Marshdale Natural Gas Power Generation Facility Project

Comment Search Mobile

Comment Search

Skip to filters

28 results

Attachment Fast Acting Natural Gas Power Generation Facility– Marshdale, Pictou County

  • Marshdale Natural Gas Power Generation Facility Project
  • Author: Administrator on behalf of Mi’kmaq Nation
  • Reference number: 25
  • Submitted: 2026-02-10 - 8:02 AM
  • Project phase: Planning
  • Participation notice: Public notice - Comments invited on the summaries of the Initial Project Descriptions and funding available
  • See the attached submission / Veuillez consulter la pièce jointe
  • Attachment included
  • Page 1 of 6 February 9, 2026 Jeremy Higgins Environmental Assessment Officer Environmental Assessment Branch Nova Scotia Environment and Climate Change jeremy.higgins@novascotia.ca Mr. Higgins, Re: Fast Acting Natural Gas Power Generation Facility – Marshdale, Pictou County I write in response to your letter dated December 22, 2025, in which the province has declined to adhere to its consultation obligations pursuant to the Constitution Act, 1982 and the Terms of Reference for a Mi’kmaq-Nova Scotia-Canada Consultation Process (ToR) as ratified on August 31, 2010, on the above noted project. This letter will also serve as a response to the Impact Assessment Agency of Canada’s (IAAC) letter dated January 5, 2026. The Mi’kmaq Nation in Nova Scotia has a general interest in all lands and resources in Nova Scotia as the Mi’kmaq Nation has never surrendered, ceded, or sold the Aboriginal title to any of its lands in Nova Scotia. The Mi’kmaq have a title claim to all of Nova Scotia and as co-owners of the land and its resources it is expected that any potential impacts to rights and title shall be addressed. It is our expectation that Consultation will be forthcoming. With this Environmental Assessment being “engaged” on alongside the federal Impact Assessment Agency of Canada (IAAC) assessment being conducted in parallel, it is disappointing there is no offer to consult at this time and being classified as “engagement”. Contrary to the statement in your previous letter that “the nature of this project is not likely to lead to appreciable adverse impacts to credibly asserted or established Mi’kmaq Aboriginal or Treaty rights,” it is the ...

Report

Attachment Please switch to renewables

  • Marshdale Natural Gas Power Generation Facility Project
  • Author: Nicole Corrado
  • Reference number: 22
  • Submitted: 2026-02-09 - 11:54 PM
  • Project phase: Planning
  • Participation notice: Public notice - Comments invited on the summaries of the Initial Project Descriptions and funding available
  • Please switch to renewable energy projects.  ???I noticed a lot of wildlife live here.  ?????Please preserve the trees at this location. Please do not harm animals with this project. Please do not use animal testing for pollution and effluent monitoring. https://www.change.org/p/stop-testing-sewer-water-on-laboratory-fish ?Please work with the Canadian Centre for the Alternatives to Animal Methods. https://www.uwindsor.ca/ccaam/ Please only use non lethal ways to live with geese, beavers, and other wildlife. Develop a Living With Coyotes program with the animal welfare organization Coyote Watch Canada. www.coyotewatchcanada.com Please only use non lethal ways to manage wildlife. There are humane, non lethal ways to deal with beavers. Here's a great resource. https://thefurbearers.com/downloads/PDFs/Beaver%20Book%20-%202019-10-08%20The%20Fur-Bearers.pdf?fbclid=IwAR1fP2wOYQKbWREX0E5QzYBhZLf9VjwMov3p37Vh8ToW1-NeQvAoVATZhEg%0A%0A https://www.change.org/p/stop-banff-from-killing-animals-after-conflicts https://www.humanesociety.org/resources/humanely-scare-away-canada-geese https://www.canadageese.org/nlcontrol.html https://www.peta.org/wp-content/uploads/2021/06/humane-goose-control-pdf.pdf https://www.humanesociety.org/resources/what-do-about-canada-geese This company makes non lethal products. https://margosupplies.com/ca-en/ ? Conventional rodent control uses cruel methods. The companies use glue traps, and snap traps, which, like legholds, can cause injury. They also use rodenticide, which kills slowly and kills many non target ...

