Archived - Archived Replacement Class Screening Report
Archived Content
Information identified as archived is provided for reference, research or recordkeeping purposes. It is not subject to the Government of Canada Web Standards and has not been altered or updated since it was archived. Please contact us to request a format other than those available.
Routine In-Water Works Project Along the Rideau Canal and the Trent-Severn Waterway
This report was declared by the Agency as a class screening report on December 6, 2006, following a public comment period held between July 26, 2006 and September 7, 2006.
The Agency acknowledged the commitment of the Parks Canada Agency to use the class screening report for the environmental assessment of all projects to fall within this class. The declaration of this report was effective until December 6, 2011.
Document List
Report
Replacement Class Screening Report
Statement of Project (April 1 to June 30, 2007)
Ontario (26 projects)
Drummond/North Elmsley
- 07-02-56714 Installation of 5x26 floating aluminium dock
- 07-02-56711 Installation of new marine railway
Jones Falls
- 07-02-51921 Gate Painting Jones Falls
Lanark
- 07-02-51878 Cement dock edge repair
- 07-02-51876 Repair to blueline detached
Merrickville Blockhouse National Historic Site of Canada
- 07-02-51880 Painting gates
Montague
- 07-02-56703 Installation of seasonal floating dock with ramp
North Grenville
- 07-02-56704 Installation of 48" dock
- 07-02-51875 Sparks Bridge emergency repairs
Ottawa
- 07-02-56725 Shoreline stabilisation with rip-rap
- 07-02-56709 Replace existing dock with a 5x26 post dock on wheels
- 07-02-56701 Installation of a U-shaped post dock
- 07-02-56699 Installation of aerial electric line
- 07-02-56692 Installation of 24x4 floating dock
- 07-02-56691 Bridge Rehabilitation
- 07-02-56690 Installation of floating L shaped dock
- 07-02-56686 Installation of L shaped floating 10x40 dock attached with a 5x40 ramp
- 07-02-56678 Installation of 32x6 pile dock
Rideau Lakes
- 07-02-56708 Replace four top layers of crib of a dock
- 07-02-56707 Removal of 14x17 crib dock and replace with 24x17 boathouse
- 07-02-56695 Installation of 6x30 pipe dock
- 07-02-56685 Installation of 12x8 floating dock with a 12 x32 ramp
- 07-02-56665 Aquatic Vegetation Removal
South Frontenac
- 07-02-56719 Repairing existing floating docks and expand existing docks
- 07-02-56702 Installation of 8x16 floating dock with 4x12 ramp
- 07-02-56659 Laying of submarine cable
- Date modified: