agency as a class screening report on December 6, 2006, following a public comment period held between July 26, 2006 and September 7, 2006.

The Agency acknowledged the commitment of the Parks Canada Agency to use the class screening report for the environmental assessment of all projects to fall within this class. The declaration of this report was effective until December 6, 2011.

Document List

Report

Replacement Class Screening Report


Statement of Project   (July 1 to September 30, 2007)

Ontario  (42 projects)

Bastard

Chaffeys Locks

Drummond/North Elmsley

  • 07-02-56643 Installation of aluminium dock
  • 07-02-56641 Installation of new fendock with 8 ft ramp, 24 ft dock and weed harvesting

Jones Falls

Kingston

  • 07-02-56700 Installation of a 6x45 pile dock and rip-rap
  • 07-02-56696 Shoreline stabilization and installation of floating dock with ramp
  • 07-02-56674 Installation of shore pier with a 6" ramp, a 4x8 intermediate dock and a 6x16 t shaped

Kingston Mills

  • 07-02-51871 Coping and Quoin Repairs of lock 46, Kingston Mills
  • 07-02-51866 Concrete deck repair- Fortis dam- Kingston mills

Little Cranberry Lake

Lovesick Lake

Montague

Otonabee River

Ottawa

Rideau Lakes

  • 07-02-56705 Manually remove 2-3 ft of rubble riverbed
  • 07-02-56698 Replacing existing top 2 timbers on exisitng dock
  • 07-02-56684 Removal of old floating dock.Installation of 8x16 dock with a 4x12 ramp
  • 07-02-56683 Replacement of existing deck
  • 07-02-56680 Shoreline stabilization
  • 07-02-56679 Installation of rip-rap to protect from shoreline erosion
  • 07-02-56676 Installation of a floating dock
  • 07-02-56666 Installation of floating dock, with a 5x22 ramp and a 8x17 one
  • 07-02-56663 Attach a new 6x20 floating dock onto end of existing crib dock
  • 07-02-56662 Installation of 48x5 dock and a 10x10 boat lift
  • 07-02-56661 Repair existing timber wall
  • 07-02-56433 Cutting and Removal of Weeds

Smiths Falls

South Frontenac

  • 07-02-56710 Construction of 2x40 walking bridge
  • 07-02-56667 Removal of existing dock and replace with 8x20 floating dock with 5" ramp

Tay Valley

  • 07-02-56682 Shoreline stabilizaton using rip rap
  • 07-02-56677 Installation of 8x16 floating dock with 5x10 ramp

Trent River

Wolford

  • 07-02-56664 Installation of a 4x16 aluminium dock with a 8" ramp
  • 07-02-56640 Installation of new 4x16 dock with 8" ramp