Report

Attachment Marshdale and Salt Springs Proposed Gas Power Generation Plants

  • Marshdale Natural Gas Power Generation Facility Project
  • Author: Amanda Dunfield
  • Reference number: 21
  • Submitted: 2026-02-09 - 10:59 PM
  • Project phase: Planning
  • Participation notice: Public notice - Comments invited on the summaries of the Initial Project Descriptions and funding available
  • please see comment attached as pdf file
  • Attachment included
  • Please accept this correspondence as a formal request that the Impact Assessment Agency of Canada deny approval of the proposed natural gas power generation facilities in Marshdale and Salts Springs, Pictou County, Nova Scotia. I submit this request as a former resident of both Concord Road and Lorne Station Road, in the communities of Glengarry Station and Lorne, respectively. Basis for Request 1. Climate, public health, and policy alignment concerns Approval of these facilities is incompatible with Nova Scotia’s climate commitments and broader public health and sustainability objectives. Nova Scotia has committed to achieving net-zero emissions by 2035, while the proponent has indicated these facilities could operate upwards of 45 years. The combustion of natural gas and diesel fuel produces nitrogen oxides, particulate matter, and greenhouse gases, all of which are associated with adverse public health outcomes. The Canadian Association of Physicians for the Environment and Lung Health Associations have publicly opposed new fossil fuel infrastructure and have called for moratorium on such developments in the interest of public health. Similarly, Ontario’s Ministry of Energy has requested that the IESO evaluate a moratorium on new natural gas generation procurements, citing emissions and related concerns. At the federal level, the Government of Canada has stated that all departments and agencies are responsible for implementing the UN 2030 Agenda for Sustainable Development, advancing environmental protection and supporting a sustainable, future-proof economy. Approval of these projects runs counter to these stated objectives and international commitments. 2. Impacts to ...

Report

Attachment Sierra Club Comments Marshdale Natural Gas Power Generation Facility Project, Ref. No. 90111

  • Marshdale Natural Gas Power Generation Facility Project
  • Author: Administrator on behalf of Gretchen Fitzgerald, on behalf of Sierra Club Canada Foundation
  • Reference number: 26
  • Submitted: 2026-02-09 - 10:38 PM
  • Project phase: Planning
  • Participation notice: Public notice - Comments invited on the summaries of the Initial Project Descriptions and funding available
  • See the attached submission / Veuillez consulter la pièce jointe
  • Attachment included
  • Comments on the Marshdale Natural Gas Power Generation Facility Project, Ref. No. 90111 February 9, 2026 Executive Summary Sierra Club Canada Foundation submits these comments to the Impact Assessment Agency of Canada (IAAC) regarding the proposed Marshdale Natural Gas Power Generation Facility in Nova Scotia. These comments are directed specifically to IAAC’s screening role under the Impact Assessment Act (IAA). The question before IAAC at this stage is narrow but consequential: does the existing environmental assessment record provide a defensible basis to conclude that a comprehensive federal impact assessment is not required? Based on the Environmental Assessment Registration Document (EARD) and associated materials, Sierra Club Canada Foundation submits that it does not. Across multiple issue areas within federal jurisdiction, the EA record exhibits a consistent and material pattern: potential adverse effects are systematically understated, not because evidence demonstrates they are insignificant, but because key analytical steps are deferred, scoped narrowly, or based on assumptions that are not defined, enforceable, or tested within the EA record itself. This pattern recurs across climate change, project need, alternatives, human health and air pollution, water and groundwater, wetlands and terrestrial habitat, species at risk and migratory birds, fish and fish habitat, and cumulative effects. Climate Change and Greenhouse Gas Emissions The assessment claims the project aligns with climate goals, but it doesn’t specify how often the facility will run or what its long-term emissions might be. There are no enforceable limits or detailed analysis of worst-case scenarios. ...

Report

Attachment IESO beggars need to be stopped

  • Marshdale Natural Gas Power Generation Facility Project
  • Author: Salt Springs and Marshdale
  • Reference number: 20
  • Submitted: 2026-02-09 - 10:32 PM
  • Project phase: Planning
  • Participation notice: Public notice - Comments invited on the summaries of the Initial Project Descriptions and funding available
  • The Proposed toxic gas plants in Marshdale and Salt Springs needs to be immediately rejected to prevent IESO from using anymore taxpayers dollars.  They refuse to speak to the public and there appears to be a lot of provincial corruption surrounding natural gas projects that are currently failing throughout Canada.     Stopping a natural gas plant requires a combination of local organizing, legal challenges, and political pressure to force municipalities and regulators to reject permits. Key strategies include  lobbying for municipal resolutions against the project, campaigning for stronger federal clean electricity regulations, and highlighting the health and environmental risks to build public opposition.  Here are actionable steps to stop a natural gas plant: 1. Organize Local Opposition  Form a Coalition: Build a community group to share information, organize events, and raise voices against the project. Engage Municipal Leaders: New projects often require municipal support. Pressure city council members to pass resolutions opposing the plant. Mobilize the Community: Use social media, public meetings, and rallies to raise awareness about the health risks—such as toxic pollutants—and climate impact.    2. Legal and Regulatory Challenges Participate in Hearings: Attend all environmental assessment, zoning, and permitting hearings to voice opposition. Demand Environmental Studies:Challenge the project by demanding ...

Report

Attachment Concerned but hopeful

  • Marshdale Natural Gas Power Generation Facility Project
  • Author: Danny Cameron
  • Reference number: 19
  • Submitted: 2026-02-09 - 10:20 PM
  • Project phase: Planning
  • Participation notice: Public notice - Comments invited on the summaries of the Initial Project Descriptions and funding available
  • I have mixed feeling about these natural gas plants. I would prefer no fossil fuels but when it's a huge difference compared to coal and the timeline involved, it's hard to argue. However, there are significant concerns that I don't feel have been properly addressed/researched yet to make an informed decision if you're the government that is, anytime soon. I know we're under the gun for 2030 but we have to get this right if it's going to be done here and or in Salt Springs. I will copy and paste a document that I wrote-up and had touched-up a bit by AI for reading clarity: Marshdale Natural Gas Plant – Community and Environmental Concerns In regard to water: Summer 2025 produced a significant drought in our area. The East River flowing through Stellarton was so low that rocks were visible above the water — something I cannot recall seeing in my 39 years living here. We experienced several consecutive weeks without rain. Drilling is taking place at depths of approximately 500 metres. Based on publicly available information, it is unclear where groundwater at this depth ultimately discharges. Water must flow somewhere. Even in the absence of a known surface stream or conduit leading from the proposed site to the East River, subsurface connections cannot be ruled out. Has any groundwater tracing or monitoring (for example, tracer studies) been considered to determine where this water ultimately ends up? The water used at the site is converted to steam. Can this steam be captured, condensed, and reused — for example, to support or restore nearby marshes? Even if groundwater is accessed at depth, removing this volume of water ...

Report

Attachment Environmental Concerns pertaining to the Marshdale Natural Gas Power Generation Facility

  • Marshdale Natural Gas Power Generation Facility Project
  • Author: Ecology Action Centre
  • Reference number: 18
  • Submitted: 2026-02-09 - 9:02 PM
  • Project phase: Planning
  • Participation notice: Public notice - Comments invited on the summaries of the Initial Project Descriptions and funding available
  • Attached are the Ecology ACtion Centre's concerns re the Marshdale Natural Gas Power Generation Facility to be sumbitted to the Imact Assessment Agency of Canada
  • Attachment included
  • The Ecology Action Centre is concerned about the development of the proposed Marshdale Gas plant. These gas plants will not support decarbonization and ultimately limit environmental progress. Our comments are based upon the EA Registration Documents for the proposed project Marshdale. 1) The proponent – IESO – is a non-for profit responsible for the planning and reliable operation of Nova Scotia’s bulk electricity system. Whereas the purpose of EA is to promote sustainable development by protecting and conserving the environment, the EAC seeks to identify and assess adverse effects on the environment. The involvement of NGOs and the general public is crucial to achieve this goal, and the EAC appreciates the opportunity to engage with the IESO on the construction of gas plants. The Proponent’s Guide to Environmental Assessment notes that “in certain circumstances, special consultations may be held with First Nations.” The EAC urges the proponent to engage in the aforementioned special consultations given the relative proximity of both projects to Pictou Landing First Nation, and the history of environmental racism in Nova Scotia. Nova Scotia environment minister Iain Rankin has referred to decades of effluent dumping in Boat Harbor as one of the worst cases of environmental racism in Canada, and it is important that both the proponent and the Department of Environment and Climate Change (NSECC) ensure that the consultation process for the EA is perceived as legitimate by the general public and Mi’kmaq people specifically. Every opportunity should be taken to consult with First Nations, and we strongly believe special consultation is warranted as the part of this EA process. 2) In ...

Report

Attachment Physicians' comments on proposed Nova Scotia gas plants

  • Marshdale Natural Gas Power Generation Facility Project
  • Author: Administrator on behalf of Catherine Cervin
  • Reference number: 24
  • Submitted: 2026-02-09 - 8:50 PM
  • Project phase: Planning
  • Participation notice: Public notice - Comments invited on the summaries of the Initial Project Descriptions and funding available
  • See the attached submission / Veuillez consulter la pièce jointe
  • Attachment included
  • Impact Assessment Agency of Canada 200-1801 Hollis Street Halifax, Nova Scotia B3J 3N4 Marshdale Natural Gas Power Generation Facility Project Project reference number: 90111 Email: Marshdale@iaac-aeic.gc.ca Salt Springs Natural Gas Power Generation Facility Project Email: SaltSprings@iaac-aeic.gc.ca Project reference number: 90114 Environmental Assessment Branch Department of Environment and Climate Change PO Box 442 Halifax, NS, B3J 2P8 Email: ea@novascotia.ca; EA@gov.ns.ca February 9, 2026 RE: Fast Acting Natural Gas Power Generation Facility – Marshdale and Salt Springs As physicians and healthcare providers representing the Canadian Association of Physicians for the Environment (CAPE) in Nova Scotia, we are submitting our concerns regarding the proposed fast-acting natural gas power generation facilities for Marshdale and Salt Springs in Pictou County, submitted by IESO Nova Scotia. CAPE is a national non-partisan, physician-led organization with over 36,000 supporters and regional committees in 9 provinces, including Nova Scotia. We bring an evidence-based and health-focused approach to the intersecting issues of environment, health, and social justice. For the purposes of this submission, CAPE Nova Scotia will address and refute the proponent’s assumption that the construction and operation of these 300 MW gas power generating facilities in Marshdale— for a minimum of 30 years—pose negligible risk to the health and wellbeing of Nova Scotians. 1 What Is Natural Gas? While the industry frequently uses the term "natural gas" to suggest a clean or organic energy source, this phrasing is a marketing descriptor rather than a scientific one. From a medical ...

Report

Attachment No to the Natural Gas Power Plants

  • Marshdale Natural Gas Power Generation Facility Project
  • Author: Lori Ashley
  • Reference number: 17
  • Submitted: 2026-02-09 - 7:56 PM
  • Project phase: Planning
  • Participation notice: Public notice - Comments invited on the summaries of the Initial Project Descriptions and funding available
  • To Whom It May Concern,   I am writing as a concerned resident of Pictou County to make known my opposition to the proposed Natural Gas Power Generation Facilities in Pictou County.   The report appears to be a desktop review. There is lacking exploratory based information on the impacts to the actual rural locations for these Power Plants. One of the biggest concerns is the amount of water usage for cooling and cleaning (equivalent usage of 750 Rural Homes). Have alternative cooling solutions been explored? What were those solutions and what was the outcome? The report indicates mitigation if local water quality and supply are impacted, but nothing indicates what those mitigations will be. Residents should have a clear understanding of what that plan is. Is there a possibility of recycling the used water back into cooling the facility instead of releasing it into the environment? The report also indicates water testing was taking place in December of 2025, but I have not found the results of that testing (nor details on what tests were being done).   In one breath the report states they will be a back up facility only operating when there are strains on the grid, and in the next it states they are to phase out the coal facility. Which is it? The offshore NS pipeline is permanently shut off so we will be reliant on natural gas coming from the south either from or through the US – given the strained relationship with our neighbour to the south is it wise to put so much reliance on that as a source?   The sound and vibration generated will have impacts on the environment and residents ...

Report

Attachment Sipekne'katik First Nation Comments on Marshdale Natural Gas Power Generation Project

  • Marshdale Natural Gas Power Generation Facility Project
  • Author: Administrator on behalf of Sipekne'katik First Nation
  • Reference number: 23
  • Submitted: 2026-02-09 - 7:54 PM
  • Project phase: Planning
  • Participation notice: Public notice - Comments invited on the summaries of the Initial Project Descriptions and funding available
  • See the attached submission / Veuillez consulter la pièce jointe  
  • Attachment included
  • February 9, 2026 Impact Assessment Agency of Canada 200-1801 Hollis Street Halifax, Nova Scotia B3J 3N4 RE: COMMENTS ON MARSHDALE NATURAL GAS POWER GENERATION PROJECT PROPOSED BY THE NOVA SCOTIA INDEPENDENT ENERGY SYSTEM OPERATOR (IESO) Sipekne’katik First Nation Initial Comments Disclaimer - (Impact Assessment Act, s. 12) This submission provides interim comments and observations from Sipekne’katik First Nation concerning the Marshdale Natural Gas Power Generation Project, as submitted for initial review to the Impact Assessment Agency Canada (IAAC) by the Nova Scotia Independent Energy Operator (IESO). These comments do not represent Sipekne’katik’s final position or decision on the Project, nor do they constitute consent. The project has not yet been formally under the Sipekne’katik Governance Initiative (SGI), which is the sole process recognized by Sipekne’katik First Nation for conducting consultation with its community members. Accordingly, these comments must not be relied upon by the Proponent or any regulatory authority as evidence or satisfaction of the Crown's Duty to Consult under Section 35 of the Constitution Act, 1982, nor should they be treated as part of any formal consultation record involving Sipekne’katik First Nation. Sipekne’katik First Nation expects that IAAC will duly consider the comments provided below as part of its review of the Project. Concern with the Engagement Process - (Impact Assessment Act, s. 12 & s. 22(1)(c)) Before any further review, it is essential to distinguish between Rights holders and stakeholders clearly. Indigenous peoples are not merely another group of stakeholders; they are Rights ...

Report

Attachment No to Fast Reacting Fossil Fuel Power Plant pollution - we have clean energy options

  • Marshdale Natural Gas Power Generation Facility Project
  • Author: Environmentalist, Researcher
  • Reference number: 16
  • Submitted: 2026-02-09 - 3:14 PM
  • Project phase: Planning
  • Participation notice: Public notice - Comments invited on the summaries of the Initial Project Descriptions and funding available
  • February 09, 2026 Public Comment on NS Project Environmental Assessment: Re: Fast Reacting Fossil Fuel Gas power plants  - comment to both [1] Saltspring, NS and [2] Marshdale, NS [1] NO to new fossil fuel power plants –there should be no approval to using combustion carbon fossil fuel technology due to the fossil fuel combustion air pollution and increased carbon accumulative impacts over the proposed 30 years – we need change and we have a clean tech option [2 NO to the location and concept model - while fast reacting power plants on demand are needed for grid balance the should be decentralized and distributed along the grid and clean technologies that do no release air pollution or carbon emissions [3] Agriculture and local food security relies on rural lands air and water --so it is not the place to construct brand new fossil fuel combustion power plants to release small Particulate matter pollution. [4] Current Federal and Provincial laws set a path to mitigate carbon emissions and shift to clean energy supply – so with real options  -  an approval would not comply with the mandate of our laws. ===What we need to do === More Wind and more solar and more grid scale batteries distributed along the grid.....plus now is the time to deploy Canadian made fast reacting Hydrogen PEM Fuel Cells ...clean power to meet demand supply and balance the power grid. TO BE CLEAR -- NO to the fossil fuel GAS Plants -- based on the impacts of pollution and carbon release. So…PLEASE deny the project the Environment Assessment --- and Please CONSIDER the options and opportunity to deploy fast reacting clean tech ...

Report

Attachment EAs for the Proposed Marshdale & Saltspring Gas plants

  • Marshdale Natural Gas Power Generation Facility Project
  • Author: Administrator on behalf of Jennyfer Brickenden/Scott Macmillan
  • Reference number: 13
  • Submitted: 2026-02-05 - 11:19 AM
  • Project phase: Planning
  • Participation notice: Public notice - Comments invited on the summaries of the Initial Project Descriptions and funding available
  • Good morning;   I find it difficult to have to address this issue of the proposed Marshdale and Saltsprings Gas plants.  Nova Scotians have so roundly objected to fracking for Natural Gas to the point of banning it in our province. Without consideration this current government has made a complete reversal and has gone so far as to fund Dalhousie University to the tune of $30 million to promote industrial development of this industry in our province. These government directions are reckless and regressive, undermining the wishes of the people of NS to truly decarbonize but demonstrating quite clearly that it is the fossil fuel/oil interests that are all that really matter to this government.   The Environmental Assessments for two proposed 300MW gas plants lack independent unbiased scrutiny and have failed completely to fulfill the requirement to examine project alternatives. The report that renewables are not up for the task lacked the scrutiny needed and simply fell back on the interests of the fossil fuel industry's desire to build at enormous expense, (roughly $1 Billion ea), infrastructure that could be done at a fraction of the costs by utilizing battery storage through renewable sources.   And It's not just the capital cost of these gas plants to consider, but also the long-term fuel and operating and maintenance costs, over 40 years, which have also not properly been examined by the EAs. So again by not examining the possible alternatives the EAs conclusion are a reckless disservice to the people of NS.   Just how independent is the Nova Scotia Independent Energy System Operator, whose transparent bias to ...

Report

Attachment EAs Marshdale and Salt Spring, Pictou Co.

  • Marshdale Natural Gas Power Generation Facility Project
  • Author: Administrator on behalf of David Craig
  • Reference number: 15
  • Submitted: 2026-02-03 - 6:48 PM
  • Project phase: Planning
  • Participation notice: Public notice - Comments invited on the summaries of the Initial Project Descriptions and funding available
  • FYI   I am writing as a resident of Pictou Co.  Both of the Environmental Assessments for the proposed Marshdale and Salt Spring sites should be dismissed.  Below, please find comprehensive arguments prepared by alternate energy expert Neal Livingston that in my opinion, obviate any serious consideration of these projects.  I echo his objections.   To these comments I will also add my voice to the concerns already expressed by many Pictou County residents regarding the excessive use of water these proposed projects are projected to use.  The summer of 2025 should alarm all Nova Scotians given the lengthy drought that was experienced.  This type of drought should be expected to occur again in the future.  Large industrial sites such as those proposed that use huge amounts of water would put the public at risk and affect other industries such as agriculture.    Nova Scotia should not be considering investing billions of dollars in fossil fuels especially given the tremendous advance of renewable energy technologies.  These proposed projects in Marshdale and Salt Springs are egregiously out of step with our country’s energy future.  Instead, Nova Scotia should continue to focus on wind and solar and related technologies as it has been doing and not be distracted by the fantastical claims of fossil fuel based technologies.   Please register my opposition to these projects.

Report

Attachment The Environmental Assessments for the Proposed Marshdale and Saltspring Gas Plants In Nova Scotia Should be Summarily Dismissed, and the Projects Cancelled

  • Marshdale Natural Gas Power Generation Facility Project
  • Author: Administrator on behalf of Neal Livingston
  • Reference number: 27
  • Submitted: 2026-02-01 - 4:39 AM
  • Project phase: Planning
  • Participation notice: Public notice - Comments invited on the summaries of the Initial Project Descriptions and funding available
  • See the attached submission / Veuillez consulter la pièce jointe
  • Attachment included
  • From: Neal Livingston February 1, 2026 Box 55, Mabou, Nova Scotia Canada B0E 1X0 mobile 902-456-2004 blackriverneal@gmail.com www.blackriver.group To: Hon. Timothy Halman and Hon. Julie Dabrusin Minister Department of Environment Minister Environment 1894 Barrington Street, Suite 1800 House of Commons P.O. Box 442, Halifax, NS, B3J 2P8 OEawa, Ontario K1A 0A6 Minister.Environment@novascoMa.ca ministre-minister@ec.gc.ca The Environmental Assessments for the Proposed Marshdale and Saltspring Gas Plants In Nova Sco;a Should be Summarily Dismissed, and the Projects Cancelled ________________________________________________________________________________________ Neal Livingston has had an independent career in Nova Sco4a in energy produc4on for over 45 years from domes4c to commercial grid scale, in hydroelectric, wind, and solar. Parallel to this commercial career, as a volunteer he has been worked to promote clean energy solu4ons for Nova Sco4a. Between 2010 and 2020 he was a founding member of a volunteer community group Clean Power Now, that worked to get Nova Sco4a off fossil fuels by impor4ng electricity from Hydro Quebec. This included holding mee4ngs at the federal level with execu4ve assistants to the federal minister of energy, provincial level mee4ngs with senior staff in Quebec, New Brunswick, and Nova Sco4a, and mee4ngs with the Vice-President levels at Nova Sco4a Power, and Hydro Quebec. ------------------------------------------------------------------------------------------------------------------------------ Dear Ministers of Environment: Unacceptable EAs - Dismiss the two 300 MW gas plant proposals for Nova ScoMa: The ...

