Routine Front-country Projects in Lake Louise and Yoho and Kootenay National Parks

This report was declared by the Agency as a class screening report on September 6, 2006, following a public comment period held between May 10, 2006 and June 9, 2006.

The Agency acknowledged the commitment of the Parks Canada Agency to use the class screening report for the environmental assessment of all projects to fall within this class. The declaration of this report was effective until September 6, 2011.

Document List

Report

Model Class Screening Report


Statement of Project   (all projects)

Alberta  (24 projects)

Banff National Park of Canada

  • 11-02-62495 Waterfowl Campground Greywater Sink Project
  • 10-02-57626 Aerial Patrols
  • 10-02-53266 Waterfowl Camground Privy Replacement
  • 09-02-52307 Moraine Lake Washroom Removal
  • 09-02-50003 Helen Lake Pumpout Toilet Replacement
  • 09-02-50002 Herbert Lake Pumpout Toilet Replacement
  • 08-02-42521 Icefields Parkway Viewpoints Maintenance
  • 08-02-39389 Rampart Creek Campground Privy Installation and Replacement
  • 07-02-35831 Waterfowl Campground Geotechnical Investigation
  • 07-02-32592 LLYK Campgrounds- Installation of water treatment systems
  • 06-02-23911 Parker Ridge and Hilda Creek Trailhead: Installation of Information Kiosks

Lake Louise

  • 11-02-63720 Lake Louise Townsite Fibre Optic Cable Installation - Visitor Centre to Wastewater Treatment Plant
  • 11-02-63718 Lake Louise 953S Substation Upgrade
  • 09-02-48481 Upper Lake Louise Day Use Area Flagpole Installation
  • 09-02-48212 Upper Lake Louise Abandoned Washroom Removal and Site Rehabilitation
  • 07-02-26932 Niblock Gate Propane Tank Installation
  • 07-02-25651 Issuance of lease for parcel HQ (CLSR 85810)
  • 07-02-25647 Privy Replacement
  • 06-02-22724 Lake Louise Campground Shed Replacement

Protection Mountain

  • 09-02-48215 Protection Mountain Campground Hazardous Tree Removal

Rampart Creek

  • 09-02-48213 Rampart Creek Campground Hazardous Tree Removal

Saskatchewan River Crossing

  • 09-02-46809 Saskatchewan Crossing Trailer Removal
  • 08-02-44268 Saskatchewan Crossing Weather Station Installation

Waterfowl Lakes

  • 09-02-48214 Waterfowl Campground Hazardous Tree Removal

British Columbia  (19 projects)

Field

Kootenay National Park of Canada

  • 11-02-63719 Marble Canyon Campground Hybrid Solar Generator System Installation
  • 11-02-62530 Paint Pots Day Use Area Privy Replacement
  • 10-02-53598 Marble Canyon Toilet Replacement
  • 07-02-32592 LLYK Campgrounds- Installation of water treatment systems
  • 07-02-26944 Marble Canyon Campground Buffalo Berry Bush Removal
  • 07-02-25649 Marble Canyon Trail Improvements
  • 07-02-25647 Privy Replacement

Radium Hot Springs

Yoho National Park of Canada

  • 11-02-62531 Takakkaw Falls Campground and Finn Creek Day Use Area Hazard Tree Removal
  • 11-02-62438 Kicking Horse Campground Avalanche Debris Removal
  • 11-02-62437 Natural Bridge Day Use Area - Removal of Hazardous Trees
  • 08-02-42529 Kicking Horse, Redstreak and Lake Louise Campground Sink Installations
  • 07-02-32592 LLYK Campgrounds- Installation of water treatment systems
  • 07-02-30933 Chancellor Peak Campground Improvements
  • 07-02-29480 Kicking Horse Campground Manhole Replacement
  • 07-02-25648 Hoodoo Creek Campground Site Repairs
  • 07-02-25647 Privy Replacement