Ontario Pumped Storage Hydropower Project
Cooperation Plan
Ontario Pumped Storage Hydropower Project
Document reference number: 352
September 1, 2026
Table of Contents
- 1. Introduction
- 2. Project
- 3. Approach to cooperation
- 4. Gathering and review of proponent information
- 5. Timelines and time management
- 6. Sharing of information
- 7. Public participation and participant funding
- 8. Indigenous consultation and engagement
- 9. Decision statement
- 10. Interpretation
- 11. Contact information
- Appendix 1 – Participating ministries
- Appendix 2 – Provincial regulatory frameworks
1. Introduction
On May 29, 2026, the Impact Assessment Agency of Canada (IAAC) determined that an impact assessment (IA) is required for the Ontario Pumped Storage Hydropower Project (the project), pursuant to section 16(1) of the Impact Assessment Act.
Aspects of the project may be subject to the provincial Class Environmental Assessment for Resource Stewardship and Facility Development Projects (RSFD Class EA) and the Class EA for Transmission Facilities pursuant to Ontario's Environmental Assessment Act, and to various provincial permitting and approval requirements that include an assessment of environmental effects.
The Cooperation Plan (the plan) was developed by IAAC with input from Ontario ministries and regulatory agenciesFootnote 1 (herein referred to as "participating ministries") to set out intentions and plans for a cooperative assessment process for the project. The Plan was developed in support of the intent of "one project-one assessment." The participating ministries in the impact assessment are included in Appendix 1 and the anticipated provincial regulatory frameworks (including but not limited to permits, environmental assessments or registrations, compliance limits, and land use policies) that may apply to the project are included in Appendix 2.
This Plan is intended to be flexible and does not prevent IAAC or participating ministries from making changes to the cooperative approach described in this Plan in response to changes that may occur during the assessment process.
For anticipated federal permits required, please see the project's Detailed Permitting Plan.
2. Project
TC Energy (the proponent) is proposing to construct and operate a pumped storage hydropower facility located at the Department of National Defence's Army Training Centre – Central (ATCC), (formerly known as 4th Canadian Division Training Centre) near Meaford, Ontario, on Nottawasaga Bay. As proposed, the project would store excess electricity from the grid by moving water from the bay to a reservoir, that would then be released back to the bay to generate electricity during periods of demand. It will have a production capacity of 1000 megawatts and will operate indefinitely.
For more information on the impact assessment of the project or to view the information and comments received, visit the Canadian Impact Assessment Registry (the registry) at https://iaac-aeic.gc.ca/050/evaluations/proj/89803?culture=en-CA.
3. Approach to cooperation
On December 18, 2025, the Government of Canada and the Government of Ontario signed a Co-operation Agreement on Environmental and Impact Assessment. Through cooperation, IAAC and potential participating Ontario ministries (see Appendix 1) will strive to increase efficiency and certainty for the proponent, as well as for the public and Indigenous communities, and ensure that the best available expertise is shared and applied. Where possible, IAAC may coordinate activities with participating ministries, to best share expertise. Each jurisdiction will retain its own decision-making authority in accordance with their respective legislative requirements.
The following table outlines potential opportunities for cooperationFootnote 2, subject to proponent timelines for planning, design decisions, and sequencing of approvals. Provincial regulatory frameworks will only apply to project activities under provincial jurisdiction.
|
Project Activity |
Responsible Entity |
Potentially Applicable Regulatory FrameworkFootnote 3 |
Potential Opportunities for Cooperation |
|---|---|---|---|
|
Water taking/dewatering activities during construction and operations |
Ontario Ministry of the Environment, Conservation and Parks |
Permit to Take Water under the Ontario Water Resources Act and/or registration on the Environmental Activity and Sector Registry |
|
|
Activities that are likely to result in killing or harming species at risk or their habitat off federal lands |
Ontario Ministry of the Environment, Conservation and Parks |
Registration and/or Permits under the Species Conservation Act, 2025 |
|
|
Potential effects to natural hazard features from project activities within the Municipality of Meaford and 5 km into Georgian Bay, off federal lands |
Grey Sauble Conservation Authority |
Permits under the Conservation Authorities Act |
|
|
Discharge of industrial sewage, and stormwater |
Ontario Ministry of the Environment, Conservation and Parks |
Environmental Compliance Approvals under the Ontario Water Resources Act |
|
|
Air and noise emissions |
Ontario Ministry of the Environment, Conservation and Parks |
Environmental Compliance Approvals for Air and Noise under the Environmental Protection Act or registration on the Environmental Activity and Sector Registry |
|
|
In-water construction in Georgian Bay including the inlet/outlet structure and marine access infrastructure |
Ontario Ministry of Natural Resources |
Permits and authorizations under the Public Lands Act to grant occupational authority, including the Class Environmental Assessment for Resource Stewardship and Facility Development Projects |
|
4. Gathering and review of proponent information
A Government Review Team (GRT), consisting of federal authorities and participating ministries with relevant expertise on the project, has been established. IAAC will continue to involve and share information with relevant Ontario ministries as members of the GRT (listed in Appendix 1). Timely review of proponent information by the GRT will support an efficient assessment, provide opportunities for early input on potentially applicable provincial regulatory frameworks, and allow updates, if needed, to the approach described in this Plan, should changes affect the Province of Ontario's role in the assessment process.
The following table identifies factors considered by IAAC and participating ministries where opportunities exist for cooperation to support information sharing, expert advice and reduced duplication.Footnote 4
|
Common Factors related to the Assessment |
Common Areas of Federal & Provincial Review |
|---|---|
|
Changes to the natural and physical environment |
Atmospheric, acoustic and visual environment Riparian, wetland and terrestrial environment Groundwater and surface water Fish and fish habitat Terrestrial wildlife and habitat Species at RiskFootnote 5 |
|
Changes to health, social and economic conditions |
Land, water and resource use for recreation, tourism and commercial operations Navigation Cultural heritage resources (non-Indigenous) Public health and safety Traffic emissions, control and access Business, employment and service demands |
|
Impacts on Indigenous Peoples and the exercise of Aboriginal and treaty rights |
Physical and cultural heritage Navigation Traditional use of lands and resources Structures/sites/things of significance Aboriginal and treaty rights |
|
Other effects |
Effects of the environment on the project, including climate change resiliency |
IAAC has prepared Tailored Information and Studies Guidelines that set out the information required of the proponent in the Impact Statement. General information requirements for the provincial regulatory frameworks are available in references listed in Appendix 2.
IAAC and provincial ministries may participate in technical working groups with the proponent, Indigenous communities, federal expert departments, and community groups, as appropriate.
5. Timelines and time management
IAAC and participating ministries have agreed to undertake their respective assessment processes in a cooperative manner such that government review of proponent submissions (e.g., Impact Statement, Environmental Study Reports for Class Environmental Assessments) are coordinated, where possible when submissions align. IAAC will also work with the GRT to ensure that timely and effective communication occurs throughout the assessment process.
Where suitable, the proponent and participating ministries are also encouraged to align early government review and engagement on regulatory frameworks with IAAC's comment period on the draft Impact Assessment Report and draft potential federal conditions.
IAAC recognizes that efforts to align respective timelines do not supersede legislative obligations concerning time limits, which are prescribed in the IAA and relevant provincial legislation.
6. Sharing of information
IAAC and participating ministries will share, as appropriate, the following information obtained during the assessments of the project on matters identified in Table 2:
- expert advice received;
- existing studies and information;
- comments from Indigenous communities, subject to confidentiality requirements;
- information received from the proponent (e.g., technical submissions);
- provincial regulatory, policy or other instruments and measures that could manage potential adverse effects of the project (e.g., complementary measures), and regulatory decision criteria;
- public comments;
- information requests;
- responses to information requests; and
- draft federal conditions.
IAAC and participating ministries will, subject to applicable legislation, endeavour to respect preferences of Indigenous communities related to confidentiality of Indigenous Knowledge.
7. Public participation and participant funding
If the province or proponent identifies comment periods for potential provincial regulatory frameworks and approval applications that can be aligned with impact assessment comment periods, IAAC will collaborate with participating ministries to include links to each other's websites, coordinate public notices, and share comments received, where appropriate.
Funding to support public participation in the federal impact assessment process is available through IAAC's Participant Funding Program. For information about the activities that are eligible for funding or on how to apply for funding please see the National Program Guidelines on the following page, https://www.canada.ca/en/impact-assessment-agency/services/public-participation-impact-assessments/funding-programs/participant-funding-program.html.
For further information on public participation and engagement activities, please see the project's Public Participation Plan.
8. Indigenous consultation and engagement
IAAC will lead Crown Consultation on behalf of the Government of Canada for this assessment. If applicable, Ontario would be responsible for Crown Consultation for applicable provincial decisions. Where participating ministries also have consultation obligations, federal and provincial consultation and engagement may be aligned, where appropriate and in collaboration with Indigenous communities, to minimize consultation fatigue and promote information sharing. For further information on proposed Indigenous consultation and engagement activities for the assessment, please see the project's Indigenous Engagement and Partnership Plan.
9. Decision statement
If applicable, IAAC will consult with participating ministries regarding draft federal conditions to ensure consistency of draft federal conditions and improve regulatory efficiencies.
10. Interpretation
This Plan is not a legal document and does not change any existing federal, provincial, or Indigenous legislative or regulatory jurisdiction, right, power, privilege, prerogative or immunity by virtue, nor does it create any new legal powers, duties or legally binding obligations.
11. Contact information
The IAAC office designated for administering the impact assessment of the project is:
Impact Assessment Agency of Canada
Ontario Regional Office
Email: Nottawasaga@iaac-aeic.gc.ca
Contact information for participating Ontario ministries and organizations is provided in Appendix 1.
Appendix 1 – Participating ministries
The following is a list of participating ministries and contact information, including their relevant areas of expertise for the assessment of the project.
|
Provincial Ministry |
Relevant Areas of Expertise |
Contact Information |
|---|---|---|
|
Grey Sauble Conservation AuthorityFootnote 6 |
Watershed management, natural hazard risk management (flooding, erosion, unstable soils, shorelines, wetlands, watercourses, dynamic beaches and unstable bedrock), and land use planning. |
Planning and Regulations |
|
Ministry of Citizenship and Multiculturalism |
Cultural heritage resources, including archaeological resources, built heritage resources, and cultural heritage landscapes. Archaeological resources including artifacts, archaeological sites, and marine archaeological sites. |
Heritage Planning Unit Heritage Operations Branch Citizenship, Inclusion, and Heritage Division |
|
Ministry of Energy and MinesFootnote 7 |
Electricity policy and planning, electricity pricing, infrastructure development (generation and transmission), energy efficiency and conservation. |
Electricity Policy and Economics Unit |
|
Ministry of the Environment, Conservation and Parks |
Air quality, noise impacts, groundwater and surface water (including sewage, stormwater management, and water taking), drinking water sources, protected species, environmental spills (land and surface water), alternatives assessment, and Aboriginal and treaty rights. |
Environmental Assessment Branch |
|
Ministry of Natural Resources |
Ontario's fish and wildlife resources, management of Ontario's crown resources (lands, forests, water, oil, gas, salt and aggregates, provincially significant wetlands), outdoor recreation and resource use (fishing, hunting, trapping), and renewable energy on crown lands and natural hazards. |
Land Use Planning and Strategic Issues Section |
|
Ministry of Tourism, Culture and Gaming |
Tourism, including resource-based tourism |
Tourism Policy Unit |
Appendix 2 – Provincial regulatory frameworks
The following is a preliminary list of provincial regulatory frameworks that may apply if the project proceeds to permitting.
|
Provincial Ministry or Organization |
Regulatory Framework and Reference |
|---|---|
|
Grey Sauble Conservation Authority |
Permit under O. Reg 41/24 (Prohibited Activities, Exemptions and Permits) for development, interference with wetlands, and alterations to shorelines and watercourses under the Conservation Authorities Act https://www.ontario.ca/laws/regulation/r24041 https://www.greysauble.on.ca/planning-regulations/plan-inputreview-regulations/ |
|
Ministry of Citizenship and Multiculturalism |
Cultural heritage study and archaeological assessment under the Ontario Heritage Act https://www.ontario.ca/page/archaeology https://www.ontario.ca/laws/statute/90o18 |
|
Standards and Guidelines for Conservation of Provincial Heritage Properties https://www.ontario.ca/page/standards-and-guidelines-conservation-provincial-heritage-properties |
|
|
Standards and Guidelines for Consultant Archaeologists https://www.ontario.ca/page/standards-and-guidelines-consultant-archaeologists |
|
|
Ministry of Energy and Mines including the Ontario Energy Board and Independent Electricity System Operator |
Approvals for a revenue framework for the project under the Electricity Act, 1998 https://www.ontario.ca/laws/statute/98e15 The Ministry of Energy and Mines can direct the Independent Electricity System Operator pursuant to section 25.32 of the Electricity Act, 1998 in regard to the procurement of electricity resources to ensure the reliable operation of Ontario's electricity system in response to ongoing and growing electricity needs in the future. If the project was to be rate regulated by the Ontario Energy Board, a mandate expansion would be required under the Ontario Energy Board, 1998 as well as amendments to Ontario Regulation 53/05 which covers payments under Section 78.1 of the Ontario Energy Board Act, 1998. |
|
Approvals to construct an electricity transmission or distribution line under the Ontario Energy Board Act, 1998 https://www.ontario.ca/laws/statute/98o15 https://www.ieso.ca/Sector-Participants/Connection-Process/Overview |
|
|
Ministry of the Environment, Conservation and Parks |
Environmental Compliance Approval for Air, Noise and Sewage works under the Environmental Protection Act and Ontario Water Resources Act https://www.ontario.ca/page/environmental-compliance-approval |
|
Permit to Take Water or Registration on the Environmental Activity and Sector Registry under the Ontario Water Resources Act https://www.ontario.ca/page/permits-take-water https://www.ontario.ca/page/environmental-activity-and-sector-registry |
|
|
Registration and/or Permits under the Species Conservation Act, 2025 https://www.ontario.ca/laws/statute/25s04b |
|
|
Class EA for Transmission Facilities https://www.ontario.ca/page/class-ea-minor-transmission-facilities |
|
|
Ministry of Natural Resources |
Class EA for Resource Stewardship and Facility Development Projects https://www.ontario.ca/page/class-ea-resource-stewardship-and-facility-development-projects |
|
Work Permits and Land Use Permits under the Public Lands Act (1990) https://www.ontario.ca/page/crown-land-work-permits |
|
|
Licences under the Oil, Gas and Salt Resources Act https://www.ontario.ca/laws/statute/90p12 |
|
|
Licence to Collect Fish for Scientific Purposes and Wildlife Scientific Collector's Authorization under the Fish and Wildlife Conservation Act https://www.ontario.ca/laws/statute/97f41 |
|
|
Niagara Escarpment Commission |
Niagara Escarpment Development Permit under the Niagara Escarpment Planning and Development Act https://www.ontario.ca/laws/statute/90n02 |