Report

Attachment False information and no actionable guarantees when the plant is not run as advertised and ruins more land in Pictou County.

  • Marshdale Natural Gas Power Generation Facility Project
  • Author: Janna McCullough
  • Reference number: 8
  • Submitted: 2026-01-27 - 4:53 PM
  • Project phase: Planning
  • Participation notice: Public notice - Comments invited on the summaries of the Initial Project Descriptions and funding available
  • The Conservative leader, Marco MacLeod, is blindly following a private company. If there is truly no risk to wells in the area, why is there no agreement in place that holds the company accountable if wells run dry or if the well water is no longer drinkable? If the plant is supposed to operate only as a backup power source, why is there no guarantee regarding the number of hours it will operate? From the information provided, there are no assurances to hold the company accountable if water becomes contaminated or wells go dry. There is also nothing addressing sound pollution or the devaluation of land in the surrounding area. Meetings regarding the construction of this plant were not widely advertised, and invitations were not even sent to those — including myself — who have been actively contacting the local MLA with questions and concerns about the project. As has been seen in other areas of Pictou County, there will likely be years of court litigation to determine responsibility for the damage caused by this plant, as MacLeod appears short-sighted and focused only on his current term in office. There must be guarantees regarding water protection, hours of operation, and the amount of diesel involved with the plant. This is not clean energy. When looking at the plant as a whole, including its long-term environmental impacts, MacLeod and the company he supports are providing false information and misleading perceptions. Janna McCullough

Report

Attachment Formal Opposition to the Salt Springs Natural Gas Power Generation Facility Project

  • Marshdale Natural Gas Power Generation Facility Project
  • Author: The Hollow at Lovat, our home
  • Reference number: 7
  • Submitted: 2026-01-24 - 9:50 AM
  • Project phase: Planning
  • Participation notice: Public notice - Comments invited on the summaries of the Initial Project Descriptions and funding available
  • To Whom It May Concern,   I am writing as a resident of Lovat Road in Salt Springs (The Hollow) to formally register my opposition to the proposed Fast Acting Natural Gas Power Generation Facilities (PIDs 00851287, 65049983, 00846311, and 65177198).   As a homeowner whose property is  adjacent to the project area, I am deeply concerned by the lack of localized data regarding the long-term impacts on our community’s water security, air quality, and the fundamental rural character of Salt Springs.   1. Water Security and Aquifer Depletion The proposal indicates a water requirement equivalent to 750 households (approx. 330,000 liters per day). My property, and those of my neighbors, relies entirely on private wells tapping into a shared bedrock aquifer.   The Omission: The Environmental Assessment Registration Document (p. 51, 120) admits that a comprehensive hydrogeological field study has been deferred to the permitting stage. It is scientifically irresponsible to grant environmental approval before determining the "Zone of Influence" of such a massive industrial draw.   The Risk: Without this data, there is no guarantee against "drawdown," which would leave residential wells dry, or "upconing," which could draw salinity into our fresh water supply—a known risk in the Salt Springs geological formation. I demand that a multi-season hydrogeological study be completed and made public before any approvals are considered.   2. Contradiction of Rural Character The residents of Salt Springs have consciously chosen a ...