Heidelberg Materials Barclay Point Barge Offloading Facility

PUBLIC NOTICE 

Heidelberg Materials Barclay Point Barge Offloading Facility – Public Comments Invited 

October 16th, 2026 – Transport Canada must determine whether the proposed Heidelberg Materials Barge Offloading Facility, located in Victoria, BC, is likely to cause significant adverse environmental effects. 

To help inform this determination, Transport Canada is inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online.  

Written comments must be submitted by November 15, 2026 to: 

Impact Assessment - Western Yukon Region
Transport Canada
Suite 820
800 Burrard Street
Vancouver, British Columbia V6Z 2J8
Email: TC.WYREnvironment-EnvironnementROY.TC@tc.gc.ca

The Proposed Project 

Heidelberg Materials is proposing to build a barge offloading facility near Barclay Point in Victoria Upper Harbour, British Columbia. The Project will involve dredging of the berth, as well as installation of a steel conveyor head frame supported by 4 steel pilings with a material conveyor extending to the shore above the high tide line. This includes installation of approximately five steel berthing dolphins perpendicular to the shoreline spanned by wooden boomsticks. Transport Canada (TC) is reviewing the project for approval under the Canadian Navigable Waters Act (CNWA) and the Public Ports and Public Port Facilities Regulations (PPPPFR), as the proposed project falls within lands administered by Transport Canada. TC will also be issuing a lease to enable the work. 

Document reference number: 1

Date modified: